CN203856124U - Hollow planting brick and vertical greening structure - Google Patents

Hollow planting brick and vertical greening structure Download PDF

Info

Publication number
CN203856124U
CN203856124U CN201420180363.3U CN201420180363U CN203856124U CN 203856124 U CN203856124 U CN 203856124U CN 201420180363 U CN201420180363 U CN 201420180363U CN 203856124 U CN203856124 U CN 203856124U
Authority
CN
China
Prior art keywords
brick
hollow
greening structure
vertical greening
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420180363.3U
Other languages
Chinese (zh)
Inventor
陈善湘
徐聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Tianquan ecological grass industrial engineering (IE) Co., Ltd
Original Assignee
HUNAN TIANQUAN TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN TIANQUAN TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HUNAN TIANQUAN TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201420180363.3U priority Critical patent/CN203856124U/en
Application granted granted Critical
Publication of CN203856124U publication Critical patent/CN203856124U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model provides a hollow planting brick and a vertical greening structure. The overall framework of the brick body is a quadrangular prism of which the upper, lower, left and right end faces are rectangular and the front and back end faces are parallelogram-shaped; the right end face of the brick body is a right flange which is not completely sealed with a nick; irrigation pipe holes are formed in the front end face and the rear end face of the brick body; a drain hole is formed in the lower end face of the brick body; an included angle between the lower end face and the left end face serves as a waste storage groove angle. The utility model also provides a vertical greening structure. The hollow planting brick is used for solving the problem that plants cannot be planted on a vertical slope surface or a steep slope surface, and can be widely applied to the fields such as urban wall greening, rock slope greening and retaining wall greening; the hollow planting brick has important practical and far-reaching significance for the ecological environment, green area increase, PM2.5 reduction and the like, and also has obvious economic effect and social benefit.

