CN105129636A - Large-basement baseboard tower-crane installation apparatus - Google Patents

Large-basement baseboard tower-crane installation apparatus Download PDF

Info

Publication number
CN105129636A
CN105129636A CN201510382435.1A CN201510382435A CN105129636A CN 105129636 A CN105129636 A CN 105129636A CN 201510382435 A CN201510382435 A CN 201510382435A CN 105129636 A CN105129636 A CN 105129636A
Authority
CN
China
Prior art keywords
tower crane
tower
baseboard
crane
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510382435.1A
Other languages
Chinese (zh)
Inventor
谭国良
李延春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510382435.1A priority Critical patent/CN105129636A/en
Publication of CN105129636A publication Critical patent/CN105129636A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A provided large-basement baseboard tower-crane installation apparatus comprises a tower-crane tower body, a baseboard, an H-shaped steel pedestal and a tower-crane base; the H-shaped steel pedestal is arranged in the baseboard, and the tower-crane tower body is installed on the H-shaped steel pedestal; the bottom of the baseboard is provided with the tower-crane base, and a water-stopping steel plate is arranged between the tower-crane base and the baseboard; and the bottom of the tower-crane tower body and tops of the H-shaped steel baseboard and the tower-crane base are provided with tower-crane connection bolts. The apparatus combines the tower-crane base and the baseboard for construction, basement baseboard construction is not influenced, also the baseboard is molded at a time, the waterproof effect is good, late-stage especial processing is not needed, construction is convenient, economical and reasonable advantages are provided, and related standard requirements are satisfied. The apparatus is beneficial for construction, related construction cost is saved and construction period is shortened.

