CN106401275B - Pneumatic membrane building base fixture and pneumatic membrane building - Google Patents
Pneumatic membrane building base fixture and pneumatic membrane building Download PDFInfo
- Publication number
- CN106401275B CN106401275B CN201610848945.8A CN201610848945A CN106401275B CN 106401275 B CN106401275 B CN 106401275B CN 201610848945 A CN201610848945 A CN 201610848945A CN 106401275 B CN106401275 B CN 106401275B
- Authority
- CN
- China
- Prior art keywords
- air film
- pneumatic membrane
- membrane building
- fixed part
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H15/00—Tents or canopies, in general
- E04H15/20—Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H15/00—Tents or canopies, in general
- E04H15/32—Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
- E04H15/64—Tent or canopy cover fastenings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H15/00—Tents or canopies, in general
- E04H15/20—Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
- E04H2015/209—Structures with a netting or similar for anchorage
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Tents Or Canopies (AREA)
Abstract
The present invention relates to a kind of pneumatic membrane building base fixtures, and for fixing air film, air film includes the gentle membrane body of air film fixed part, including:Matrix;Angle steel, includes into bottom plate and side plate that angle is arranged, and air film fixed part is folded between bottom plate and matrix;Check apron includes that the fixing body being fixedly connected is bonded with side plate, and by fixing body one end outwardly extending first ennation, and the second ennation for being extended downwardly and outwardly by the fixing body other end upwards, the first ennation is connected and fixed with air film ontology;First fixing device wears bottom plate, air film fixed part and matrix and is locked successively;Second fixing device wears fixing body and side plate and is locked successively.Above-mentioned pneumatic membrane building base fixture is simple in structure, can effectively block rainwater, prevents pneumatic membrane building bottom ponding, reduces damage of the ponding to air film and angle steel.The present invention also provides a kind of pneumatic membrane buildings including above-mentioned pneumatic membrane building base fixture.
Description
Technical field
The present invention relates to pneumatic membrane building fixed networks, more particularly to pneumatic membrane building base fixture and pneumatic membrane building.
Background technology
Since pneumatic membrane building has the features such as inexpensive, quick, easy to disassemble, light, thus more and more used
In all trades and professions.Pneumatic membrane building places oneself in the midst of outdoor, therefore the angle steel and film of pneumatic membrane building bottom fixed position in many cases
Between, it is easy to be influenced by outdoor changeable environment and easily form ponding, collect dust, sundries etc., be not easily cleaned, long-term accumulation
It is easily damaged the angle steel and membrane material of pneumatic membrane building bottom.
Invention content
Based on this, it is necessary to the problem of being easy ponding for pneumatic membrane building bottom, save bit by bit sundries and damage angle steel and membrane material,
There is provided it is a kind of can the dust-proof pneumatic membrane building base fixture kept off the rain and pneumatic membrane building.
A kind of pneumatic membrane building base fixture is mounted on matrix, the membrane material for fixing preprocessing, the membrane material packet
The gentle membrane body of air film fixed part is included, including:
Angle steel includes into bottom plate and side plate that angle is arranged, is placed on described matrix, and the air film fixed part is folded in
Between the bottom plate and described matrix;
Check apron includes being bonded the fixing body being fixedly connected with the side plate, by described fixing body one end upwards along described
The first ennation that air film ontology direction extends, and extended downwardly and outwardly by the fixing body other end and be covered in the bottom
The second ennation on plate, the air film fixed part and described matrix, end and the air film of first ennation
Ontology is connected and fixed;
First fixing device wears the bottom plate, the air film fixed part and described matrix and is locked in institute successively
It states on matrix;
Second fixing device wears the fixing body and the side plate and is locked on the side plate successively.
A bent downward is arranged in above-mentioned pneumatic membrane building base fixture on air film fixed part, angle steel and matrix
The check apron of extension, it is simple in structure, rainwater can be effectively blocked, dust-proof, sand prevention prevents product between pneumatic membrane building bottom angle steel and film
Water, dust accumulation, sand reduce ponding, and sand and dust prevent angle steel and the first, the second fixing device from getting rusty the damage of membrane material and angle steel.
