CN204662669U - A kind of inflation film building sealed bottom anchor device - Google Patents
A kind of inflation film building sealed bottom anchor device Download PDFInfo
- Publication number
- CN204662669U CN204662669U CN201520332208.3U CN201520332208U CN204662669U CN 204662669 U CN204662669 U CN 204662669U CN 201520332208 U CN201520332208 U CN 201520332208U CN 204662669 U CN204662669 U CN 204662669U
- Authority
- CN
- China
- Prior art keywords
- bolt
- angle steel
- crab
- sealing mat
- basis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a kind of inflation film building sealed bottom anchor device, and it is characterized in that described anchor bolt preburied in basis, described crab-bolt is embedded in base concrete inside when foundation construction according to design drawing; Described sealing mat is placed in the middle of air film body membrane material and basis, sealing mat uses PE foaming or rubber plastic foam material, and described sealing mat can Free Transform as required, splits into the width that size width is the same with angle steel flange width, basic end face is placed on, through cast-in fixing bolt before film material is installed; Aerated film body membrane material and sealing mat are anchored on basis by crab-bolt by described angle steel, and body membrane material is placed on above sealing mat through crab-bolt, press angle steel and use crab-bolt nut check compacting; Described aerated film main body anchoring uses burying rope aerated film body membrane material is stuck in angle steel outside, described in bury rope and avoid not being shifted during aerated film bearing load, effectively solving gun iron link anchor device can not the problem such as effective sealing junction and free drainage.
Description
Technical field
The utility model relates to pneumatic membrane building apparatus field, particularly relates to a kind of inflation film building sealed bottom anchor device.
Background technology
Air-supported membrane structure has the advantages such as cheap, quick construction, easily installation and removal, span are large, good in economic efficiency, is widely used in the large spaces such as sports ground, exhibition hall, warehouse, the physical culture of large span and communal facility.But the anticorrosive wood that existing aluminium groove anchoring uses easily rots and goes mouldy, and gun iron link anchor device exists can not the problem such as effective sealing junction and free drainage.
Utility model content
The purpose of this utility model overcomes above-mentioned defect, proposes a kind of inflation film building sealed bottom anchor device, be achieved through the following technical solutions.
A kind of inflation film building sealed bottom anchor device, it comprises air film main body, and angle steel buries rope, sealing mat, crab-bolt and basis, and described anchor bolt preburied in basis, described crab-bolt is embedded in base concrete inside when foundation construction according to design drawing; Described sealing mat is placed in the middle of air film body membrane material and basis, sealing mat uses PE expanded material or rubber plastic foam material, described sealing mat can Free Transform as required, split into the width that size width is the same with angle steel flange width, basic end face is placed on, through cast-in fixing bolt before film material is installed;
Aerated film body membrane material and sealing mat are anchored on basis by crab-bolt by described angle steel, and body membrane material is placed on above sealing mat through crab-bolt, press angle steel and use crab-bolt nut check compacting;
Described aerated film main body anchoring uses burying rope aerated film body membrane material is stuck in angle steel outside, described in bury rope and avoid not being shifted during aerated film bearing load.
Described angle steel material is Q235 or Q345 galvanizing angle steel.
Described crab-bolt material is Q235 or Q345 steel.
Angle steel top flange, described angle steel top flange has the hole for connecting wirerope.
The gradient on described basis is 5%.
Inflation film building sealed bottom anchor device of the present utility model, comprises air film main body, angle steel, buries rope, sealing mat, crab-bolt and basis, and effectively solving gun iron link anchor device can not the problem such as effective sealing junction and free drainage.
Accompanying drawing explanation
Figure 1 show inflation film building sealed bottom anchor device structural representation of the present utility model.
Detailed description of the invention
Below with reference to accompanying drawings illustrative embodiments of the present disclosure is described in more detail.Although show illustrative embodiments of the present disclosure in accompanying drawing, however should be appreciated that can realize the disclosure in a variety of manners and not should limit by the embodiment of setting forth here.On the contrary, provide these embodiments to be in order to more thoroughly the disclosure can be understood, and complete for the scope of the present disclosure can be conveyed to those skilled in the art.
As shown in Figure 1, the utility model proposes a kind of inflation film building sealed bottom anchor device, it comprises air film main body 1, angle steel 2, bury rope 3, sealing mat 4, crab-bolt 5, basis 6, described crab-bolt 5 is embedded in basis, and crab-bolt 5 is embedded in base concrete inside when foundation construction according to design drawing.
Described sealing mat 4 is placed in the middle of air film body membrane material and basis, sealing mat uses PE expanded material or rubber plastic foam material, described sealing mat can Free Transform as required, fill up basis uneven, split into the width that size width is the same with angle steel flange width, basic end face is placed on, through cast-in fixing bolt before film material is installed.
Aerated film body membrane material and sealing mat are anchored on basis by crab-bolt by described angle steel 2, and body membrane material is placed on above sealing mat through crab-bolt, and press angle steel and use crab-bolt nut check compacting, nut check torsion meets design requirement.
The anchoring of described aerated film main body needs use to bury rope aerated film body membrane material is stuck in angle steel outside, described in bury rope and avoid not being shifted during aerated film bearing load, improve the safety of inflation film building.
Further, described angle steel 2 material is Q235 or Q345 galvanizing angle steel.
Further, described crab-bolt 5 material is Q235 or Q345 steel.
Further, angle steel top flange perforate can connect the objects such as wirerope as required.
Further, need low inside and high outside during foundation construction, the gradient is about 5%, is beneficial to draining, improves the water proofing property of inflation film building.
The above; be only the utility model preferably detailed description of the invention; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the change that can expect easily or replacement, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should described be as the criterion with the protection domain of claim.
Claims (5)
1. an inflation film building sealed bottom anchor device, is characterized in that comprising air film main body, angle steel, bury rope, sealing mat, crab-bolt and basis, described anchor bolt preburied in basis, described crab-bolt is embedded in base concrete inside when foundation construction according to design drawing; Described sealing mat is placed in the middle of air film body membrane material and basis, sealing mat uses PE expanded material or rubber plastic foam material, described sealing mat can Free Transform as required, split into the width that size width is the same with angle steel flange width, basic end face is placed on, through cast-in fixing bolt before film material is installed;
Aerated film body membrane material and sealing mat are anchored on basis by crab-bolt by described angle steel, and body membrane material is placed on above sealing mat through crab-bolt, press angle steel and use crab-bolt nut check compacting;
Described aerated film main body anchoring uses burying rope aerated film body membrane material is stuck in angle steel outside, described in bury rope and avoid not being shifted during aerated film bearing load.
2. device according to claim 1, is characterized in that described angle steel material is Q235 or Q345 galvanizing angle steel.
3. device according to claim 2, is characterized in that described crab-bolt material is Q235 or Q345 steel.
4. device according to claim 3, is characterized in that described angle steel top flange has the hole for connecting wirerope.
5. device according to claim 4, is characterized in that the gradient on described basis is 5%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520332208.3U CN204662669U (en) | 2015-05-21 | 2015-05-21 | A kind of inflation film building sealed bottom anchor device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520332208.3U CN204662669U (en) | 2015-05-21 | 2015-05-21 | A kind of inflation film building sealed bottom anchor device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204662669U true CN204662669U (en) | 2015-09-23 |
Family
ID=54133064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520332208.3U Expired - Fee Related CN204662669U (en) | 2015-05-21 | 2015-05-21 | A kind of inflation film building sealed bottom anchor device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204662669U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507422A (en) * | 2016-01-14 | 2016-04-20 | 深圳市中德膜结构有限公司 | Air film building heat insulating structure and manufacture process thereof |