Description

A kind of hollow plantation brick and vertical greening structure
Technical field
The utility model relates to field of environment protection, particularly a kind of hollow plantation brick and vertical greening structure.
Background technology
Along with the development of urban construction, high building towers, and it was vegetation originally that concrete replaces, and made green area fewer and feweri, and dust increases, and city thermal conductance effect increases, and has a strong impact on people's life.Do not taking under the prerequisite in too many space, vertical greening is to increase green area, can reach the optimal path of beautifying the environment.
Vertical greening takes up an area few, takes full advantage of space, has greatly improved the green amount in city, coverage scale, has strengthened the stereoeffect of greening.By beautifying metope, the slight slope etc. of baldness, improve environmental quality.Because climing property Climbing Plant is along with object external form changes, thereby softens the stiff profile of building and combined together with afforestation of city, can create multiple lively decorative effect.Transpiration by plant leaf surface and give shade effect, can relax the direct projection of sunlight to building, and summer metope temperature is reduced greatly.Interrelated data shows, while being subject to sunlight with a western exposure, afforests the metope covering than low 13~15 degree of the temperature without covering wall.After winter fallen leaves, neither affect metope and obtain the radiant heat of the sun, its branch stem being attached on metope has become again one layer of heat preservation layer, has played the effect that regulates indoor air temperature.Vertical greening can also lower the reflection of metope to noise, and adsorbs to a certain extent flue dust.Advocate energetically vertical greening, do vertical greening well, to improving forest sight rate and afforestation coverage rate, comprehensive utilization urban space, afforests and beautifies environment, has immeasurable Social benefit and economic benefit.
City vertical greening is generally fixed on metope nutrient matrix, then on matrix planting plants, construction cost high (every square is more than 1000 yuan), can select plant variety few, maintenance costs is large, can not large-scale popularization.
The greenland difficulty coefficient of rock slope is large, and gradient size is directly proportional to construction difficulty or ease.Abrupt slope generally adopts the method for plant biological bag bank protection, in plant biological bag, packs soil into, then builds to slope and pushes up from toe, serike or sowing in plant biological bag.This method cost higher (every square is more than 500 yuan), the aging rear landslide that easily causes of plant bag, dangerous and application life is short.
Utility model content
Based on the deficiencies in the prior art, one of problem to be solved in the utility model is to provide a kind of hollow plantation brick.
Two of problem to be solved in the utility model is to provide a kind of vertical greening structure.
For one of solving the problems of the technologies described above, the utility model provides a kind of hollow plantation brick, and it is rectangle that brick body entirety skeleton is a upper and lower, left and right end face, the quadrangular that front and rear end is parallelogram; The upper surface of described brick body is designed for hollow out; The right side of described brick body is for being provided with the not complete hermetic right rib of breach; The front end face of described brick body and rear end face are provided with irrigation pore; The lower surface of described brick body is provided with drain hole; The angle of lower surface and left side forms retaining groove angle.
As the improvement on the one hand of a kind of hollow plantation brick of the utility model, described left side is also for being provided with the not complete hermetic left rib of breach, in the time that greening is domatic, makes root system of plant penetrate the Nutrition Soil in domatic by breach, can be overall with domatic formation, be conducive to the stable of slope body.
As the improvement on the one hand of a kind of hollow plantation brick of the utility model, the angle of described retaining groove angle is 45 degree, now places that effect is best and safety factor is high.
As the improvement on the one hand of a kind of hollow plantation brick of the utility model, be also provided with the reinforcing baffle plate being fixedly connected with brick body skeleton with lower surface, its reinforce stabilization effect in the time that brick body is long.
As the improvement on the one hand of a kind of hollow plantation brick of the utility model, above-mentioned brick body adopts concrete or plastic processing to form, and the former is more suitable for greening rock slope, and the latter is more suitable in afforesting wall surfaces.
For address the above problem two, the utility model provides a kind of vertical greening structure, it comprises hollow plantation brick, Nutrition Soil, irrigation pipe and bed course that several piece is above-mentioned; Described hollow plantation brick stacks and is bonded together, its left rib and vertical plane to be afforested laminating; In described hollow plantation brick, be filled with the Nutrition Soil for planting plants, the branches and leaves of plant stretch out by the space on the right rib of hollow plantation brick; Described irrigation pipe inserts in the irrigation pore of hollow plantation brick front/rear end; Described bed course pad is on the lower surface of the hollow plantation brick of orlop, and vertical plane to be afforested forms the hollow plantation brick of angle clamping orlop.
As the improvement on the one hand of a kind of vertical greening structure of the utility model, in described vertical greening structure, also comprise and be arranged at anti-layer of the waterproof for the treatment of on greening wall, prevent that root system of plant from damaging body of wall.
It is the geotextiles of 100g/m2 that anti-layer of above-mentioned waterproof generally adopts specification.
As the improvement on the one hand of a kind of vertical greening structure of the utility model, in above-mentioned vertical greening structure, also comprise the water tank being communicated with irrigation pipe, for irrigation pipe provides water source and nutritional labeling, water tank can be arranged on greening structure the top.
As the improvement on the one hand of a kind of vertical greening structure of the utility model, in described vertical greening structure, also comprise the retaining wall between ground and bed course, retaining wall can play firm domatic effect.
As the improvement on the one hand of a kind of vertical greening structure of the utility model, above-mentioned Nutrition Soil thickness is greater than 20cm.
1), catch basin the beneficial effects of the utility model are described below:, formed by the angle of base and rib, have water storage function, can play the effect of saving water resource; 2), shelves limit, upper and lower two shelves limits, shelves a limit there is the function that prevents that soil from being washed away by rainwater.The perform space part office serike above on limit.3), drain hole, be positioned at bottom, there is draining, Water Transport function, penetrate space be provided to root system of plant, make to afforest domatic more stable.4) pore, is positioned at top, and reserved installation is soaked and filled with pipe use, provides moisture and nutrition to plant.5) plantation brick is prismatic body, and more than when installation and ground is 45 degree, metope or domatic and ground formation angle are clamped in place, and between brick and brick, fix with cement or glue, insert soil in brick, and safety is extremely strong.6) plantation brick adopts concrete or plastic material, and life-span service life is long, installs simple and conveniently, easy to operate, and speed of application is fast, and construction cost is low, and maintenance cost is low.
