CN203917884U - 一种连铸中间包 - Google Patents

一种连铸中间包 Download PDF

Info

Publication number
CN203917884U
CN203917884U CN201320712018.5U CN201320712018U CN203917884U CN 203917884 U CN203917884 U CN 203917884U CN 201320712018 U CN201320712018 U CN 201320712018U CN 203917884 U CN203917884 U CN 203917884U
Authority
CN
China
Prior art keywords
tundish
shock zone
continuous casting
gear
permanent layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320712018.5U
Other languages
English (en)
Inventor
沙学广
刘国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Magang Group Holding Co Ltd
Maanshan Iron and Steel Co Ltd
Original Assignee
Magang Group Holding Co Ltd
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Magang Group Holding Co Ltd, Maanshan Iron and Steel Co Ltd filed Critical Magang Group Holding Co Ltd
Priority to CN201320712018.5U priority Critical patent/CN203917884U/zh
Application granted granted Critical
Publication of CN203917884U publication Critical patent/CN203917884U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

本实用新型涉及一种连铸中间包,连铸中间包包括冲击区域和水口区域,所述中间区域为冲击区域,所述水口区域设于冲击区域的两侧,所述冲击区域设置于两挡坝之间,约5100mm长,砌筑一高于中间包内底平面的凸起平台。方法步骤为:在中间包冲击区域的中间包永久层上浇铸200mm永久层浇铸料;在其上涂抹工作层涂料;同时将中间包挡堰减薄至100mm并将下部截去200mm;中间包挡坝重新设计并减薄至100mm;在中间包挡坝表面开孔。

Description

一种连铸中间包
技术领域
本实用新型涉及一种连铸中间包。
背景技术
为确保铸坯质量,防止浇铸末期由于涡流的产生而导致的中间包渣的卷入,一般而言中间包需留有一定高度的钢水,我厂目前一般钢种中间包铸余高度控制在250mm,约12吨钢水;对夹杂物控制要求较高的钢种,中间包铸余高度控制在350mm,约18吨钢水。钢水收得率较低。
实用新型内容
鉴于影响浇铸安全、铸坯质量的主要因素是水口区域钢水的净高,为此提供一种连铸中间包,对中间包内腔砌筑工艺进行相关改进,实现包底阶梯状布局,在确保水口区域钢水高度的前提下,减少其他区域的余钢量。
具体技术方案如下:
一种连铸中间包,包括冲击区域和水口区域,所述中间包的中间区域为冲击区域,所述水口区域设于冲击区域的两侧。
进一步地,还具有常规的包壳、工作层、永久层,所述包壳位于永久层的外侧,所述工作层位于永久层内侧。
进一步地,所述工作层为一层涂在永久层上的涂料。
进一步地,所述冲击区域设置于两挡坝之间,砌筑一高于中间包内底平面的凸起平台,约5100mm长。
进一步地,所述凸起平台砌筑高度为200mm。
进一步地,还包括常规挡堰和挡坝,厚度均为100mm,挡坝表面开有孔。
上述连铸中间包的改进砌筑方法,采用如下步骤:
1)在中间包冲击区域的中间包永久层上砌铸200mm永久层浇铸料;
2)在永久层浇铸料上涂抹工作层涂料;
3)将中间包挡堰减薄至100mm并将下部截去200mm;
4)重新设计中间包挡坝,并减薄至100mm;
5)在中间包挡坝表面开孔。
进一步地,步骤(2)中涂抹的涂料与原涂料相接。
附图说明
图1为现有技术中间包内腔设计
图2为本实用新型中间包内腔设计
具体实施方式
下面根据附图对本实用新型进行详细描述,其为本实用新型多种实施方式中的一种优选实施例。
在现有中间包冲击区域2的永久层上砌筑200mm厚度的永久层6浇铸料,总长约5100mm,两边水口区域1维持现状,以在中间包包底形成一个台阶状的布局,在确保浇铸结束时水口区域1的净高(此为影响钢水质量及浇铸安全的关键)的前提下,有效减少铸余钢水量,即用耐火材料替代了钢水的位置,达到减少铸余钢水量的目的。
为实现这一目的,同时需对挡堰3、挡坝4重新设计,以确保铸余钢水量的减少目的的有效实现。
在中间包冲击区域2(两挡坝4之间,约5100mm长)采用在中间包永久层5上再浇铸200mm永久层6浇注料后,再涂抹工作层7涂料的方式施工;
将中间包挡堰3减薄(由于远离冲击部位,钢水冲刷小,可将挡堰3由原始的140mm,减薄至100mm),缩短(下部截去200mm);
重新设计中间包挡坝4,改变其形状并减薄至100mm,且在其表面开孔。
与现有技术相比,本实用新型效益为:包底砌筑工艺改变后被耐火材料替代的钢水吨位与废钢的差价,具体计算如下:
包底提高部位为一长5100mm,下底宽度700mm,上底宽度1000mm,高200mm的梯形体,其钢水吨位为:
5.1×[1/2×(0.7+1.0)×0.2]×7.3=6.33吨
耐火材料吨位为:
5.1×[1/2×(0.7+1.0)×0.2]×2.3=1.99吨
鉴于耐火材料可以重复使用(≥40次),加之挡堰3与挡坝4减薄存在一定的降本,两 相可以相抵。
以月施工150个中间包计,以浇铸钢水平均价格3030元/吨,废钢价格2300元/吨,则月效益为:
=150×6.33×(3030-2300)=69.31万元
即年效益为831.72万元:
结合附图对本实用新型进行了示例性描述,显然本实用新型具体实现并不受上述方式的限制,只要采用了本实用新型的技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本实用新型的保护范围之内。

