CN106401275A - Bottom fixing device for air film building and air film building - Google Patents

Bottom fixing device for air film building and air film building Download PDF

Info

Publication number
CN106401275A
CN106401275A CN201610848945.8A CN201610848945A CN106401275A CN 106401275 A CN106401275 A CN 106401275A CN 201610848945 A CN201610848945 A CN 201610848945A CN 106401275 A CN106401275 A CN 106401275A
Authority
CN
China
Prior art keywords
air film
matrix
pneumatic membrane
membrane building
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610848945.8A
Other languages
Chinese (zh)
Other versions
CN106401275B (en
Inventor
薛飞龙
张辉
王秦
肖龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Braodwell Environment Protection Technology Co Ltd
Original Assignee
Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Braodwell Environment Protection Technology Co Ltd filed Critical Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority to CN201610848945.8A priority Critical patent/CN106401275B/en
Publication of CN106401275A publication Critical patent/CN106401275A/en
Priority to PCT/CN2017/102764 priority patent/WO2018054333A1/en
Application granted granted Critical
Publication of CN106401275B publication Critical patent/CN106401275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/64Tent or canopy cover fastenings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
    • E04H2015/209Structures with a netting or similar for anchorage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Tents Or Canopies (AREA)

Abstract

The invention relates to a bottom fixing device for an air film building. The bottom fixing device is used for fixing an air film which comprises an air film fixing part and an air film body. The bottom fixing device comprises a base body, angle steel, a check curtain, a first fixing device and a second fixing device, wherein the angle steel comprises a bottom plate and a side plate, an included angle is formed between the bottom plate and the side plate, and the air film fixing part is arranged between the bottom plate and the base body in a clamped mode; the check curtain comprises a mounting body which is fixedly connected with the side plate in an attached mode, a first extension body which extends upwards and outwards from one end of the mounting body, and a second extension body which extends downwards and outwards from the other end of the mounting body; the first fixing device sequentially penetrates through the bottom plate, the air film fixing part and the base body and fixes the bottom plate, the air film fixing part and the base body in a locking mode; and the second fixing device sequentially penetrates through the mounting body and the side plate and fixes the mounting body and the side plate in a locking mode. The invention further provides the air film building comprising the bottom fixing device for the air film building.