The utility model for existing metope, rock slope Urban Greening have high input, application life is short, maintenance cost is high and uneasy congruent problem, has proposed a kind of new solution thinking.The utlity model has retaining, draining and anti-soil losses function.Processed by concrete or plastic material, life-span service life is long, installs simple and conveniently, easy to operate, and speed of application is fast, and construction cost is low, and maintenance cost is low, and plant range of choice is wide, easily promotes.Special adaptation body of wall, the greening of rock high gradient slope are used.
Brief description of the drawings
The accompanying drawing that forms a part of the present utility model is used to provide further understanding of the present utility model, and schematic description and description of the present utility model is used for explaining the utility model, does not form improper restriction of the present utility model.
Fig. 1 is the structure phantom drawing of a kind of hollow plantation brick of the utility model;
Fig. 2 is the lateral view of a kind of hollow plantation brick of the utility model;
Fig. 3 is the sectional drawing of a kind of vertical greening structure of the utility model;
Fig. 4 is the Facad structure schematic diagram of a kind of vertical greening structure of the utility model;
Fig. 5 is the rock slope greening schematic diagram of a kind of vertical greening structure of the utility model.
In Fig. 1-5, the corresponding relation of Reference numeral is:
Anti-layer of 1-waterproof; The hollow plantation brick of 2-; 3-Nutrition Soil; 4-irrigation pipe; 5-plant;
6-bed course; 7-ground; 8-water tank; 9-retaining wall;
10-retaining groove angle; The left rib of 11-; 12-irrigates pore; 13-lower surface; The right rib of 14-;
15-reinforces baffle plate.
Detailed description of the invention
It should be noted that, in the situation that not conflicting, the feature in embodiment and embodiment in the utility model can combine mutually.Describe below with reference to the accompanying drawings and in conjunction with the embodiments the utility model in detail.For sake of convenience, hereinafter alleged " on ", the direction such as upper and lower of D score etc. and accompanying drawing itself is consistent, but structure of the present utility model do not played to restriction effect.
As depicted in figs. 1 and 2, a kind of hollow plantation brick, it is rectangle that brick body entirety skeleton is a upper and lower, left and right end face, the quadrangular that front and rear end is parallelogram; The upper surface of described brick body is designed for hollow out; The right side of described brick body is for being provided with the not complete hermetic right rib 14 of breach; The front end face of described brick body and rear end face are provided with irrigates pore 12; The lower surface 13 of described brick body is provided with drain hole; The angle of lower surface 13 and left side forms retaining groove angle 10.Described left side is also for being provided with the not complete hermetic left rib 11 of breach.The angle of described retaining groove angle 10 is 45 degree.
In above-mentioned hollow plantation brick, be also provided with the reinforcing baffle plate 15 being fixedly connected with brick body skeleton with lower surface.
As shown in Figure 3 and Figure 4, a kind of vertical greening structure, it comprises hollow plantation brick 2, Nutrition Soil 3, irrigation pipe 4 and bed course 6 that several piece is above-mentioned; Described hollow plantation brick 2 stacks and is bonded together, its left rib 11 and vertical plane to be afforested laminating; In described hollow plantation brick 2, be filled with the Nutrition Soil 3 for planting plants, the branches and leaves of plant stretch out by the space on the right rib 14 of hollow plantation brick 2; Described irrigation pipe 4 inserts in the irrigation pore 12 of hollow plantation brick 2 front/rear ends; Described bed course 6 pads on the lower surface 13 of the hollow plantation brick 2 of orlop, and vertical plane to be afforested forms the hollow plantation brick 2 of angle clamping orlop.
In above-mentioned vertical greening structure, also comprise and be arranged at anti-layer 1 of the waterproof for the treatment of on greening wall.
In described vertical greening structure, also comprise the water tank 8 being communicated with irrigation pipe 4.
Fig. 5 is the rock slope greening schematic diagram of a kind of vertical greening structure of the utility model, due to the particularity of rock slope, therefore there is no anti-layer 1 of waterproof, but has increased the retaining wall 9 between ground 7 and bed course 6.
Stable and the afforestation effect of considering side slope after installing, the utility model is adapted to body of wall, the rock slope of slope stability, and the gradient is not limit.
In order to ensure to plant the safety that brick is installed, bottom, slope should arrange retaining wall 9 or taking concrete surface 7 as basis, on basis, do and be not less than 45 degree concrete cushions 6 according to domatic angular dimension.Hollow plantation brick 2 is installed on bed course 6, after the hollow plantation brick 2 of every installation one deck, is needed backfill Nutrition Soil 3, and compacting, Nutrition Soil 3 flushes with Zhuan Ding.Upper and lower hollow plantation brick 2 is arranged and is arranged as Fig. 2, above middle half brick of the lower row of a row sideline alignment, available cement or glue bond between brick and brick.Plant brick every 2-4 seeding irrigation pipe 4 is installed, install or grout water tank 8 in topmost portion, water tank 8 and each pipeline communication.
After hollow plantation brick 2 installs, domaticly be divided into multiple facets, Nutrition Soil 3 thickness are greater than 20cm, add drip irrigation system, be suitable for the growth of various plants, bring up to " grass+filling+flower " many kinds by original single variety (bank protection use grass planting) or minority kind (body of wall is selected turfgrass or showy flowers of herbaceous plants class) and select, can meet the demand of multiple landscape design, can improve again domatic stability.The plant that selection is selected generally has: turfgrass, climbing plant, liana, undershrub and the showy flowers of herbaceous plants.
Plantation brick is installed on domatic, and as shown in Figure 4, root system of plant can penetrate the Nutrition Soil in domatic, can with domatic formations entirety, be conducive to stablizing of slope body.
For safety, be greater than 70 in the gradient and plant brick height while spending and can not exceed 5 meters, overage need add pillar beam (concrete or steelframe), and in minimizing, the pressure of face brick body to lower floor's brick body, prevents the generation of security incident.
The utility model can solve vertical domatic or precipitous domatic problem that cannot planting plants, can be widely used in the fields such as city wall greening, rock slope greening, the greening of shelves cob wall, ecological environment, increase green area and reduction PM2.5 etc. are had to important reality and far-reaching significance, there is obvious economic effect and social benefit.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (9)

