CN203878787U - Connecting structure of building structure joint - Google Patents

Connecting structure of building structure joint Download PDF

Info

Publication number
CN203878787U
CN203878787U CN201420249960.7U CN201420249960U CN203878787U CN 203878787 U CN203878787 U CN 203878787U CN 201420249960 U CN201420249960 U CN 201420249960U CN 203878787 U CN203878787 U CN 203878787U
Authority
CN
China
Prior art keywords
bridge
building
joint
band
syndeton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420249960.7U
Other languages
Chinese (zh)
Inventor
郁钧珺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd
Original Assignee
SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd filed Critical SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd
Priority to CN201420249960.7U priority Critical patent/CN203878787U/en
Application granted granted Critical
Publication of CN203878787U publication Critical patent/CN203878787U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a connecting structure of a building structure joint. The connecting structure comprises a first bridge, a second bridge, a sealing band and filling materials. The first bridge and the second bridge are both arranged on the side wall of a building, the sealing band is arranged between the first bridge and the second bridge, and the filling materials are arranged above the sealing band. Due to the technology, the bridges of a single-joint steel structure are used for fixing, the water prevention effect is achieved by filling the joint with the polyurethane joint sealing materials, then the EPDM rubber sealing band is used for supporting a bottom, and finally the aims of being simple in structure, facilitating operation, preventing water and the like are achieved.

Description

A kind of syndeton of building structure seam
Technical field
The utility model relates to building structure field, relates in particular to a kind of syndeton of building structure seam.
Background technology
Structural joint refers to the general name of shrinkage joint, settlement joint and the aseismic joint etc. that arrange between adjacent two buildings or building two parts for fear of temperature movement, foundation settlement and earthquake collision etc.
At present, the structural joint of building between monomer is to be completed by the interdependent node of architectural discipline, but the structure of this kind of building node is relatively complicated, operates comparatively loaded down with trivial detailsly, and opposite and plane have impact, and do not solve well the problem of buildings waterproof.
Summary of the invention
In order to address the above problem, the utility model provides a kind of syndeton of building structure seam, has the advantages such as simple in structure, easy operating, and has good waterproof effect.
The syndeton of above-mentioned a kind of building structure seam comprises the first bridge, the second bridge, band and inserts, described the first bridge and the second bridge are all arranged on the sidewall of building, described band is arranged between the first bridge and the second bridge, and described inserts is arranged at the top of band.
In said structure, described bridge is single seam steel work.
In said structure, described band is EPT rubber packing band.
In said structure, described inserts is polyurethanes joint sealing material.
In said structure, described the first bridge and the second bridge are located in the same horizontal plane.
Advantage of the present utility model and beneficial effect are: the utility model provides a kind of syndeton of building structure seam, adopt the bridge of single seam steel work to be fixed, and play waterproof effect by filled polyurethane class joint sealing material, recycling EPT rubber packing band carries out backing, finally reach simple in structure, easy operating, and the object such as waterproof.
Brief description of the drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structural representation of syndeton in the utility model.
detailed description of the invention
Below in conjunction with drawings and Examples, detailed description of the invention of the present utility model is further described.Following examples are only for the technical solution of the utility model is more clearly described, and can not limit protection domain of the present utility model with this.
Fig. 1 is the structural representation of syndeton in the utility model; As shown in Figure 1, the utility model has been recorded a kind of syndeton of building structure seam, comprise the first bridge 11, the second bridge 12, band 2 and inserts 3, wherein, the first bridge 11 and the second bridge 12 are single seam steel work, and be all arranged on the sidewall 5 of building, be specially on two sidewalls 5 that the first bridge 11 and the second bridge 12 be separately positioned on building structure seam, play fixing effect with this.
Preferably, the first above-mentioned bridge 11 and the second bridge 12 are located in the same horizontal plane.
Further, band 2 is arranged between the first bridge 11 and the second bridge 12, realizes the effect of backing with this; And the material of the band 2 of stating is ethylene propylene diene rubber; Ethylene propylene diene rubber (EPDM) is wherein the terpolymer of ethene, propylene and non-conjugated diene hydrocarbon, and 1963 start to commercially produce.Annual global consumption figure is 800,000 tons.The topmost characteristic of ethylene propylene diene rubber is exactly its superior resistance to oxidation, anti-ozone and erosion-resistant ability.Meanwhile, because ethylene propylene diene rubber belongs to polyolefin family, it has fabulous vulcanization characteristics.In the middle of all rubber, ethylene propylene diene rubber has minimum proportion.It can absorb a large amount of fillers and oil and influencing characterisitic is little.Therefore can the cheap rubber compound of cost of manufacture.
Meanwhile, inserts 3 is arranged on the top of band 2, and the material of inserts 3 is polyurethanes; Polyurethane full name is wherein polyurethanes, is the general designation that contains the macromolecular compound of repetition carbamate groups on main chain.Polyurethane is to be formed by organic diisocyanate or polyisocyanates and dihydroxy or polyol addition polymerization.Polyurethane material, purposes is very wide, can replace rubber, plastics, nylon etc., for airport, hotel, building materials, automobile factory, colliery factory, cement plant, condo, villa, landscaping, colored stone art, park etc.
In practice of construction, first, reserved good steel built-in fitting (not marking in the drawings) on the sidewall 5 of both sides building in advance, if the words of steel work are without reserved; The first bridge 11 and the second bridge 12 are welded with steel built-in fitting respectively.
Then, imbed EPT rubber packing band 2, the length of band 2 is with the length of building, and width is wide with seam.Deng having constructed after building coats 4, finally insert polyurethane kind joint sealing material 3, complete whole work progress.
Finally, needed to check polyurethane kind joint sealing material 3 situations every 5 years, find aging and come off, should repair in time and keep in repair, thus the more effective generation of avoiding occurring the situation of leaking.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (5)