Description

Pneumatic membrane building base fixture and pneumatic membrane building
Technical field
The present invention relates to pneumatic membrane building fixed network, more particularly to pneumatic membrane building base fixture and pneumatic membrane building.
Background technology
Due to pneumatic membrane building possess low cost, quick, be easy to dismounting, light the features such as, thus more and more used In all trades and professions.Pneumatic membrane building all places oneself in the midst of outdoor, the therefore angle steel of pneumatic membrane building bottom fixed position and film in many cases Between, easily it is subject to outdoor changeable environmental effect easily to form hydrops, collect dust, debris etc., be not easily cleaned, long term accumulation It is easily damaged angle steel and the membrane material of pneumatic membrane building bottom.
Content of the invention
Based on this it is necessary to for the easy hydrops in pneumatic membrane building bottom, the problem saving bit by bit debris and damage angle steel and membrane material, A kind of dust-proof pneumatic membrane building base fixture kept off the rain of energy and pneumatic membrane building are provided.
A kind of pneumatic membrane building base fixture, is arranged on matrix, for fixing the membrane material of preprocessing, described membrane material bag Include the gentle membrane body of air film fixed part, including:
Angle steel, including the base plate becoming angle setting and side plate, is placed on described matrix, described air film fixed part is folded in Between described base plate and described matrix;
Check apron, including the fixing body being fixedly connected of fitting with described side plate, by described fixing body one end up along described The first ennation that air film body direction extends, and covering is extended downwardly and outwardly at described bottom by the described fixing body other end The second ennation on plate, described air film fixed part and described matrix, the end of described first ennation and described air film Body is connected;
First fixing device, wears described base plate, described air film fixed part and described matrix successively and is locked in institute State on matrix;
Second fixing device, wears described fixing body and described side plate successively and is locked on described side plate.
Above-mentioned pneumatic membrane building base fixture arranges a bent downward on air film fixed part, angle steel and matrix The check apron extending, structure is simple, effectively can block rainwater, dust-proof, sand prevention, prevents long-pending between pneumatic membrane building bottom angle steel and film Water, laying dust, sand, reduces hydrops, sand and dust prevent angle steel and the first, the second fixing device from getting rusty to the damage of membrane material and angle steel.
Wherein in an embodiment, the end of described first ennation is welded on described air film body.
Wherein in an embodiment, the vertical dimension of the top extremely described air film fixed part of described first ennation is 250-350mm.
Wherein in an embodiment, also include pulley, and described second fixing device includes connecting rod, described air film is originally It is arranged with wirerope on body, is set in described connecting rod described pulley rotation, described wirerope is looped around below described pulley, Described connecting rod wears described fixing body and described side plate respectively, and described fixing body is located between described pulley and described side plate.
Wherein in an embodiment, also include catch, described catch is enclosed within described connecting rod, positioned at described pulley it Outward, described wirerope is located between described fixing body and described catch.
Wherein in an embodiment, also include the gasket seal being set in connecting rod, described gasket seal is located at institute State between the fixing body of check apron and described pulley.
Wherein in an embodiment, described first fixing device is embedded in described matrix, and partial denudation is described It is used for outside matrix wearing the base plate of described air film fixed part and described angle steel.
A kind of pneumatic membrane building, the membrane material including preprocessing and matrix are it is characterised in that also include any of the above one embodiment Described pneumatic membrane building base fixture, described air film fixed part is fixed on described by described pneumatic membrane building base fixture On matrix.
Wherein in an embodiment, described wirerope is netted, covers on outside described membrane material, described wirerope is connected to described angle On the lateral body of steel.
Brief description
The pneumatic membrane building base fixture structural representation that Fig. 1 provides for one embodiment of the invention;
The structural representation of the pneumatic membrane building bottom check apron that Fig. 2 provides for one embodiment of the invention;
Fig. 3 is the enlarged diagram of part-structure in Fig. 1 circle;
Fig. 4 is looped around the structural representation on the pulley of the second fixing device for wirerope.
Specific embodiment
Understandable for enabling the above objects, features and advantages of the present invention to become apparent from, below in conjunction with the accompanying drawings to the present invention Specific embodiment be described in detail.Elaborate a lot of details in order to fully understand this in the following description Bright.But the present invention can be much to implement different from alternate manner described here, and those skilled in the art can be not Similar improvement is done, therefore the present invention is not embodied as being limited by following public in the case of running counter to intension of the present invention.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or may be simultaneously present centering elements.
Unless otherwise defined, all of technology used herein and scientific terminology and the technical field belonging to the present invention The implication that technical staff is generally understood that is identical.The term being used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body is it is not intended that in limiting the present invention.Term as used herein " and/or " include one or more phases The arbitrary and all of combination of the Listed Items closing.
Referring to Fig. 1, the pneumatic membrane building base fixture that the present invention provides is used for fixing the membrane material 100 of preprocessing, with shape Become pneumatic membrane building, this pneumatic membrane building base fixture includes matrix 200, the angle steel 300 being arranged on matrix 200 and angle steel The check aprons 400 of 300 connections, for fixing angle steel 300 and membrane material 100 the first fixing device 500 on matrix 200, and For fixing check apron 400 in the second fixing device 600 of angle steel 300 side.
In one embodiment, the membrane material 100 of preprocessing includes the gentle membrane body 120 of air film fixed part 110.Referring also to 1 He Fig. 3, angle steel 300 is placed on matrix 200, and angle steel 300 includes into base plate 310 and the side plate 320 of angle setting, air film fixed part 110 are folded between base plate 310 and matrix 200.Referring also to Fig. 2, check apron 400 includes fitting with the side plate 320 of angle steel 300 admittedly The fixed fixing body 410 connecting, the first ennation 420 being extended up along air film body 120 direction by one end of fixing body 410 (in Fig. 1 and Fig. 3, the first ennation 420 is extended to the left upwards by one end of fixing body 410 and is contacted with air film body 120), And covering is extended downwardly and outwardly on base plate 310, air film fixed part 110 and matrix 200 by the other end of fixing body 410 The second ennation 430 (such as Fig. 1 and Fig. 3, the second ennation 430 is extended downwardly and to the right by the other end of fixing body 410 and formed), The end of the first ennation 420 and air film body 120 are connected.It is solid that first fixing device 500 wears base plate 310 air film successively Determine portion 110 and matrix 200 and air film fixed part 100 is locked on matrix 200.Second fixing device 600 wears successively The side plate 320 of fixing body 410 and angle steel 300 and check apron 400 is locked.Using this structure, when meeting with rainwater weather, base Rainwater on body 200, air film fixed part 110 and angle steel 300 all can be along check apron 400 landing to matrix 200, air film fixed part 110 and angle steel 300 outside, effectively can block rainwater, prevent pneumatic membrane building bottom hydrops, reduce hydrops to air film fixed part 110 Damage with angle steel 300 it is ensured that air film fixed part 110 has the longer life-span, pneumatic membrane building bottom install have higher steady Qualitative.
In the one embodiment it is preferred that end of the first ennation 420 is connected to air film body 120 by way of welding On.
Referring to Fig. 1 and Fig. 2, in an embodiment, the vertical dimension on the top of the first ennation 420 to air film fixed part 110 For 250-350mm.Preferably, the top of the first ennation 420 is 300mm to the optimal vertical dimension of air film fixed part 110.
Referring also to Fig. 2-Fig. 4, in an embodiment, air film body 120 is distributed with wirerope 700, this pneumatic membrane building bottom Portion's fixing device also includes pulley 800, and the second fixing device 600 is provided with a connecting rod 620, and pulley 800 is rotationally set in In connecting rod 620, wirerope 700 is looped around below pulley 800, and connecting rod 620 wears fixing body 410 and the angle of check apron 400 respectively The side plate 320 of steel 300, and fixing body 410 is positioned between pulley 800 and side plate 320.Preferably, this pneumatic membrane building bottom is fixed Device also includes being enclosed within connecting rod 620, and is located at the catch 610 outside pulley 800, and wirerope 700 is located at fixing body 410 and gear Between piece 610.
Preferably, in an embodiment, this pneumatic membrane building base fixture also includes the sealing being set in connecting rod 620 Pad 900, gasket seal 900 is located between fixing body 410 and the pulley 800 of check apron 400.The setting energy of this gasket seal 900 Enough ensure rainwater will not by the gap penetration of connecting rod 620 between side plate 320 and fixing body 410 it is ensured that air film fixed part 110 and angle steel 300 be in dry environment.Preferably, this gasket seal 900 is made using rubber and plastic cotton material.
Referring to Fig. 1 and Fig. 3, in an embodiment, the first fixing device 500 is embedded in matrix 200, and partial denudation is in base Outside body 200, for wearing the base plate 310 of air film fixed part 110 and angle steel 200, to fix air film fixed part 110 and angle steel 300.
Specifically, matrix 200, in pneumatic membrane building bottom, encloses around pneumatic membrane building one, as multiple fixing air film fixed parts Basis, for whole pneumatic membrane building, every pre-buried first fixing device 500 of a segment distance on matrix 200, for fixing Air film fixed part 110.
The present invention also provides a kind of pneumatic membrane building, the membrane material 100 including preprocessing and matrix 200, and any of the above one Pneumatic membrane building base fixture described in embodiment, air film fixed part 110 is fixed on base by pneumatic membrane building base fixture On body 200.Preferably, in an embodiment, this pneumatic membrane building also includes wirerope 700, and wirerope 700 is netted, covers on membrane material 100 Outward, wirerope 700 is looped around the lower section of pulley 800.
Each technical characteristic of embodiment described above can arbitrarily be combined, for making description succinct, not to above-mentioned reality The all possible combination of each technical characteristic applied in example is all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all it is considered to be the scope of this specification record.
Embodiment described above only have expressed the several embodiments of the present invention, and its description is more concrete and detailed, but simultaneously Can not therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art Say, without departing from the inventive concept of the premise, some deformation can also be made and improve, these broadly fall into the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (9)