1. a hollow plantation brick, is characterized in that: it is rectangle that brick body entirety skeleton is a upper and lower, left and right end face, the quadrangular that front and rear end is parallelogram; The upper surface of described brick body is designed for hollow out; The right side of described brick body is for being provided with the not complete hermetic right rib of breach (14); The front end face of described brick body and rear end face are provided with irrigates pore (12); The lower surface (13) of described brick body is provided with drain hole; The angle of lower surface (13) and left side forms retaining groove angle (10).
2. hollow plantation brick according to claim 1, is characterized in that: described left side is for being provided with the not complete hermetic left rib of breach (11).
3. hollow plantation brick according to claim 1, is characterized in that: the angle of described retaining groove angle (10) is 45 degree.
4. hollow plantation brick according to claim 1, is characterized in that: be also provided with the reinforcing baffle plate (15) being fixedly connected with brick body skeleton with lower surface.
5. a vertical greening structure, is characterized in that: comprise that several piece is according to the hollow plantation brick (2) described in claim 1-3 any, Nutrition Soil (3), irrigation pipe (4) and bed course (6); Described hollow plantation brick (2) stacks and is bonded together, its left rib (11) and vertical plane to be afforested laminating; In described hollow plantation brick (2), be filled with the Nutrition Soil (3) for planting plants, the branches and leaves of plant stretch out by the space on the right rib (14) of hollow plantation brick (2); Described irrigation pipe (4) inserts in the irrigation pore (12) of hollow plantation brick (2) front/rear end; Described bed course (6) pad is upper in the lower surface (13) of the hollow plantation brick of orlop (2), and vertical plane to be afforested forms the angle clamping hollow plantation brick of orlop (2).
6. vertical greening structure according to claim 5, is characterized in that: in described vertical greening structure, also comprise and be arranged at anti-layer of the waterproof for the treatment of on greening wall (1).
7. vertical greening structure according to claim 6, is characterized in that: it is 100g/m that anti-layer of described waterproof (1) adopts specification 2geotextiles.
8. vertical greening structure according to claim 5, is characterized in that: in described vertical greening structure, also comprise and irrigation pipe (4) be communicated with water tank (8).
9. vertical greening structure according to claim 5, is characterized in that: in described vertical greening structure, also comprise the retaining wall (9) being positioned between ground (7) and bed course (6).
10.vertical greening structure according to claim 5, is characterized in that: described Nutrition Soil (3) thickness is greater than 20cm.
CN201420180363.3U 2014-04-15 2014-04-15 Hollow planting brick and vertical greening structure Expired - Fee Related CN203856124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420180363.3U CN203856124U (en) 2014-04-15 2014-04-15 Hollow planting brick and vertical greening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420180363.3U CN203856124U (en) 2014-04-15 2014-04-15 Hollow planting brick and vertical greening structure