Description

A kind of the earth house bottom plate tower crane erecting device
Technical field
The present invention relates to a kind of tower crane erecting device, particularly one the earth house bottom plate tower crane erecting device.
Background technology
Present stage, when building some larger storehouses, ground, because comparison between projects is large, always there is big and small deficiency in maintenance aspect.Such as the infiltration of the earth storehouse, because construction location horizontal surface is lower, low water can ooze out, so need anti-sealing to ooze out.Once infiltration will affect the construction of whole engineering, and water not easily emptying.
In present stage civil engineering process, in ground base area, tower crane must be installed, under majority takes tower crane to be imbedded ground house bottom plate, and tower crane and base plate be separated, base plate place reserved opening, wait construction to complete and again tower crane is removed, teeming ground house bottom plate.This construction method causes subsequent construction process complicated, and waterproof effect is poor, the impact overall duration.And construction causes ground house bottom plate to there is certain infiltration hidden danger like this.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of the earth house bottom plate tower crane erecting device, effectively can solve the problem in background technology.
In order to solve the problems of the technologies described above, the invention provides following technical scheme:
The present invention is a kind of the earth house bottom plate tower crane erecting device, and comprise tower crane tower body, base plate, H profile steel base and tower crane, described H profile steel base is arranged on described base plate interior, and described tower crane tower body is arranged on H profile steel base; Be provided with tower crane bottom described base plate, between described tower crane and described base plate, be provided with steel plate for sealing water; The top of the bottom of described tower crane tower body, described H profile steel base and described tower crane is provided with tower crane tie bolt.
As a preferred technical solution of the present invention, bottom described tower crane tower body and between described H profile steel base, be provided with reinforcement steel plate, and described tower crane tie bolt is through described reinforcement steel plate.
As a preferred technical solution of the present invention, described tower crane top is provided with pre-embedded steel slab, and the top of described pre-embedded steel slab is fixedly connected with bottom described steel plate for sealing water.
As a preferred technical solution of the present invention, described tower crane tie bolt is the tower crane tie bolt of J-shaped.
As a preferred technical solution of the present invention, described pre-embedded steel slab is the pre-embedded steel slab of towering shape.
As a preferred technical solution of the present invention, bottom described tower crane, be provided with several pillars.
The beneficial effect that compared with prior art the present invention reaches is: the present invention adopts tower crane to construct with low plate and combines, and does not affect ground house bottom plate construction, base plate one-shot forming simultaneously, good water-proof effect, does not need the later stage to process especially, easy construction, and economical rationality, meet related specifications requirement.The present invention is conducive to construction, saves associated construction expense, and shortens the construction period.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for specification sheets, together with embodiments of the present invention for explaining the present invention, is not construed as limiting the invention.
In the accompanying drawings:
Fig. 1 is integral structure schematic diagram of the present invention;
Number in the figure: 1, tower crane tower body; 2, base plate; 3, steel plate is strengthened; 4, steel plate for sealing water; 5, H profile steel base; 6, tower crane; 7, tower crane tie bolt; 8, pre-embedded steel slab; 9, pillar.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
Embodiment: as shown in Figure 1, a kind of the earth of the present invention house bottom plate tower crane erecting device, comprise tower crane tower body 1, base plate 2, H profile steel base 5 and tower crane 6, it is inner that described H profile steel base 5 is arranged on described base plate 2, and described tower crane tower body 1 is arranged on H profile steel base 5; Be provided with tower crane 6 bottom described base plate 2, between described tower crane 6 and described base plate 2, be provided with steel plate for sealing water 4; The bottom of described tower crane tower body 1, described H profile steel base 5 are provided with tower crane tie bolt 7 with the top of described tower crane 6.
Be provided with bottom described tower crane tower body 1 and between described H profile steel base 5 and strengthen steel plate 3, and described tower crane tie bolt 7 is through described reinforcement steel plate 3.Reinforcement steel plate 3 is arranged on the bottom of tower crane tower body 1, prevent tower crane tower body 1 directly contact base plate 2, and the design strengthening steel plate 3 is easy to the dismounting in later stage.
Described tower crane 6 top is provided with pre-embedded steel slab 8, and the top of described pre-embedded steel slab 8 is fixedly connected with bottom described steel plate for sealing water 4.Reinforce the rigidity between steel plate for sealing water 4 and tower crane 4 by the pre-embedded steel slab 8 arranged, also further reduce the gap between steel plate for sealing water 4 and tower crane 6, thus reach the object preventing from seeping water.
Described tower crane tie bolt 7 is the tower crane tie bolt 7 of J-shaped.The tower crane tie bolt 7 of J-shaped can increase friction drag, and make entirety of the present invention more firm, tower crane tie bolt 7 can make H profile steel base plate more firmly be arranged in base plate 2, and described pre-embedded steel slab 8 is the pre-embedded steel slab 8 of towering shape.Pre-embedded steel slab 8 is arranged to the towering shape structure with limit pawl, actv. can be had to have improved resistance, and then make the stagnant water effect of steel plate for sealing water 4 better.Several pillars 9 are provided with bottom described tower crane 6.Several pillars 9 arranged in the bottom of tower crane 6, play and support effect of the present invention, effectively can prevent the problem of subsiding caused because the soil is porous in underground.
The present invention adopts multiple reinforcing mode to reinforce, and effectively raises steadiness of the present invention, and then improves stagnant water effect of the present invention, constructs under the earth Cush work can be made to be in the environment of non-permeable water.The present invention adopts tower crane to construct with low plate and combines, and do not affect ground house bottom plate construction, base plate one-shot forming simultaneously, good water-proof effect, does not need the later stage to process especially, easy construction, and economical rationality, meet related specifications requirement.The present invention is conducive to construction, saves associated construction expense, and shortens the construction period.After the earth Cush work terminates, the structure be arranged under base plate 2 must not need to remove.The building part of base plate more than 2 is only needed to remove.Avoid the secondary construction in the earth storehouse, it also avoid secondary simultaneously and to construct the negative effect brought.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment to invention has been detailed description, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. a earth house bottom plate tower crane erecting device, comprise tower crane tower body (1), base plate (2), H profile steel base (5) and tower crane (6), it is characterized in that, it is inner that described H profile steel base (5) is arranged on described base plate (2), and described tower crane tower body (1) is arranged on H profile steel base (5); Described base plate (2) bottom is provided with tower crane (6), is provided with steel plate for sealing water (4) between described tower crane (6) and described base plate (2); Bottom, the described H profile steel base (5) of described tower crane tower body (1) are provided with tower crane tie bolt (7) with the top of described tower crane (6).
2. a kind of the earth house bottom plate tower crane erecting device according to claim 1, it is characterized in that, be provided with between described tower crane tower body (1) bottom and described H profile steel base (5) and strengthen steel plate (3), and described tower crane tie bolt (7) is through described reinforcement steel plate (3).
3. a kind of the earth house bottom plate tower crane erecting device according to claim 1, it is characterized in that, described tower crane (6) top is provided with pre-embedded steel slab (8), and the top of described pre-embedded steel slab (8) is fixedly connected with described steel plate for sealing water (4) bottom.
4. a kind of the earth house bottom plate tower crane erecting device according to claim 2, is characterized in that, the tower crane tie bolt (7) that described tower crane tie bolt (7) is J-shaped.
5. a kind of the earth house bottom plate tower crane erecting device according to claim 3, is characterized in that, the pre-embedded steel slab (8) that described pre-embedded steel slab (8) is towering shape.
6. a kind of the earth house bottom plate tower crane erecting device according to claim 3, it is characterized in that, described tower crane (6) bottom is provided with several pillars (9).
CN201510382435.1A 2015-07-03 2015-07-03 Large-basement baseboard tower-crane installation apparatus Pending CN105129636A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510382435.1A CN105129636A (en) 2015-07-03 2015-07-03 Large-basement baseboard tower-crane installation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510382435.1A CN105129636A (en) 2015-07-03 2015-07-03 Large-basement baseboard tower-crane installation apparatus