The end of first ennation is welded on the air film ontology in one of the embodiments,.
The vertical range of the top of first ennation to the air film fixed part is in one of the embodiments,
250-350mm。
Further include pulley in one of the embodiments, and second fixing device includes connecting rod, the air film sheet
It is arranged with wirerope on body, is set in the connecting rod to the pulley rotation, the wirerope is looped around below the pulley,
The connecting rod wears the fixing body and the side plate respectively, and the fixing body is between the pulley and the side plate.
Further include catch in one of the embodiments, the catch is sleeved in the connecting rod, be located at the pulley it
Outside, the wirerope is between the fixing body and the catch.
Further include the gasket seal being set in connecting rod in one of the embodiments, the gasket seal is located at institute
It states between the fixing body of check apron and the pulley.
First fixing device is embedded in described matrix in one of the embodiments, and partial denudation is described
Bottom plate outside matrix for wearing the air film fixed part and the angle steel.
A kind of pneumatic membrane building includes the membrane material and matrix of preprocessing, which is characterized in that further includes one embodiment of any of the above
The pneumatic membrane building base fixture, the air film fixed part are fixed on described by the pneumatic membrane building base fixture
On matrix.
The wirerope is netted in one of the embodiments, is covered on outside the membrane material, the wirerope is connected to the angle
On the lateral body of steel.
Description of the drawings
Fig. 1 is the pneumatic membrane building base fixture structural schematic diagram that one embodiment of the invention provides;
Fig. 2 is the structural schematic diagram for the pneumatic membrane building bottom check apron that one embodiment of the invention provides;
Fig. 3 is the enlarged diagram of part-structure in Fig. 1 circles;
Fig. 4 is that wirerope is looped around the structural schematic diagram on the pulley of the second fixing device.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings to the present invention
Specific implementation mode be described in detail.Many details are elaborated in the following description in order to fully understand this hair
It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not
Similar improvement is done in the case of violating intension of the present invention, therefore the present invention is not limited to the specific embodiments disclosed below.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.
Unless otherwise defined, all of technologies and scientific terms used here by the article and belong to the technical field of the present invention
The normally understood meaning of technical staff is identical.Used term is intended merely to description tool in the description of the invention herein
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more phases
Any and all combinations of the Listed Items of pass.
Referring to Fig. 1, pneumatic membrane building base fixture provided by the invention is used to fix the membrane material 100 of preprocessing, with shape
At pneumatic membrane building, which includes matrix 200, the angle steel 300 and angle steel that are arranged on matrix 200
The check apron 400 of 300 connections, for fixing the first fixing device 500 of angle steel 300 and membrane material 100 on matrix 200, and
For fixing check apron 400 in the second fixing device 600 of 300 side of angle steel.
In one embodiment, the membrane material 100 of preprocessing includes 110 gentle membrane body 120 of air film fixed part.Referring also to 1 He
Fig. 3, angle steel 300 are placed on matrix 200, and angle steel 300 includes into the bottom plate 310 and side plate 320 of angle setting, air film fixed part
110 are folded between bottom plate 310 and matrix 200.Referring also to Fig. 2, check apron 400 include being bonded with the side plate of angle steel 300 320 admittedly
Surely the fixing body 410 connected, the first ennation 420 extended upwards along 120 direction of air film ontology by one end of fixing body 410
(in such as Fig. 1 and Fig. 3, the first ennation 420 is extended to by one end of fixing body 410 and is contacted with air film ontology 120 to the left upwards),
And it is extended downwardly and outwardly and is covered on bottom plate 310, air film fixed part 110 and matrix 200 by the other end of fixing body 410
The second ennation 430 (such as Fig. 1 and Fig. 3, the second ennation 430 are extended to form downwardly and to the right by the other end of fixing body 410),
The end of first ennation 420 is connected and fixed with air film ontology 120.It is solid that first fixing device 500 wears 310 air film of bottom plate successively
Determine portion 110 and matrix 200 and air film fixed part 100 is locked on matrix 200.Second fixing device 600 is worn successively
The side plate 320 of fixing body 410 and angle steel 300 and check apron 400 is locked.Using this structure, when meeting with rainwater weather, base
Rainwater on body 200, air film fixed part 110 and angle steel 300 can slide along check apron 400 to matrix 200, air film fixed part
110 and angle steel 300 except, can effectively block rainwater, prevent pneumatic membrane building bottom ponding, reduce ponding to air film fixed part 110
With the damage of angle steel 300, ensure that air film fixed part 110 has a longer life expectancy, the installation of pneumatic membrane building bottom has higher steady
It is qualitative.
