China
Prior art keywords
station
test
electronic transformer
rotating disk
workpiece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420196274.8U
Other languages
Chinese (zh)
Inventor
郑伟欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN ZPONE ROBOT Co Ltd
Original Assignee
SHENZHEN ZPONE ROBOT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ZPONE ROBOT Co Ltd filed Critical SHENZHEN ZPONE ROBOT Co Ltd
Priority to CN201420196274.8U priority Critical patent/CN203929917U/en
Application granted granted Critical
Publication of CN203929917U publication Critical patent/CN203929917U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses a kind of electronic transformer general automation testing apparatus.It comprises worktable main body; Rotating disk is installed on platen, on rotating disk, comprises a loading and unloading station, an integration test station and a plurality of Hi-pot test station; Each station is equipped with test fixture, and test cell is all equipped with at test station place; Test cell comprises mounting seat, and two guide pillars are installed in mounting seat, and header board is installed on guide pillar, and fitting insulating panels on header board is installed cylinder between two guide pillars, and test probe is installed on insulcrete; Touch probe is installed in test station; At feeding station, slide rail is equipped with at place, and slide unit is installed on slide rail, and gas pawl is installed on slide unit, is provided with inductive switch on slide rail; Blanking station place is provided with motor, leading screw, and vacuum cup is installed on leading screw.Adopt after above-mentioned structure, simple in structure, convenient test, efficiency are high, and highly versatile takes up an area space smaller, and automaticity is higher, good test effect.