Publications (1)

Publication Number Publication Date
CN105129636A true CN105129636A (en) 2015-12-09

Family

ID=54715301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510382435.1A Pending CN105129636A (en) 2015-07-03 2015-07-03 Large-basement baseboard tower-crane installation apparatus

Country Status (1)

Country Link
CN (1) CN105129636A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971023A (en) * 2016-06-08 2016-09-28 中国十七冶集团有限公司 Basement tower crane
CN108222054A (en) * 2018-01-05 2018-06-29 广州市芳村建筑工程有限公司 Tower-crane foundation structure and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201738330U (en) * 2010-08-19 2011-02-09 朱奎 Tower crane base construction
CN202322122U (en) * 2011-11-30 2012-07-11 中联重科股份有限公司 Tower crane and foundation transition device thereof
CN202577338U (en) * 2012-05-02 2012-12-05 中国建筑第八工程局有限公司 Tower crane pedestal and steel cushion cap connecting device
CN102912810A (en) * 2012-11-22 2013-02-06 北京城乡建设集团有限责任公司 Tower crane base structure in range of base bottom plate and construction method thereof
CN203007974U (en) * 2012-12-10 2013-06-19 中国建筑第八工程局有限公司 Tower crane foundation structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201738330U (en) * 2010-08-19 2011-02-09 朱奎 Tower crane base construction
CN202322122U (en) * 2011-11-30 2012-07-11 中联重科股份有限公司 Tower crane and foundation transition device thereof
CN202577338U (en) * 2012-05-02 2012-12-05 中国建筑第八工程局有限公司 Tower crane pedestal and steel cushion cap connecting device
CN102912810A (en) * 2012-11-22 2013-02-06 北京城乡建设集团有限责任公司 Tower crane base structure in range of base bottom plate and construction method thereof
CN203007974U (en) * 2012-12-10 2013-06-19 中国建筑第八工程局有限公司 Tower crane foundation structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971023A (en) * 2016-06-08 2016-09-28 中国十七冶集团有限公司 Basement tower crane
CN108222054A (en) * 2018-01-05 2018-06-29 广州市芳村建筑工程有限公司 Tower-crane foundation structure and its construction method
CN108222054B (en) * 2018-01-05 2019-11-15 广州市芳村建筑工程有限公司 Tower-crane foundation structure and its construction method

Similar Documents

Publication Publication Date Title
CN204662499U (en) Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN101235649A (en) Covered digging system for pit
CN201679147U (en) Underpinning structure for superstructure shear wall during underground top-down construction of high-rise building
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN105129636A (en) Large-basement baseboard tower-crane installation apparatus
CN104358318A (en) Building house adopting concrete steel structure uprights
CN204492335U (en) Construction repeats to use mobile sound barrier
CN201554034U (en) Horizontal embedding support structure for post-pouring belt of top-down construction
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN202466597U (en) Semi-inverse annular plate support system oversized subway deep foundation ditch construction structure
CN213358679U (en) Water buoyancy balance system of subway upper cover structure
CN204898696U (en) Telescopic steel cofferdam
CN211368981U (en) Open pool structure
CN204690961U (en) Building positioning support
CN203113360U (en) Deep foundation pit rigidity drainage platform device
CN203145122U (en) Drain pipe pre-embedding base
CN202577324U (en) Reinforced-concrete combined hanging box
CN207419508U (en) Direct burial body of rod basis
CN204491679U (en) A kind of ater-casting exterior wall plugging structure with elastic waterstop bar
CN204753625U (en) Existing ground of underground space iron winds pavilion underpins structure and nested structure
CN204418227U (en) A kind of ultra-large type manhole maintenance well well lid
CN203821427U (en) Reinforced concrete platform tower crane foundation with latticed columns
CN208578047U (en) A kind of novel subway foundation pit temporary support system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151209