1. a kind of pneumatic membrane building base fixture, is arranged on matrix, and for fixing the membrane material of preprocessing, described membrane material includes The gentle membrane body of air film fixed part is it is characterised in that include:
Angle steel, including the base plate becoming angle setting and side plate, is placed on described matrix, described air film fixed part is folded in described Between base plate and described matrix;
Check apron, including the fixing body being fixedly connected of fitting with described side plate, by described fixing body one end up along described air film The first ennation that body direction extends, and covering is extended downwardly and outwardly in described base plate, institute by the described fixing body other end State the second ennation on air film fixed part and described matrix, the end of described first ennation is with described air film body even Connect fixation;
First fixing device, wears described base plate, described air film fixed part and described matrix successively and is locked in described base On body;
Second fixing device, wears described fixing body and described side plate successively and is locked on described side plate.
2. pneumatic membrane building base fixture according to claim 1 is it is characterised in that the end of described first ennation It is welded on described air film body.
3. pneumatic membrane building base fixture according to claim 1 is it is characterised in that the top of described first ennation Vertical dimension to described air film fixed part is 250-350mm.
4. pneumatic membrane building base fixture according to claim 1 is it is characterised in that also include pulley, and described Two fixing devices include connecting rod, and described air film body is arranged with wirerope, are set in described connection described pulley rotation On bar, described wirerope is looped around below described pulley, and described connecting rod wears described fixing body and described side plate, described peace respectively Dress body is located between described pulley and described side plate.
5. pneumatic membrane building base fixture according to claim 4 is it is characterised in that also include catch, described catch It is enclosed within described connecting rod, outside described pulley, described wirerope is located between described fixing body and described catch.
6. pneumatic membrane building base fixture according to claim 4 is it is characterised in that also include being set in connecting rod Gasket seal, described gasket seal is located between the fixing body of described check apron and described pulley.
7. pneumatic membrane building base fixture according to claim 1 is it is characterised in that described first fixing device is pre-buried In described matrix, and partial denudation is used for wearing the base plate of described air film fixed part and described angle steel outside described matrix.
8. a kind of pneumatic membrane building, the membrane material including preprocessing and matrix are it is characterised in that also include as any in claim 1-7 Pneumatic membrane building base fixture described in one, described air film fixed part is fixed on by described pneumatic membrane building base fixture In described matrix.
9. it is characterised in that also including wirerope, described wirerope is netted to pneumatic membrane building according to claim 8, covers on institute State outside membrane material, described wirerope is connected on the lateral body of described angle steel.
CN201610848945.8A 2016-09-23 2016-09-23 Pneumatic membrane building base fixture and pneumatic membrane building Active CN106401275B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610848945.8A CN106401275B (en) 2016-09-23 2016-09-23 Pneumatic membrane building base fixture and pneumatic membrane building
PCT/CN2017/102764 WO2018054333A1 (en) 2016-09-23 2017-09-21 Pneumatic membrane building bottom fixing device and pneumatic membrane building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610848945.8A CN106401275B (en) 2016-09-23 2016-09-23 Pneumatic membrane building base fixture and pneumatic membrane building