Publications (1)

Publication Number Publication Date
CN203856124U true CN203856124U (en) 2014-10-01

Family

ID=51605986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420180363.3U Expired - Fee Related CN203856124U (en) 2014-04-15 2014-04-15 Hollow planting brick and vertical greening structure

Country Status (1)

Country Link
CN (1) CN203856124U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883066A (en) * 2014-04-15 2014-06-25 湖南天泉科技开发有限公司 Hollow planting brick and vertical greening structure
CN104429690A (en) * 2014-11-18 2015-03-25 成都格瑞思文化传播有限公司 Landscaping wall structure
CN104790589A (en) * 2015-03-26 2015-07-22 成都格瑞思文化传播有限公司 Landscape pillar for residence community
CN105393827A (en) * 2015-12-15 2016-03-16 刘超 Environment-friendly plant plantation plate
CN109006324A (en) * 2018-08-08 2018-12-18 昆明春景园林绿化有限责任公司 A kind of method for greening side slope that late maintaining difficulty is effectively reduced

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883066A (en) * 2014-04-15 2014-06-25 湖南天泉科技开发有限公司 Hollow planting brick and vertical greening structure
CN103883066B (en) * 2014-04-15 2016-04-06 湖南天泉科技开发有限公司 A kind of hollow plantation brick and vertical greening structure
CN104429690A (en) * 2014-11-18 2015-03-25 成都格瑞思文化传播有限公司 Landscaping wall structure
CN104790589A (en) * 2015-03-26 2015-07-22 成都格瑞思文化传播有限公司 Landscape pillar for residence community
CN105393827A (en) * 2015-12-15 2016-03-16 刘超 Environment-friendly plant plantation plate
CN109006324A (en) * 2018-08-08 2018-12-18 昆明春景园林绿化有限责任公司 A kind of method for greening side slope that late maintaining difficulty is effectively reduced

Similar Documents

Publication Publication Date Title
CN103883066B (en) A kind of hollow plantation brick and vertical greening structure
CN203856124U (en) Hollow planting brick and vertical greening structure
CN201957502U (en) Roof planting box
CN101543171A (en) Stereo combined flower pot with function of drop irrigation
CN103650966B (en) A kind of modularization vertical greening device and manufacture method thereof
CN202587942U (en) Double-purpose box for plant cultivation and root system penetration force experiments
CN2894249Y (en) Water-storage greening plant cultivation pot
CN201048493Y (en) Stereo combined flower pot
KR101187406B1 (en) Moss panel and method for greening artificial construction using the same
CN203597151U (en) Modularized vertical greening device
CN205546831U (en) three-dimensional planting system
KR101203135B1 (en) planter apparatus and method for wall afforestation
CN204579287U (en) System vertical planting technique system
CN203424097U (en) Three-dimensional greening module
KR101187407B1 (en) Wall-greening apparatus and wall-greening method using the same
CN104719033A (en) Indoor appreciation sympodial bamboo root control directional cultivation device and method
CN207194140U (en) A kind of building being easy in balcony planting vegetables or flowers
CN107326775A (en) The lawn system that a kind of Artificial grass and natural grass are combined
CN106088489A (en) Box body combinations roof greening roof and water discharge method
CN210446442U (en) Plant exhibition frame for horticulture
CN209234375U (en) A kind of roof greening module
CN209299789U (en) A kind of compound tree pond
CN203735149U (en) Roof garden large-scale tree fixing structure
CN207269444U (en) Plant the plantation ridge structure of factory plantation pseudo-ginseng
CN206220372U (en) Box body combinations roof greening roof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HUNAN TIANQUAN ECOLOGICAL GRASS ENGINEERING CO., L

Free format text: FORMER NAME: TIANQUAN SCIENCE AND TECHNOLOGY DEVELOPMENT CO., LTD., HUNAN

CP03 Change of name, title or address

Address after: 410000, No. 109, pixel building, 2221 Gu Gu Road, Changsha hi tech Development Zone, Hunan, Changsha

Patentee after: Hunan Tianquan ecological grass industrial engineering (IE) Co., Ltd

Address before: 410007 Hunan province Changsha City Lugu high tech Development Zone, Valley Road No. 109 pixel Department building 22 floor

Patentee before: Hunan Tianquan Technology Development Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141001

Termination date: 20210415