In one embodiment, it is preferred that the end of the first ennation 420 is connected to air film ontology 120 by welding
On.
Referring to Fig. 1 and Fig. 2, in an embodiment, the vertical range on the top of the first ennation 420 to air film fixed part 110
For 250-350mm.Preferably, the best vertical range of the top of the first ennation 420 to air film fixed part 110 is 300mm.
Referring also to Fig. 2-Fig. 4 in one embodiment, is distributed with wirerope 700, the pneumatic membrane building bottom on air film ontology 120
Portion's fixing device further includes pulley 800, and the second fixing device 600 is equipped with a connecting rod 620, and pulley 800 is rotationally set in
In connecting rod 620, wirerope 700 is looped around 800 lower section of pulley, and connecting rod 620 wears fixing body 410 and the angle of check apron 400 respectively
The side plate 320 of steel 300, and fixing body 410 is between pulley 800 and side plate 320.Preferably, which fixes
Device further includes being sleeved in connecting rod 620, and the catch 610 except pulley 800, wirerope 700 are located at fixing body 410 and gear
Between piece 610.
Preferably, in an embodiment, which further includes the sealing being set in connecting rod 620
Gasket 900, gasket seal 900 are located between the fixing body 410 and pulley 800 of check apron 400.The setting energy of the gasket seal 900
Enough ensure that rainwater will not ensure air film fixed part by the gap penetration of connecting rod 620 between side plate 320 and fixing body 410
110 and angle steel 300 be in dry environment.Preferably, which is made of rubber and plastic cotton material.
Referring to Fig. 1 and Fig. 3, in an embodiment, the first fixing device 500 is embedded in matrix 200, and partial denudation is in base
Outside body 200, the bottom plate 310 for wearing air film fixed part 110 and angle steel 200, to fix air film fixed part 110 and angle steel 300.
Specifically, matrix 200 encloses, as multiple fixed air film fixed parts in pneumatic membrane building bottom around pneumatic membrane building one
Basis, for entire pneumatic membrane building, every pre-buried first fixing device 500 of a distance on matrix 200, for fixing
Air film fixed part 110.
The present invention also provides a kind of pneumatic membrane buildings, including the membrane material 100 of preprocessing and matrix 200 and any of the above one
Pneumatic membrane building base fixture described in embodiment, air film fixed part 110 are fixed on base by pneumatic membrane building base fixture
On body 200.Preferably, in an embodiment, which further includes wirerope 700, and wirerope 700 is netted, covers on membrane material 100
Outside, wirerope 700 is looped around the lower section of pulley 800.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of pneumatic membrane building base fixture, is mounted on matrix, the membrane material for fixing preprocessing, the membrane material includes
The gentle membrane body of air film fixed part, which is characterized in that including:
Angle steel includes into bottom plate and side plate that angle is arranged, is placed on described matrix, and the air film fixed part is folded in described
Between bottom plate and described matrix;
Check apron includes being bonded the fixing body being fixedly connected with the side plate, by described fixing body one end upwards along the air film
The first ennation that ontology direction extends, and extended downwardly and outwardly by the fixing body other end and be covered in the bottom plate, institute
The second ennation on air film fixed part and described matrix is stated, the end of first ennation connects with the air film ontology
Connect fixation;
First fixing device wears the bottom plate, the air film fixed part and described matrix and is locked in the base successively
On body;
Second fixing device wears the fixing body and the side plate and is locked on the side plate successively;The installation
Body be located at the side plate away from the side of the air film ontology, the end of first ennation is welded on the air film ontology
On.