Publications (2)

Publication Number Publication Date
CN106401275A true CN106401275A (en) 2017-02-15
CN106401275B CN106401275B (en) 2018-09-14

Family

ID=57996715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610848945.8A Active CN106401275B (en) 2016-09-23 2016-09-23 Pneumatic membrane building base fixture and pneumatic membrane building

Country Status (2)

Country Link
CN (1) CN106401275B (en)
WO (1) WO2018054333A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018054333A1 (en) * 2016-09-23 2018-03-29 深圳市博德维环境技术股份有限公司 Pneumatic membrane building bottom fixing device and pneumatic membrane building
CN110821271A (en) * 2019-09-30 2020-02-21 青岛安装建设股份有限公司 Construction method of air film building
CN113605533A (en) * 2021-08-10 2021-11-05 江苏科技大学 Air film bottom boundary fixing device and fixing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02183749A (en) * 1989-01-11 1990-07-18 Dynic Corp Clean room having double air membrane structure
CN202108118U (en) * 2011-05-31 2012-01-11 深圳市博德维建筑技术有限公司 Bottom edge sealing part of pneumatic membrane buildings
CN203383412U (en) * 2013-07-19 2014-01-08 江苏凯伦建材股份有限公司 Steel-structured waterproof and airproof membrane for roof
CN204662669U (en) * 2015-05-21 2015-09-23 余乐 A kind of inflation film building sealed bottom anchor device
CN206190003U (en) * 2016-09-23 2017-05-24 深圳市博德维环境技术股份有限公司 Air film building bottom fixing device and air film building

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4902304A (en) * 1986-05-07 1990-02-20 Envirex Inc. Separate low pressure gas storage system
KR100901990B1 (en) * 2009-02-10 2009-06-08 주식회사 동아스트 Membrane structure which have roof membarane fixing structure
CN202108048U (en) * 2011-05-31 2012-01-11 深圳市博德维建筑技术有限公司 Pulley type earth anchor used for tension cable pneumatic membrane building
CN204662659U (en) * 2015-05-21 2015-09-23 余乐 A kind of suspension cable net for inflation film building
CN204919582U (en) * 2015-07-01 2015-12-30 北京中体善建建设工程有限公司 Collar tie beam is assembled to portable steel sheet case of special prefabricated filling of air film building
CN106401275B (en) * 2016-09-23 2018-09-14 深圳市博德维环境技术股份有限公司 Pneumatic membrane building base fixture and pneumatic membrane building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02183749A (en) * 1989-01-11 1990-07-18 Dynic Corp Clean room having double air membrane structure
CN202108118U (en) * 2011-05-31 2012-01-11 深圳市博德维建筑技术有限公司 Bottom edge sealing part of pneumatic membrane buildings
CN203383412U (en) * 2013-07-19 2014-01-08 江苏凯伦建材股份有限公司 Steel-structured waterproof and airproof membrane for roof
CN204662669U (en) * 2015-05-21 2015-09-23 余乐 A kind of inflation film building sealed bottom anchor device
CN206190003U (en) * 2016-09-23 2017-05-24 深圳市博德维环境技术股份有限公司 Air film building bottom fixing device and air film building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018054333A1 (en) * 2016-09-23 2018-03-29 深圳市博德维环境技术股份有限公司 Pneumatic membrane building bottom fixing device and pneumatic membrane building
CN110821271A (en) * 2019-09-30 2020-02-21 青岛安装建设股份有限公司 Construction method of air film building
CN113605533A (en) * 2021-08-10 2021-11-05 江苏科技大学 Air film bottom boundary fixing device and fixing method

Also Published As

Publication number Publication date
CN106401275B (en) 2018-09-14
WO2018054333A1 (en) 2018-03-29

Similar Documents

Publication Publication Date Title
CN106401275A (en) Bottom fixing device for air film building and air film building
CN106555506A (en) Pneumatic membrane building base fixture and pneumatic membrane building
CA2102831A1 (en) Shading device
US9068336B2 (en) Reinforced transparent drain seal
CN106437285A (en) Gas-film building bottom sealing device and gas-film building
KR101491280B1 (en) Water-proofing method of concrete structures
CN206190003U (en) Air film building bottom fixing device and air film building
CN108222070A (en) Inspection shaft Special falling safety supporting device
US20150104252A1 (en) Sleeve for highway safety cones
CN210766873U (en) Circular piping lane support
CN204081571U (en) A kind of mobile factory building with track dust-proof sealing structure
CN206368607U (en) Pneumatic membrane building base fixture and pneumatic membrane building
KR102400373B1 (en) Method of plastering and waterproof
CN208545665U (en) A kind of bridge expansion joint installation with groove structure
CN206880641U (en) It is bonded the environmental protection dustpan on ground
CN204252399U (en) The fastening devices of posttension soap-free emulsion polymeization, retarded adhesive prestressed steel bar sleeve pipe
CN203808538U (en) Distribution box protective shed for construction site
KR200492777Y1 (en) Opening-type safety fence
CN208072791U (en) A kind of tile attachment device and tile roofing
KR200344387Y1 (en) a construction safety railing balcone of new bulit
CN206205221U (en) Overlapping joint
KR101054876B1 (en) Drilling Equipment Butobisan Protection Net
CN206409020U (en) A kind of camping tent
JP2021075855A (en) Suspension scaffold impervious member and impervious structure
CN212107420U (en) PPR-PB integrated adapter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 518000 b1-603, building B, Kexing Science Park, 15 Keyuan Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.

Address before: 518000 Guangdong science and Technology Park, Shenzhen, Nanshan District, science and Technology Park, 15 Kexing Science Park, 2 B unit 12, 3

Patentee before: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.