CN106223712A (en) * | 2016-09-23 | 2016-12-14 | 深圳市博德维环境技术股份有限公司 | Pneumatic membrane building base fixture and pneumatic membrane building |
CN106401275A (en) * | 2016-09-23 | 2017-02-15 | 深圳市博德维环境技术股份有限公司 | Bottom fixing device for air film building and air film building |
CN107538605A (en) * | 2017-10-11 | 2018-01-05 | 长沙远大住宅工业集团股份有限公司 | Roll-over table |
CN107663899A (en) * | 2016-07-27 | 2018-02-06 | 圆顶科技(上海)有限公司 | Membrane material and basic air-tightness fixing means |
WO2018054324A1 (en) * | 2016-09-23 | 2018-03-29 | 深圳市博德维环境技术股份有限公司 | Bottom sealing device of air film structure and air film structure |
CN113356678A (en) * | 2021-05-28 | 2021-09-07 | 轻空间(江苏)膜科技有限公司 | Membrane structure in air film |
-
2015
- 2015-05-21 CN CN201520332208.3U patent/CN204662669U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507422A (en) * | 2016-01-14 | 2016-04-20 | 深圳市中德膜结构有限公司 | Air film building heat insulating structure and manufacture process thereof |
CN105507422B (en) * | 2016-01-14 | 2018-12-07 | 深圳市中德膜结构有限公司 | Pneumatic membrane building insulation construction and its manufacture craft |
CN107663899A (en) * | 2016-07-27 | 2018-02-06 | 圆顶科技(上海)有限公司 | Membrane material and basic air-tightness fixing means |
CN106223712A (en) * | 2016-09-23 | 2016-12-14 | 深圳市博德维环境技术股份有限公司 | Pneumatic membrane building base fixture and pneumatic membrane building |
CN106401275A (en) * | 2016-09-23 | 2017-02-15 | 深圳市博德维环境技术股份有限公司 | Bottom fixing device for air film building and air film building |
WO2018054325A1 (en) * | 2016-09-23 | 2018-03-29 | 深圳市博德维环境技术股份有限公司 | Base securing device for air-supported structure, and air-supported structure |
WO2018054324A1 (en) * | 2016-09-23 | 2018-03-29 | 深圳市博德维环境技术股份有限公司 | Bottom sealing device of air film structure and air film structure |
CN106401275B (en) * | 2016-09-23 | 2018-09-14 | 深圳市博德维环境技术股份有限公司 | Pneumatic membrane building base fixture and pneumatic membrane building |
CN107538605A (en) * | 2017-10-11 | 2018-01-05 | 长沙远大住宅工业集团股份有限公司 | Roll-over table |
CN107538605B (en) * | 2017-10-11 | 2023-01-31 | 长沙远大住宅工业集团股份有限公司 | Overturning platform |
CN113356678A (en) * | 2021-05-28 | 2021-09-07 | 轻空间(江苏)膜科技有限公司 | Membrane structure in air film |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662669U (en) | A kind of inflation film building sealed bottom anchor device | |
CN102704491B (en) | Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin | |
AU2010257264B1 (en) | An Improved Prop for Mining, Construction and the Like | |
MX2012015136A (en) | Guy anchor reinforcement. | |
CN105297743A (en) | Diaphragm wall defect leakage water stop and drainage structure and construction method thereof | |
CN203809870U (en) | Supporting and fixing tool for level pump pipe on concrete floor | |
CN203891015U (en) | Oblique anchor simple hole-sealing grouting bag device | |
CN206768861U (en) | A kind of reinforcement ring retaining wall | |
CN200975031Y (en) | Multiple sealing deformation joint apparatus | |
CN104563163A (en) | Induced crack used for basement outer wall | |
CN203924303U (en) | The manhole of anti-freeze type | |
CN202108045U (en) | Sleeve pipe with anchor rod penetrating through underground continuous wall | |
KR20100006805U (en) | Holding plate for engineering and construction | |
KR101550495B1 (en) | waterproof method for interlayer of building concrete | |
CN205205831U (en) | Ground even wall defect seepage ends drainage structures | |
CN203855883U (en) | Laterally-fixed laminated rubber bearing | |
CN205296993U (en) | Special side direction anchor system of air film building | |
CN108018877A (en) | Prefabricated assembled piping lane assembly device and assembling method | |
CN203878787U (en) | Connecting structure of building structure joint | |
CN203946245U (en) | Sanitary unit base | |
CN201447712U (en) | Embedded-linked type waterproof coiled material | |
CN105129636A (en) | Large-basement baseboard tower-crane installation apparatus | |
CN204001874U (en) | The floating pumping plant of the box and pump integrated nothing of a kind of double containment | |
CN205421207U (en) | Assembled rectangle reinforced concrete groove of economizing on water | |
CN105544596A (en) | Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Yu Le Document name: payment instructions |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Yu Le Document name: Notice of termination of patent right |
|
DD01 | Delivery of document by public notice | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 |
|
CF01 | Termination of patent right due to non-payment of annual fee |