Description

Electronic transformer general automation testing apparatus
Technical field
The utility model relates to a kind of automated test device of transformer, specifically a kind of electronic transformer general automation testing apparatus.
Background technology
Electronic transformer needs to carry out integration test and various Hi-pot test after production completes, traditionally because the kind of transformer is many, in the exploitation of Universal test clamping apparatus and promote the use of and had certain progress, but still have dependence to operate manually, the test result of subjective visual instrument, and select, not only need to expend a large amount of manpowers, efficiency is also lower, operates not in place or subjective chance of makeing mistakes and is also difficult to avoid.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of simple in structure, and convenient test, efficiency are high, the electronic transformer general automation testing apparatus of highly versatile.
In order to solve the problems of the technologies described above, electronic transformer general automation testing apparatus of the present utility model, comprises by support and is arranged on the worktable main body that the platen between support forms; On platen, be positioned at centre position disc rotating disk is installed, on rotating disk, at least comprise a loading and unloading station, an integration test station and a plurality of Hi-pot test station; Rotating disk is driven and can be made rotating disk realize the components of rotation such as batch (-type) by pneumatic or electronic dispenser, and each waits a station in corresponding above-mentioned each station of the component of rotation; Each station in above-mentioned each station is equipped with at least one test fixture, and the test cell between platen and rotating disk is all equipped with at each integration test station and Hi-pot test station place; Described test cell comprises mounting seat, and two guide pillars are installed in mounting seat, and the top of two guide pillars is provided with header board, and insulcrete is installed on header board, and the many test probes that can touch test fixture contact are installed on insulcrete; Between two guide pillars, cylinder is installed; , Hi-pot test station top is provided with by cylinder control action, and then touches the FERRITE CORE of tested electronic transformer workpiece, thereby forms the touch probe in Hi-pot test loop; At feeding station place, be equipped with and tested electronic transformer workpiece can be transported to the other slide rail of feeding station, slide unit is installed on slide rail, the gas pawl that can pick up workpiece is installed on slide unit, on slide rail, is provided with and can senses the whether inductive switch in appropriate location of tested electronic transformer; Blanking station place is provided with by pulse controlled motor and by motor-driven leading screw, slide block is installed on leading screw, the vacuum cup that the electronic transformer workpiece that test can be completed sucks and mentions is installed on slide block, and the workpiece that the electronic transformer workpiece of having tested can drive workpiece that leading screw respectively will test passes through and test not to pass through by motor is delivered to different positions and puts down by discharging vacuum cup.
Described loading and unloading station is combined into an entire combination station, and loading and unloading are operated on entire combination station and complete.
Described loading and unloading station is set to separately respectively a feeding station and a blanking station, and loading and unloading work completes separately at feeding station and blanking station respectively.
Described in each, on test fixture, install one for guiding tested electronic transformer can place smoothly the location-plate of suitable position.
Described rotating disk is controlled by PLC control system.
Adopt after above-mentioned structure, integration test station clamp is connected with each test cell probe respectively with a plurality of Hi-pot test station clamps, the every grade after the component of rotation of Programmable Logic Controller PLC control rotating disk of equipment, cylinder push to test unit header board rises, probe on header board contacts with the contact of Universal test clamping apparatus, PLC automatically sends signal enabling instrument and starts test, instrument returns to the result of test to PLC, PLC records each workpiece at the state of each station test, when workpiece turns to blanking station, again workpiece is selected to the position that is placed into appointment according to test result, thereby multiple test and the sorting of electronic transformer have automatically been completed, install thus, not only simple in structure, convenient test, efficiency is high, highly versatile, and occupation of land space is smaller, automaticity is higher, test effect is also relatively good.
Accompanying drawing explanation
Fig. 1 is the perspective view of the utility model electronic transformer general automation testing apparatus.
Fig. 2 is the back side perspective view of the utility model electronic transformer general automation testing apparatus.
Embodiment
Below in conjunction with the drawings and specific embodiments, electronic transformer general purpose test equipment of the present utility model is described in further detail.
As shown in the figure, electronic transformer general purpose test equipment of the present utility model, comprises by support 1 and is arranged on the worktable main body that the platen 2 between support forms; On platen 2, be positioned at centre position disc rotating disk 3 is installed, on rotating disk 3, at least comprise a loading and unloading station, an integration test station and a plurality of (more than 2) Hi-pot test station; Rotating disk 3 is driven and can be made rotating disk realize the components of rotation such as batch (-type) by pneumatic or electronic dispenser, and each waits a station in corresponding above-mentioned each station of the component of rotation; Each station in above-mentioned each station is at least equipped with (being generally a 1-2) test fixture 5, and each integration test station and Hi-pot test station place are all provided with the test cell between platen 2 and rotating disk 3; Test cell comprises mounting seat 4, the top that 6, two guide pillars of two guide pillars are installed in mounting seat 4 is provided with header board 7, and insulcrete 8 is installed on header board 7, between two guide pillars, cylinder 9 is installed, the many test probes that can touch test fixture 5 contacts are installed on insulcrete 8; Thereby Hi-pot test station top is provided with by cylinder and controls the touch probe that FERRITE CORE flexible and then that touch tested electronic transformer workpiece forms Hi-pot test loop; At feeding station place, be equipped with and tested electronic transformer workpiece can be transported to the other slide rail 10 of feeding station, slide unit 11 is installed on slide rail 10, the gas pawl 12 that can pick up workpiece is installed on slide unit 11, on slide rail 10, is provided with and can senses the position whether tested electronic transformer is namely set in appropriate location and sense the inductive switch whether moving into place; Blanking station place is provided with by pulse controlled motor and by motor-driven leading screw 13, leading screw 13 top shoes, the vacuum cup 14 that the electronic transformer workpiece that test can be completed sucks and mentions is installed on slide block, and the electronic transformer workpiece of having tested can drive leading screw 13 the electronic transformer workpiece respectively test being passed through and the electronic transformer workpiece that test is not passed through deliver to different positions and put down by discharging vacuum cup 14 by motor.
In above-described embodiment, both said loading and unloading station can be combined into an entire combination station, loading and unloading are operated on entire combination station and complete, also loading and unloading station can be set to separately respectively to a feeding station and a blanking station, loading and unloading work completes separately at feeding station and blanking station respectively; Can also on each test fixture 5, install one for guiding tested electronic transformer can place smoothly the location-plate 15 of suitable (position of correct test) simultaneously, said test fixture is Universal test clamping apparatus of the prior art, the utility model is not to its detailed description, rotating disk in the utility model is controlled by PLC control system, realizes its rotation.
During work, slide rail, gas pawl, slide unit are housed at feeding station place, tested electronic transformer workpiece is by vibrating disk or manually push to the high-end rear downslide of slide rail, arrive behind the position at inductive switch place, gas pawl declines and picks up workpiece, then moves on to the another side of slide unit, puts down workpiece, this position is the feeding station of corresponding rotating disk just, and carries out accurately guiding location by the location-plate on Universal test clamping apparatus; At blanking station place, workpiece is sucked by vacuum cup and mentions, and by pulse controlled motor, drives leading screw, will test by delivering to different positions and put down with the workpiece not passing through respectively.