2. pneumatic membrane building base fixture according to claim 1, which is characterized in that the top of first ennation
Vertical range to the air film fixed part is 250-350mm.
3. pneumatic membrane building base fixture according to claim 1, which is characterized in that further include pulley, and described
Two fixing devices include connecting rod, and wirerope is arranged on the air film ontology, is set in the connection to the pulley rotation
On bar, the wirerope is looped around below the pulley, and the connecting rod wears the fixing body and the side plate, the peace respectively
Body is filled between the pulley and the side plate.
4. pneumatic membrane building base fixture according to claim 3, which is characterized in that further include catch, the catch
It is sleeved in the connecting rod, is located at except the pulley, the wirerope is between the fixing body and the catch.
5. pneumatic membrane building base fixture according to claim 3, which is characterized in that further include being set in connecting rod
Gasket seal, the gasket seal is located between the fixing body and the pulley of the check apron.
6. pneumatic membrane building base fixture according to claim 1, which is characterized in that first fixing device is pre-buried
In described matrix, and bottom plate of the partial denudation outside described matrix for wearing the air film fixed part and the angle steel.
7. a kind of pneumatic membrane building includes the membrane material and matrix of preprocessing, which is characterized in that further include as claim 1-6 is arbitrary
Pneumatic membrane building base fixture described in one, the air film fixed part are fixed on by the pneumatic membrane building base fixture
In described matrix.
8. pneumatic membrane building according to claim 7, which is characterized in that further include wirerope, the wirerope is netted, covers on institute
It states outside membrane material, the wirerope is connected on the lateral body of the angle steel.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610848945.8A CN106401275B (en) | 2016-09-23 | 2016-09-23 | Pneumatic membrane building base fixture and pneumatic membrane building |
PCT/CN2017/102764 WO2018054333A1 (en) | 2016-09-23 | 2017-09-21 | Pneumatic membrane building bottom fixing device and pneumatic membrane building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610848945.8A CN106401275B (en) | 2016-09-23 | 2016-09-23 | Pneumatic membrane building base fixture and pneumatic membrane building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106401275A CN106401275A (en) | 2017-02-15 |
CN106401275B true CN106401275B (en) | 2018-09-14 |
Family
ID=57996715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610848945.8A Active CN106401275B (en) | 2016-09-23 | 2016-09-23 | Pneumatic membrane building base fixture and pneumatic membrane building |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106401275B (en) |
WO (1) | WO2018054333A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401275B (en) * | 2016-09-23 | 2018-09-14 | 深圳市博德维环境技术股份有限公司 | Pneumatic membrane building base fixture and pneumatic membrane building |
CN110821271A (en) * | 2019-09-30 | 2020-02-21 | 青岛安装建设股份有限公司 | Construction method of air film building |
CN113605533B (en) * | 2021-08-10 | 2023-03-21 | 江苏科技大学 | Air film bottom boundary fixing device and fixing method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02183749A (en) * | 1989-01-11 | 1990-07-18 | Dynic Corp | Clean room having double air membrane structure |
CN202108118U (en) * | 2011-05-31 | 2012-01-11 | 深圳市博德维建筑技术有限公司 | Bottom edge sealing part of pneumatic membrane buildings |
CN203383412U (en) * | 2013-07-19 | 2014-01-08 | 江苏凯伦建材股份有限公司 | Steel-structured waterproof and airproof membrane for roof |
CN204662669U (en) * | 2015-05-21 | 2015-09-23 | 余乐 | A kind of inflation film building sealed bottom anchor device |