1. the syndeton of a building structure seam, it is characterized in that, described syndeton comprises the first bridge, the second bridge, band and inserts, described the first bridge and the second bridge are all arranged on the sidewall of building, described band is arranged between the first bridge and the second bridge, and described inserts is arranged at the top of band.
2. the syndeton of a kind of building structure seam as claimed in claim 1, is characterized in that, described bridge is single seam steel work.
3. the syndeton of a kind of building structure seam as claimed in claim 1, is characterized in that, described band is EPT rubber packing band.
4. the syndeton of a kind of building structure seam as claimed in claim 1, is characterized in that, described inserts is polyurethanes joint sealing material.
5. the syndeton of a kind of building structure seam as claimed in claim 1, is characterized in that, described the first bridge and the second bridge are located in the same horizontal plane.
CN201420249960.7U 2014-05-16 2014-05-16 Connecting structure of building structure joint Expired - Fee Related CN203878787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420249960.7U CN203878787U (en) 2014-05-16 2014-05-16 Connecting structure of building structure joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420249960.7U CN203878787U (en) 2014-05-16 2014-05-16 Connecting structure of building structure joint

Publications (1)

Publication Number Publication Date
CN203878787U true CN203878787U (en) 2014-10-15

Family

ID=51679304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420249960.7U Expired - Fee Related CN203878787U (en) 2014-05-16 2014-05-16 Connecting structure of building structure joint

Country Status (1)

Country Link
CN (1) CN203878787U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421597A (en) * 2015-12-23 2016-03-23 常熟市联动工程材料有限公司 High-performance house expansion joint
CN105689110A (en) * 2016-03-03 2016-06-22 中国恩菲工程技术有限公司 Multilayer stereo shaking table arrangement device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421597A (en) * 2015-12-23 2016-03-23 常熟市联动工程材料有限公司 High-performance house expansion joint
CN105689110A (en) * 2016-03-03 2016-06-22 中国恩菲工程技术有限公司 Multilayer stereo shaking table arrangement device

Similar Documents

Publication Publication Date Title
CN202577759U (en) Steel-concrete combined energy-consuming connecting beam
CN204662669U (en) A kind of inflation film building sealed bottom anchor device
CN203878787U (en) Connecting structure of building structure joint
CN203755495U (en) Mounting construction structure at prefabricated wall plate horizontal seam connecting portion
CN206396627U (en) A kind of stowing formula expanded joint structure
CN102849186A (en) Overwater floating island
CN104018644A (en) Light floor capable of moving and being recycled
CN107524174A (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN204198302U (en) A kind of tower crane base water-tight device
CN102155006B (en) Steel structure open web combined dam
CN203938961U (en) Outer tube constraint rubber concrete damping solid pier
CN104452578A (en) Seismic-resistant integral abutment bridge with energy absorption materials embedded in pier tops and construction method of seismic-resistant integral abutment bridge
CN102912720B (en) A kind of frame bridge attractive joint structure
CN106702891A (en) Concealed joint type telescopic joint structure
CN104563163A (en) Induced crack used for basement outer wall
CN103741592B (en) Outer tube constraint rubber concrete damping solid pier
KR101797749B1 (en) Roof of korean style house having against earthquake function and korean style house having roof of korean style house having against earthquake function
CN206143935U (en) Bathroom threshold waterproof construction
CN203960912U (en) A kind of ater-casting waterproof construction
CN206189968U (en) Prefabricated assembled underground granary of inside lining plastics echelonment
CN206035051U (en) Prefabricated caulking strips's in area circular underground granary of double -layer steel plate assembled
CN204982978U (en) Saline and alkaline land land used buries formula building piece
CN103288318B (en) Truncated-cone-shaped combined septic tank assembly
CN104060529A (en) Stainless steel U-shaped flanging body for expansion joint and using method of stainless steel U-shaped flanging body
CN207160083U (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20160516

CF01 Termination of patent right due to non-payment of annual fee