Claims (5)

1. an electronic transformer general automation testing apparatus, is characterized in that: comprise by support (1) and be arranged on the worktable main body that the platen (2) between support forms; On platen (2), be positioned at centre position disc rotating disk (3) is installed, on rotating disk (3), at least comprise a loading and unloading station, an integration test station and a plurality of Hi-pot test station; Described rotating disk (3) can be driven and be made rotating disk realize the components of rotation such as batch (-type) by pneumatic or electronic dispenser, and each waits a station in corresponding above-mentioned each station of the component of rotation; Each station in above-mentioned each station is equipped with at least one test fixture (5), and the test cell being positioned between platen (2) and rotating disk (3) is all equipped with at each integration test station and Hi-pot test station place; Described test cell comprises mounting seat (4), two guide pillars (6) are installed in mounting seat (4), the top of two guide pillars is provided with header board (7), insulcrete (8) is installed on header board (7), cylinder (9) is installed between two guide pillars, the many test probes that can touch test fixture (5) contact are installed on insulcrete (8); Thereby described Hi-pot test station top is provided with by cylinder and controls the touch probe that FERRITE CORE flexible and then that touch tested electronic transformer workpiece forms Hi-pot test loop; At feeding station place, be equipped with and tested electronic transformer workpiece can be transported to the other slide rail (10) of feeding station, slide unit (11) is installed on slide rail (10), the gas pawl (12) that can pick up workpiece is installed on slide unit (11), on described slide rail (10), is provided with and can senses the whether inductive switch in moving into place of tested electronic transformer; Described blanking station place is provided with by pulse controlled motor and by motor-driven leading screw (13), leading screw is provided with slide block on (13), the vacuum cup (14) that the electronic transformer workpiece that test can be completed sucks and mentions is installed on slide block, and the electronic transformer workpiece that described test completes can drive leading screw (13) workpiece respectively test being passed through and the workpiece that test is not passed through deliver to different positions and put down by discharging vacuum cup (14) by motor.
2. according to electronic transformer general automation testing apparatus claimed in claim 1, it is characterized in that: described loading and unloading station is combined into an entire combination station, and loading and unloading are operated on entire combination station and complete.
3. according to electronic transformer general automation testing apparatus claimed in claim 1, it is characterized in that: described loading and unloading station is set to separately respectively a feeding station and a blanking station, and loading and unloading work completes separately at feeding station and blanking station respectively.
4. according to electronic transformer general automation testing apparatus claimed in claim 1, it is characterized in that: test fixture described in each (5) is upper installs one for guiding tested electronic transformer can place smoothly the location-plate (15) of suitable position.
5. according to electronic transformer general automation testing apparatus claimed in claim 1, it is characterized in that: described rotating disk is controlled by PLC control system.
CN201420196274.8U 2014-04-22 2014-04-22 Electronic transformer general automation testing apparatus Expired - Fee Related CN203929917U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420196274.8U CN203929917U (en) 2014-04-22 2014-04-22 Electronic transformer general automation testing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420196274.8U CN203929917U (en) 2014-04-22 2014-04-22 Electronic transformer general automation testing apparatus

Publications (1)

Publication Number Publication Date
CN203929917U true CN203929917U (en) 2014-11-05

Family

ID=51825714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420196274.8U Expired - Fee Related CN203929917U (en) 2014-04-22 2014-04-22 Electronic transformer general automation testing apparatus

Country Status (1)

Country Link
CN (1) CN203929917U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106800183A (en) * 2017-03-15 2017-06-06 温州博诚汽车机电有限公司 A kind of idle motors examine mark all-in-one station arrangement eventually automatically
CN107504995A (en) * 2017-08-25 2017-12-22 重庆矢崎仪表有限公司 Multiple-station rotation automobile instrument test device
CN107728040A (en) * 2017-09-28 2018-02-23 胡君分 A kind of test device of pressure switch circuit plate
CN108594098A (en) * 2018-06-22 2018-09-28 海盐伟佳电器科技有限公司 A kind of mutual inductor detection dispensing all-in-one machine
CN109341586A (en) * 2018-11-22 2019-02-15 深圳市智信精密仪器有限公司 Non-contact 3-D measuring device and measuring method
CN109462810A (en) * 2018-12-19 2019-03-12 珠海市精实测控技术有限公司 A kind of Mobile phone horn aging testing system
CN109709457A (en) * 2019-01-22 2019-05-03 苏州工业职业技术学院 A kind of Insulation monitoring and thermal protector reset test device
CN111190108A (en) * 2020-04-09 2020-05-22 宁波均普智能制造股份有限公司 Electric vehicle battery manager test equipment
CN114428210A (en) * 2022-04-07 2022-05-03 维发电子科技(常州)有限公司 Efficient direct current contactor integrated test equipment

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106800183A (en) * 2017-03-15 2017-06-06 温州博诚汽车机电有限公司 A kind of idle motors examine mark all-in-one station arrangement eventually automatically
CN107504995A (en) * 2017-08-25 2017-12-22 重庆矢崎仪表有限公司 Multiple-station rotation automobile instrument test device
CN107728040A (en) * 2017-09-28 2018-02-23 胡君分 A kind of test device of pressure switch circuit plate
CN108594098A (en) * 2018-06-22 2018-09-28 海盐伟佳电器科技有限公司 A kind of mutual inductor detection dispensing all-in-one machine
CN109341586A (en) * 2018-11-22 2019-02-15 深圳市智信精密仪器有限公司 Non-contact 3-D measuring device and measuring method
CN109462810A (en) * 2018-12-19 2019-03-12 珠海市精实测控技术有限公司 A kind of Mobile phone horn aging testing system
CN109462810B (en) * 2018-12-19 2020-12-18 珠海市精实测控技术有限公司 Mobile phone horn aging test system
CN109709457A (en) * 2019-01-22 2019-05-03 苏州工业职业技术学院 A kind of Insulation monitoring and thermal protector reset test device
CN109709457B (en) * 2019-01-22 2023-12-12 苏州工业职业技术学院 Insulation detection and thermal protector reset testing device
CN111190108A (en) * 2020-04-09 2020-05-22 宁波均普智能制造股份有限公司 Electric vehicle battery manager test equipment
CN114428210A (en) * 2022-04-07 2022-05-03 维发电子科技(常州)有限公司 Efficient direct current contactor integrated test equipment

Similar Documents

Publication Publication Date Title
CN203929917U (en) Electronic transformer general automation testing apparatus
CN203858338U (en) Fully automatic FPC electrical testing machine
CN103331589B (en) Based on the full-automatic swappable device of memory bar of mainboard test
CN203266231U (en) Automatic feeding and blanking mechanism for machine tool
CN104227422A (en) Automatic testing, riveting and laser carving production line for wired charger
CN209411201U (en) A kind of cell piece efficiency detection device
CN104267351B (en) A kind of battery automatically testing sorting equipment
CN204449907U (en) Riveted radium carving equipment tested automatically by a kind of band line formula charger
CN203356987U (en) Abnormal sharpener mounting equipment
CN103447831B (en) A kind of processing line of boss part
CN110444366A (en) Magnetic material automatic magnetism-charging and detection tubulature all-in-one machine
CN106927265B (en) Automatic device that stacks of multilayer PCB board raw materials
CN203599838U (en) Fully-automatic combination assembling mechanism of screws and nuts
CN110170466A (en) A kind of potsherd detection device and detection method
CN110517878A (en) The encapsulated automatic wrapping machine of transformer core and its adhesive tape winding method
CN112621208A (en) Automatic assembling device for assembling connector
CN206040840U (en) Automatic material loading guillootine
CN108127391A (en) A kind of electric parking brake mandrel assembles assembly method
CN204086496U (en) A kind of battery automatically testing sorting equipment
CN203437929U (en) Machining line of boss parts
CN201010368Y (en) Holding tray separating mechanism of IC full-automatic holding tray detecting braider
CN107819099B (en) Automatic bending device of electric core tab
CN108161420A (en) A kind of electric parking brake mandrel assembles detection device
CN205199838U (en) High accuracy is from moving point system that glues based on robotechnology
CN104097800B (en) A kind of full-automatic dials pin machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20150422

EXPY Termination of patent right or utility model