CN206190003U (en) * | 2016-09-23 | 2017-05-24 | 深圳市博德维环境技术股份有限公司 | Air film building bottom fixing device and air film building |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4902304A (en) * | 1986-05-07 | 1990-02-20 | Envirex Inc. | Separate low pressure gas storage system |
KR100901990B1 (en) * | 2009-02-10 | 2009-06-08 | 주식회사 동아스트 | Membrane structure which have roof membarane fixing structure |
CN202108048U (en) * | 2011-05-31 | 2012-01-11 | 深圳市博德维建筑技术有限公司 | Pulley type earth anchor used for tension cable pneumatic membrane building |
CN204662659U (en) * | 2015-05-21 | 2015-09-23 | 余乐 | A kind of suspension cable net for inflation film building |
CN204919582U (en) * | 2015-07-01 | 2015-12-30 | 北京中体善建建设工程有限公司 | Collar tie beam is assembled to portable steel sheet case of special prefabricated filling of air film building |
CN106401275B (en) * | 2016-09-23 | 2018-09-14 | 深圳市博德维环境技术股份有限公司 | Pneumatic membrane building base fixture and pneumatic membrane building |
-
2016
- 2016-09-23 CN CN201610848945.8A patent/CN106401275B/en active Active
-
2017
- 2017-09-21 WO PCT/CN2017/102764 patent/WO2018054333A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02183749A (en) * | 1989-01-11 | 1990-07-18 | Dynic Corp | Clean room having double air membrane structure |
CN202108118U (en) * | 2011-05-31 | 2012-01-11 | 深圳市博德维建筑技术有限公司 | Bottom edge sealing part of pneumatic membrane buildings |
CN203383412U (en) * | 2013-07-19 | 2014-01-08 | 江苏凯伦建材股份有限公司 | Steel-structured waterproof and airproof membrane for roof |
CN204662669U (en) * | 2015-05-21 | 2015-09-23 | 余乐 | A kind of inflation film building sealed bottom anchor device |
CN206190003U (en) * | 2016-09-23 | 2017-05-24 | 深圳市博德维环境技术股份有限公司 | Air film building bottom fixing device and air film building |
Also Published As
Publication number | Publication date |
---|---|
CN106401275A (en) | 2017-02-15 |
WO2018054333A1 (en) | 2018-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106401275B (en) | Pneumatic membrane building base fixture and pneumatic membrane building | |
CN106555506A (en) | Pneumatic membrane building base fixture and pneumatic membrane building | |
ATE249544T1 (en) | DAMAGE DETECTION ON THE ROPE COAT OF A PLASTIC FIBER ROPE | |
EA200701494A1 (en) | DEVICE FOR USE WHEN BUILDING BUILDINGS | |
CN106437285B (en) | Pneumatic membrane building bottom sealing device and pneumatic membrane building | |
DE602005018893D1 (en) | System for collecting dust and vacuum cleaner with the same | |
JP6361008B2 (en) | Rail member and traveling member | |
US20160061483A1 (en) | Air conditioner cover | |
SE0602344L (en) | Cleaning cloth with both drying and scrubbing function | |
RU2006135382A (en) | COMPACT TROLLEY | |
RU163638U1 (en) | CAPE FOR TENT | |
DE202005000588U1 (en) | Sun protection system with emergency lifting device | |
CN108222070A (en) | Inspection shaft Special falling safety supporting device | |
MA49282A (en) | WINDOWS INCLUDING AT LEAST ONE PROFILE CORD FOR THE CONNECTION BETWEEN TWO WINDOWS AND WINDOW FOR SUCH WINDOWS | |
CN206190003U (en) | Air film building bottom fixing device and air film building | |
KR101427687B1 (en) | Board poster for public relations election | |
CN204571473U (en) | A kind of Simple moisture-proof traveling tent | |
CN206368607U (en) | Pneumatic membrane building base fixture and pneumatic membrane building | |
KR200469482Y1 (en) | Safety net structure for building structure | |
CN103253601B (en) | Crane | |
CN106223712B (en) | Pneumatic membrane building base fixture and pneumatic membrane building | |
CN206880641U (en) | It is bonded the environmental protection dustpan on ground | |
CN202524047U (en) | Cable hanging and laying device | |
KR100997737B1 (en) | Washable Antistatic Sticky Mat | |
ATE367730T1 (en) | STORAGE ARRANGEMENT |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 518000 b1-603, building B, Kexing Science Park, 15 Keyuan Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd. Address before: 518000 Guangdong science and Technology Park, Shenzhen, Nanshan District, science and Technology Park, 15 Kexing Science Park, 2 B unit 12, 3 Patentee before: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |