CN206190003U - Air film building bottom fixing device and air film building - Google Patents

Air film building bottom fixing device and air film building Download PDF

Info

Publication number
CN206190003U
CN206190003U CN201621078732.3U CN201621078732U CN206190003U CN 206190003 U CN206190003 U CN 206190003U CN 201621078732 U CN201621078732 U CN 201621078732U CN 206190003 U CN206190003 U CN 206190003U
Authority
CN
China
Prior art keywords
air film
fixed part
pneumatic membrane
membrane building
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621078732.3U
Other languages
Chinese (zh)
Inventor
薛飞龙
张辉
王秦
肖龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Braodwell Environment Protection Technology Co Ltd
Original Assignee
Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Braodwell Environment Protection Technology Co Ltd filed Critical Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority to CN201621078732.3U priority Critical patent/CN206190003U/en
Application granted granted Critical
Publication of CN206190003U publication Critical patent/CN206190003U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to an air film building bottom fixing device for fixed air film, air film include air film fixed part and air film body, include: the base member, the angle steel includes into bottom plate and curb plate that the contained angle set up, and air film fixed part clamp is established between bottom plate and base member, the check apron includes and personally experiences sth. Part of the body with side plate attached fixed connection's installation, by installing the upwards first ennation of outside extension of body one end to and by installing the body other end outside second ennation that extends downwards, first ennation and this body coupling of air film are fixed, a fixing device wears to establish bottom plate, air film fixed part and base member in proper order and locks fixedly, the 2nd fixing device wears to establish the installation body and curb plate and locking in proper order and fixes. Above -mentioned air film building bottom fixing device structure is simple, can effectively block the rainwater, prevents air film building bottom ponding, reduces the damage of ponding to air film and angle steel. The utility model provides an air film building including above -mentioned air film building bottom fixing device.

Description

Pneumatic membrane building base fixture and pneumatic membrane building
Technical field
The utility model is related to pneumatic membrane building fixed network, and more particularly to pneumatic membrane building base fixture and air film is built Build.
Background technology
Due to pneumatic membrane building possess low cost, it is quick, be easy to dismounting, it is light the features such as, thus more and more used In all trades and professions.Pneumatic membrane building places oneself in the midst of outdoor in many cases, thus pneumatic membrane building bottom fixed position angle steel and film Between, easily it is subject to outdoor changeable ambient influnence and easily forms ponding, collect dust, debris etc., it is not easily cleaned, long term accumulation It is easily damaged the angle steel and membrane material of pneumatic membrane building bottom.
Utility model content
Based on this, it is necessary to for the easy ponding in pneumatic membrane building bottom, the problem saved bit by bit debris and damage angle steel and membrane material, A kind of dust-proof pneumatic membrane building base fixture kept off the rain of energy and pneumatic membrane building are provided.
A kind of pneumatic membrane building base fixture, on matrix, the membrane material for fixing preprocessing, the membrane material bag The gentle membrane body of air film fixed part is included, including:
Angle steel, including into the base plate and side plate that angle is set, be placed on described matrix, the air film fixed part is folded in Between the base plate and described matrix;
Check apron, including the fixing body being fixedly connected of being fitted with the side plate, by described fixing body one end upwards along described The first ennation that air film body direction extends, and extended downwardly and outwardly by the fixing body other end and be covered in the bottom The second ennation on plate, the air film fixed part and described matrix, end and the air film of first ennation Body is connected;
First fixing device, wears the base plate, the air film fixed part and described matrix and is locked in institute successively State on matrix;
Second fixing device, wears the fixing body and the side plate and is locked on the side plate successively.
Above-mentioned pneumatic membrane building base fixture sets a bent downward on air film fixed part, angle steel and matrix The check apron of extension, simple structure can effectively block rainwater, and dust-proof, sand prevention prevents product between pneumatic membrane building bottom angle steel and film Water, laying dust, sand reduces ponding, and damage of the sand and dust to membrane material and angle steel prevents angle steel and the first, the second fixing device from getting rusty.
Wherein in one embodiment, the end of first ennation is welded on the air film body.
Wherein in one embodiment, top to the vertical range of the air film fixed part of first ennation is 250-350mm。
Wherein in one embodiment, also including pulley, and second fixing device includes connecting rod, the air film sheet Wirerope is arranged with body, is set in the connecting rod pulley rotation, the wirerope is looped around the pulley lower section, The connecting rod wears the fixing body and the side plate respectively, and the fixing body is located between the pulley and the side plate.
Wherein in one embodiment, also including catch, the catch is enclosed within the connecting rod, positioned at the pulley it Outward, the wirerope is located between the fixing body and the catch.
Wherein in one embodiment, also including the gasket seal being set in connecting rod, the gasket seal is located at institute State between the fixing body of check apron and the pulley.
Wherein in one embodiment, first fixing device is embedded in described matrix, and partial denudation is described It is used to wear the base plate of the air film fixed part and the angle steel outside matrix.
A kind of pneumatic membrane building, including preprocessing membrane material and matrix, it is characterised in that also including the embodiment of any of the above one Described pneumatic membrane building base fixture, the air film fixed part is fixed on described by the pneumatic membrane building base fixture On matrix.
Wherein in one embodiment, the wirerope is netted, is covered on outside the membrane material, and the wirerope is connected to the angle On the lateral body of steel.
Brief description of the drawings
The pneumatic membrane building base fixture structural representation that Fig. 1 is provided for the embodiment of the utility model one;
The structural representation of the pneumatic membrane building bottom check apron that Fig. 2 is provided for the embodiment of the utility model one;
Fig. 3 is the enlarged diagram of part-structure in Fig. 1 circles;
Fig. 4 is looped around the structural representation on the pulley of the second fixing device for wirerope.
Specific embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings to this The specific embodiment of utility model is described in detail.Elaborate many details in order to abundant in the following description Understand the utility model.But the utility model can be implemented with being much different from other manner described here, this area Technical staff can do similar improvement in the case of without prejudice to the utility model intension, therefore the utility model does not receive following public affairs The limitation of the specific implementation opened.
It should be noted that when element is referred to as " being fixed on " another element, it can directly on another element Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or may be simultaneously present centering elements.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with technology of the present utility model is belonged to The implication that the technical staff in domain is generally understood that is identical.It is herein to be in term used in the description of the present utility model The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include The arbitrary and all of combination of one or more related Listed Items.
Referring to Fig. 1, the pneumatic membrane building base fixture that the utility model is provided is used to fix the membrane material 100 of preprocessing, To form pneumatic membrane building, the pneumatic membrane building base fixture include matrix 200, the angle steel 300 that is arranged on matrix 200 and Angle steel 300 connection check apron 400, for fixing the first fixing device 500 of angle steel 300 and membrane material 100 on matrix 200, And for fixing check apron 400 in the second fixing device 600 of the side of angle steel 300.
In one embodiment, the membrane material 100 of preprocessing includes the gentle membrane body 120 of air film fixed part 110.Referring also to 1 He Fig. 3, angle steel 300 is placed on matrix 200, and angle steel 300 includes into the base plate 310 and side plate 320 of angle setting, air film fixed part 110 are folded between base plate 310 and matrix 200.Referring also to Fig. 2, check apron 400 includes being fitted with the side plate 320 of angle steel 300 admittedly The fixing body 410 of fixed connection, the first ennation 420 extended along the direction of air film body 120 upwards by one end of fixing body 410 (such as in Fig. 1 and Fig. 3, the first ennation 420 is extended to and contacted with air film body 120 to the left upwards by one end of fixing body 410), And extended downwardly and outwardly by the other end of fixing body 410 and be covered on base plate 310, air film fixed part 110 and matrix 200 The second ennation 430 (such as Fig. 1 and Fig. 3, the second ennation 430 is extended and formed downwardly and to the right by the other end of fixing body 410), The end of the first ennation 420 is connected with air film body 120.First fixing device 500 wears the air film of base plate 310 and consolidates successively Determine portion 110 and matrix 200 and air film fixed part 100 is locked on matrix 200.Second fixing device 600 wears successively The side plate 320 of fixing body 410 and angle steel 300 and check apron 400 is locked.Using this structure, when rainwater weather is met with, base Rainwater on body 200, air film fixed part 110 and angle steel 300 can be slid to matrix 200, air film fixed part along check apron 400 110 and angle steel 300 outside, can effectively block rainwater, prevent pneumatic membrane building bottom ponding, reduce ponding to air film fixed part 110 With the damage of angle steel 300, it is ensured that air film fixed part 110 has the life-span more long, pneumatic membrane building bottom is installed with higher steady It is qualitative.
In one embodiment, it is preferred that the end of the first ennation 420 is connected to air film body 120 by way of welding On.
Referring to Fig. 1 and Fig. 2, in an embodiment, the vertical range on the top of the first ennation 420 to air film fixed part 110 It is 250-350mm.Preferably, the top of the first ennation 420 to the optimal vertical range of air film fixed part 110 is 300mm.
Referring also to Fig. 2-Fig. 4, in an embodiment, is distributed with wirerope 700 on air film body 120, the pneumatic membrane building bottom Portion's fixing device also includes pulley 800, and the second fixing device 600 is provided with a connecting rod 620, and pulley 800 is rotationally set in In connecting rod 620, wirerope 700 is looped around the lower section of pulley 800, and connecting rod 620 wears fixing body 410 and the angle of check apron 400 respectively The side plate 320 of steel 300, and fixing body 410 is positioned between pulley 800 and side plate 320.Preferably, the pneumatic membrane building bottom is fixed Device also includes being enclosed within connecting rod 620, and the catch 610 outside pulley 800, and wirerope 700 is located at fixing body 410 and gear Between piece 610.
Preferably, in an embodiment, the pneumatic membrane building base fixture also includes the sealing being set in connecting rod 620 Pad 900, gasket seal 900 is located between the fixing body 410 of check apron 400 and pulley 800.The setting energy of the gasket seal 900 Enough ensure that rainwater will not be by the gap penetration of connecting rod 620 between side plate 320 and fixing body 410, it is ensured that air film fixed part 110 and angle steel 300 be in dry environment.Preferably, the gasket seal 900 is made of rubber and plastic cotton material.
Referring to Fig. 1 and Fig. 3, in an embodiment, the first fixing device 500 is embedded in matrix 200, and partial denudation is in base Outside body 200, the base plate 310 for wearing air film fixed part 110 and angle steel 200, to fix air film fixed part 110 and angle steel 300.
Specifically, matrix 200 is enclosed in pneumatic membrane building bottom around pneumatic membrane building one, as the fixed air film fixed part of multiple Basis, for whole pneumatic membrane building, every pre-buried first fixing device 500 of a segment distance on matrix 200, for fixing Air film fixed part 110.
The utility model also provides a kind of pneumatic membrane building, including preprocessing membrane material 100 and matrix 200, and to take up an official post The pneumatic membrane building base fixture anticipated described in an embodiment, air film fixed part 110 is fixed by pneumatic membrane building base fixture On matrix 200.Preferably, in an embodiment, the pneumatic membrane building also includes wirerope 700, and wirerope 700 is netted, covers on membrane material Outside 100, wirerope 700 is looped around the lower section of pulley 800.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed, But therefore can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (9)

1. a kind of pneumatic membrane building base fixture, on matrix, the membrane material for fixing preprocessing, the membrane material includes The gentle membrane body of air film fixed part, it is characterised in that including:
Angle steel, including into the base plate and side plate that angle is set, be placed on described matrix, the air film fixed part is folded in described Between base plate and described matrix;
Check apron, including the fixing body being fixedly connected of being fitted with the side plate, by described fixing body one end upwards along the air film The first ennation that body direction extends, and extended downwardly and outwardly by the fixing body other end and be covered in the base plate, institute The second ennation on air film fixed part and described matrix is stated, the end of first ennation connects with the air film body Connect fixation;
First fixing device, wears the base plate, the air film fixed part and described matrix and is locked in the base successively On body;
Second fixing device, wears the fixing body and the side plate and is locked on the side plate successively.
2. pneumatic membrane building base fixture according to claim 1, it is characterised in that the end of first ennation It is welded on the air film body.
3. pneumatic membrane building base fixture according to claim 1, it is characterised in that the top of first ennation Vertical range to the air film fixed part is 250-350mm.
4. pneumatic membrane building base fixture according to claim 1, it is characterised in that also including pulley, and described Two fixing devices include connecting rod, and wirerope is arranged with the air film body, are set in the connection pulley rotation On bar, the wirerope is looped around the pulley lower section, and the connecting rod wears the fixing body and the side plate, the peace respectively Dress body is located between the pulley and the side plate.
5. pneumatic membrane building base fixture according to claim 4, it is characterised in that also including catch, the catch It is enclosed within the connecting rod, outside the pulley, the wirerope is located between the fixing body and the catch.
6. pneumatic membrane building base fixture according to claim 4, it is characterised in that also including being set in connecting rod Gasket seal, the gasket seal be located at the check apron fixing body and the pulley between.
7. pneumatic membrane building base fixture according to claim 1, it is characterised in that first fixing device is pre-buried In described matrix, and partial denudation is used to wear the base plate of the air film fixed part and the angle steel outside described matrix.
8. the membrane material and matrix of a kind of pneumatic membrane building, including preprocessing, it is characterised in that also any including such as claim 1-7 Pneumatic membrane building base fixture described in one, the air film fixed part is fixed on by the pneumatic membrane building base fixture In described matrix.
9. pneumatic membrane building according to claim 8, it is characterised in that also including wirerope, the wirerope is netted, covers on institute State outside membrane material, the wirerope is connected on the lateral body of the angle steel.
CN201621078732.3U 2016-09-23 2016-09-23 Air film building bottom fixing device and air film building Active CN206190003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621078732.3U CN206190003U (en) 2016-09-23 2016-09-23 Air film building bottom fixing device and air film building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621078732.3U CN206190003U (en) 2016-09-23 2016-09-23 Air film building bottom fixing device and air film building

Publications (1)

Publication Number Publication Date
CN206190003U true CN206190003U (en) 2017-05-24

Family

ID=58730125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621078732.3U Active CN206190003U (en) 2016-09-23 2016-09-23 Air film building bottom fixing device and air film building

Country Status (1)

Country Link
CN (1) CN206190003U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401275A (en) * 2016-09-23 2017-02-15 深圳市博德维环境技术股份有限公司 Bottom fixing device for air film building and air film building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401275A (en) * 2016-09-23 2017-02-15 深圳市博德维环境技术股份有限公司 Bottom fixing device for air film building and air film building
WO2018054333A1 (en) * 2016-09-23 2018-03-29 深圳市博德维环境技术股份有限公司 Pneumatic membrane building bottom fixing device and pneumatic membrane building
CN106401275B (en) * 2016-09-23 2018-09-14 深圳市博德维环境技术股份有限公司 Pneumatic membrane building base fixture and pneumatic membrane building

Similar Documents

Publication Publication Date Title
US20180008492A1 (en) Protective Cover for Wheelchair User
CN106555506A (en) Pneumatic membrane building base fixture and pneumatic membrane building
CN206190003U (en) Air film building bottom fixing device and air film building
CN106401275B (en) Pneumatic membrane building base fixture and pneumatic membrane building
US9068336B2 (en) Reinforced transparent drain seal
CN108222070A (en) Inspection shaft Special falling safety supporting device
CN206368607U (en) Pneumatic membrane building base fixture and pneumatic membrane building
CN205722632U (en) A kind of for outdoor LED giant-screen
CN204571473U (en) A kind of Simple moisture-proof traveling tent
CN208830189U (en) A kind of municipal construction warning sign
US20110197480A1 (en) Wire frame for attaching a free swinging sign panel made from corrugated plastic, paper card stock or similar materials
US20100116446A1 (en) Windscreen assembly for attachment to fence
CN206880641U (en) It is bonded the environmental protection dustpan on ground
CN204560453U (en) One protects tree support
CN208545665U (en) A kind of bridge expansion joint installation with groove structure
CN207825657U (en) The sneakers upper of a shoe fabric of easy cleaning
CN207813478U (en) Extension ladder
CN205724426U (en) The simple distribution box support in a kind of job site
CN205502995U (en) Ladder is pruned in gardens with extending structure
CN205445372U (en) Utility tunnel discharging material silo theftproof is fleed and is covered door
CN205976075U (en) Outer containment system unit plate block connection structure of assembled
CN205803381U (en) A kind of Powerful hook load-bearing adhesive tape
CN210948408U (en) Flood control and disaster reduction wall
CN204987287U (en) Outer quick -witted sunshade of fixed air conditioner of turnbuckle
CN211571539U (en) Fallen leaf collecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 518000 b1-603, building B, Kexing Science Park, 15 Keyuan Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.

Address before: 518000 Guangdong science and Technology Park, Shenzhen, Nanshan District, science and Technology Park, 15 Kexing Science Park, 2 B unit 12, 3

Patentee before: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.

CP02 Change in the address of a patent holder