Claims (3)

1.一种连铸中间包,包括冲击区域、水口区域和两挡坝,所述中间包的中间区域为冲击区域,所述水口区域设于冲击区域的两侧,所述冲击区域设置于两挡坝之间,其特征在于,所述冲击区域砌筑一高于中间包内底平面的凸起平台,两挡坝设置在凸起平台上,凸起平台的长度比冲击区域的长度大;凸起平台砌筑高度为200mm,还包括常规挡堰,挡堰和挡坝厚度均为100mm,挡坝表面开有孔。
2.如权利要求1所述的连铸中间包,其特征在于,还具有常规的包壳和工作层,所述包壳位于永久层的外侧,所述工作层位于永久层内侧。
3.如权利要求2所述的连铸中间包,其特征在于,所述工作层为一层涂在永久层上的涂料。
CN201320712018.5U 2013-11-12 2013-11-12 一种连铸中间包 Expired - Fee Related CN203917884U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320712018.5U CN203917884U (zh) 2013-11-12 2013-11-12 一种连铸中间包

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320712018.5U CN203917884U (zh) 2013-11-12 2013-11-12 一种连铸中间包

Publications (1)

Publication Number Publication Date
CN203917884U true CN203917884U (zh) 2014-11-05

Family

ID=51813765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320712018.5U Expired - Fee Related CN203917884U (zh) 2013-11-12 2013-11-12 一种连铸中间包

Country Status (1)

Country Link
CN (1) CN203917884U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106077544A (zh) * 2016-08-04 2016-11-09 浙江铁狮高温材料有限公司 连铸器分流系统
CN106825531A (zh) * 2017-01-18 2017-06-13 武汉精鼎科技股份有限公司 一种炼钢厂钢水连续浇铸用中间包的施工方法
CN108380848A (zh) * 2018-06-01 2018-08-10 常州凌风超智科技信息咨询有限公司 一种带双层环形挡渣堰的真空铸锭用中间包的应用方法
CN110614350A (zh) * 2019-10-11 2019-12-27 马鞍山钢铁股份有限公司 减少2机2流板坯连铸机中间包铸余的方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106077544A (zh) * 2016-08-04 2016-11-09 浙江铁狮高温材料有限公司 连铸器分流系统
CN106825531A (zh) * 2017-01-18 2017-06-13 武汉精鼎科技股份有限公司 一种炼钢厂钢水连续浇铸用中间包的施工方法
CN106825531B (zh) * 2017-01-18 2018-05-25 武汉精鼎科技股份有限公司 一种炼钢厂钢水连续浇铸用中间包的施工方法
CN108380848A (zh) * 2018-06-01 2018-08-10 常州凌风超智科技信息咨询有限公司 一种带双层环形挡渣堰的真空铸锭用中间包的应用方法
CN110614350A (zh) * 2019-10-11 2019-12-27 马鞍山钢铁股份有限公司 减少2机2流板坯连铸机中间包铸余的方法

Similar Documents

Publication Publication Date Title
CN203917884U (zh) 一种连铸中间包
CN105014028B (zh) 定径水口敞开式连铸方坯的冷料布放方法及起步开浇工艺
CN203725753U (zh) 炼钢钢包结构
CN104338926A (zh) 一种提高钢包自浇率及钢液纯净度的方法
CN103990787A (zh) 一种用于去除连铸中间包内钢液夹杂物的装置及方法
CN101774014B (zh) 一种带有挡渣堰的真空铸锭用中间包
CN201807729U (zh) 一种减少留钢量的连铸中间包
CN104107905A (zh) 一种板坯连铸中间包
CN205888058U (zh) 钢包内衬复合砌筑结构
CN106541120A (zh) 一种抑制钢水罐涡流卷渣的方法
CN105057651A (zh) 中间包控流装置
CN101722303A (zh) 一种连铸大方坯连续生产的快换工具
CN103170609A (zh) 一种铁合金炉前浇注成型设备和工艺
CN207823937U (zh) 一种钢包包底工作层砖
CN205183761U (zh) 一种钢包包底浇注结构
CN203944831U (zh) 新型防渗漏铁水罐内衬
CN201271738Y (zh) 连铸机中间包挡坝的结构
CN206296443U (zh) 一种具有导流孔挡板的中间包挡渣坝
CN201659283U (zh) 一种连铸大方坯连续生产的快换工具
CN205237051U (zh) 一种连铸中间包动态排渣装置
JP5803730B2 (ja) タンディッシュ堰の再使用方法
CN203956070U (zh) 一种用于去除连铸中间包内钢液夹杂物的装置
CN203778726U (zh) 一种能合理分流的十二流连铸机中间包
CN110614350A (zh) 减少2机2流板坯连铸机中间包铸余的方法
CN104148624B (zh) 铁水罐砌筑方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20211112

CF01 Termination of patent right due to non-payment of annual fee