CN203716138U - Concrete protecting pile - Google Patents

Concrete protecting pile Download PDF

Info

Publication number
CN203716138U
CN203716138U CN201420079238.3U CN201420079238U CN203716138U CN 203716138 U CN203716138 U CN 203716138U CN 201420079238 U CN201420079238 U CN 201420079238U CN 203716138 U CN203716138 U CN 203716138U
Authority
CN
China
Prior art keywords
pile body
pile
prestressed steel
concrete
good
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420079238.3U
Other languages
Chinese (zh)
Inventor
李全民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420079238.3U priority Critical patent/CN203716138U/en
Application granted granted Critical
Publication of CN203716138U publication Critical patent/CN203716138U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a concrete protecting pile. A plurality of prestressed steel bars are arranged in a pile body in the vertical direction of the pile body, steel wire meshes are arranged on the prestressed steel bars, reinforcing steel bar anchor nuts are arranged at two ends of each prestressed steel bar respectively, a U-shaped socket is formed in one end of the pile body, an insert matched with the U-shaped socket is arranged at the other end of the pile body, and a flexible rubber sleeve covers and is fixed on the insert through a countersunk crab shell bolt. With the adoption of the scheme, the pile is reasonable in structural design, a flexible socket structure is adopted, two adjacent concrete protecting piles are closely connected, and the sealing effect is good, so that a formed concrete protecting wall has water and mud stopping functions, the slope protection effect is good, the water loss and soil erosion are avoided, the dam protection effect is good, phenomena of leakage, perforation and the like of a dam are eliminated, and the safety of the dam is guaranteed.

Description

A kind of Concrete Anti fender pile
Technical field:
The utility model relates to a kind of Concrete Anti fender pile.
Background technology:
Concrete Anti fender pile is building materials conventional in preventive works, when use, multiple fender piles are rammed and are driven underground, form Concrete Anti revetment, for bank protection, bank protection, gear soil, the engineerings such as cofferdam, existing Concrete Anti fender pile is generally without socket and connects or the connection of U-shaped rigidity socket, during due to construction, can there is deviation, between adjacent two fender piles that connect without socket, often there is gap and do not have each other mechanical connection to be easily offset, there is no equally each other yet easily skew of mechanical connection and adopt U-shaped rigidity socket to connect, even if the gap between its adjacent two fender piles adopts water jetting at high pressure, also can there is gap in concrete perfusion slurry, the Concrete Anti revetment protection effect forming is like this poor, easily cause soil erosion, bank protection effect is poor, easily there is seepage in dykes and dams, the phenomenons such as perforation, even there is landslide, the accidents such as dam break.
Utility model content:
The utility model is in order to make up the deficiencies in the prior art, a kind of Concrete Anti fender pile is provided, and its reasonable in design, adopts flexible insert mouth structure, between adjacent two Concrete Anti fender piles, mechanical connection is closely reliable, good sealing effect, the Concrete Anti revetment forming like this can reach sealing, the only effect of mud, and protection effect is good, avoid soil erosion, bank protection is made good use of, and has avoided dykes and dams to occur the phenomenon such as seepage, perforation, has ensured embankment safety.
The utility model for solving the problems of the technologies described above adopted technical scheme is:
A kind of Concrete Anti fender pile, be provided with some prestressed steel bars in pile body inside along the vertical direction of pile body, on prestressed steel bar, be provided with gauze wire cloth, be respectively equipped with Bar Anchorage nut at the two ends of prestressed steel bar, be provided with U-shaped bellmouth in one end of pile body, be provided with the plug-in unit matching with U-shaped bellmouth at the other end of pile body, one flexible rubber lagging is coated and fixed on plug-in unit by countersunk head crab shell bolt, on two straight ends of U-shaped bellmouth, be vertically arranged with several the first bolts hole, put and be provided with several the second relative with the first bolt hole position and match bolts hole at plug-in unit and flexible rubber, be provided with several holes for hoist on pile body top.
Described pile body is template concrete protection pile body.
Described pile body is square concrete protection pile body.
The utility model adopts such scheme, reasonable in design, adopt flexible insert mouth structure, between adjacent two fender piles, mechanical connection is closely reliable, good sealing effect, the Concrete Anti revetment concrete strength forming is like this up to more than C60, anti-bending strength is good, can reach sealing, the only effect of mud, protection effect is good, avoid the soil erosion on slope, river, arid basin so that the cold-resistant green plants of plantation, the anchoring nut of pile crown can be fixed the protecting wire net on slope, river with protection vegetation, upper soll layer, bank protection, bank protection is made good use of, avoid dykes and dams to occur seepage, the phenomenons such as perforation, ensure embankment safety, problems of the prior art are solved, adopt digging machine or small vibrating hammering ram machine construction easily, its construction cost, construction period, material cost is well below the stone pitching of heap of stone on slope, river, quality is also more sure, the present invention is especially to northern the Yellow River, the alluvial in Grand Canal, Hangzhoupro, capital, cutout is administered and is of great significance.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Fig. 2 is top view of the present utility model.
Fig. 3 is square Concrete Anti fender pile schematic diagram.
In figure, 1, pile body, 2, prestressed steel bar, 3, Bar Anchorage nut, 4, U-shaped bellmouth, 5, plug-in unit, 6, flexible rubber lagging, 7, countersunk head crab shell bolt, 8, the first bolt hole, 9, the second bolt hole, 10, hole for hoist.
Detailed description of the invention:
For clearly demonstrating the technical characterstic of this programme, below by detailed description of the invention, and in conjunction with its accompanying drawing, the utility model is elaborated.
As Figure 1-3: a kind of Concrete Anti fender pile, be provided with some prestressed steel bars 2 in pile body 1 inside along the vertical direction of pile body 1, on prestressed steel bar 2, be provided with gauze wire cloth, be respectively equipped with Bar Anchorage nut 3 at the two ends of prestressed steel bar 2, be provided with U-shaped bellmouth 4 in one end of pile body 1, be provided with the plug-in unit 5 matching with U-shaped bellmouth 4 at the other end of pile body 1, one flexible rubber lagging 6 is coated and fixed on plug-in unit 5 by countersunk head crab shell bolt 7, on two straight ends of U-shaped bellmouth 4, be vertically arranged with several the first bolts hole 8, on plug-in unit 5 and flexible rubber lagging 6, be provided with several the second relative with the first bolt hole 8 positions and match bolts hole 9, be provided with several holes for hoist 10 on pile body 1 top.
Described pile body 1 is template concrete protection pile body.Volume is little, and consumptive material is few, and cost is low, and manufacture craft is simple.
Described pile body 1 is square concrete protection pile body.For strengthening the bulk strength of concrete protection body of wall.
When construction, the hole for hoist 10 that utilization is arranged on pile body 1 is sling Concrete Anti fender pile, by leading truck, the plug-in unit 5 that is coated with flexible rubber lagging 6 on Concrete Anti fender pile is slowly pressed in the U-shaped bellmouth 4 on adjacent Concrete Anti fender pile, flexible rubber lagging 6 seals the gap filling between plug-in unit 5 and U-shaped bellmouth 4, and then connecting bolt is passed and is arranged on the first bolt hole 8 on U-shaped bellmouth 4 and is arranged on the second bolt hole 9 on plug-in unit 5 and flexible rubber lagging 6, adjacent two Concrete Anti fender piles are fastenedly connected, mode is linked in sequence and can forms the Concrete Anti revetment of good sealing effect according to this.According to the construction requirement of object of construction production, in template Concrete Anti fender pile, every certain distance, a square Concrete Anti fender pile is installed, can play like this effect that strengthens concrete protection body of wall bulk strength.
The utility model reasonable in design, adopt flexible insert mouth structure, between adjacent two Concrete Anti fender piles, connect closely, good sealing effect, the Concrete Anti revetment forming like this can reach sealing, the only effect of mud, and protection effect is good, avoid soil erosion, bank protection is made good use of, and has avoided dykes and dams to occur the phenomenon such as seepage, perforation, has ensured embankment safety.
The utility model does not describe part in detail, is those skilled in the art of the present technique's known technology.

Claims (3)

1. a Concrete Anti fender pile, comprise a pile body, be provided with some prestressed steel bars in pile body inside along the vertical direction of pile body, on prestressed steel bar, be provided with gauze wire cloth, be respectively equipped with Bar Anchorage nut at the two ends of prestressed steel bar, it is characterized in that: be provided with U-shaped bellmouth in one end of pile body, be provided with the plug-in unit matching with U-shaped bellmouth at the other end of pile body, one flexible rubber lagging is coated and fixed on plug-in unit by countersunk head crab shell bolt, on two straight ends of U-shaped bellmouth, be vertically arranged with several the first bolts hole, put and be provided with several the second relative with the first bolt hole position and match bolts hole at plug-in unit and flexible rubber, be provided with several holes for hoist on pile body top.
2. a kind of Concrete Anti fender pile according to claim 1, is characterized in that: described pile body is template concrete protection pile body.
3. a kind of Concrete Anti fender pile according to claim 1, is characterized in that: described pile body is square concrete protection pile body.
CN201420079238.3U 2014-02-24 2014-02-24 Concrete protecting pile Withdrawn - After Issue CN203716138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420079238.3U CN203716138U (en) 2014-02-24 2014-02-24 Concrete protecting pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420079238.3U CN203716138U (en) 2014-02-24 2014-02-24 Concrete protecting pile

Publications (1)

Publication Number Publication Date
CN203716138U true CN203716138U (en) 2014-07-16

Family

ID=51155307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420079238.3U Withdrawn - After Issue CN203716138U (en) 2014-02-24 2014-02-24 Concrete protecting pile

Country Status (1)

Country Link
CN (1) CN203716138U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758116A (en) * 2014-02-24 2014-04-30 李全民 Concrete protection pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758116A (en) * 2014-02-24 2014-04-30 李全民 Concrete protection pile

Similar Documents

Publication Publication Date Title
CN102995602B (en) Silt coast sheep pile wharf structure and construction method
CN208650073U (en) Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction
CN104695380B (en) The shore protection structure of a kind of plastic-steel sheet pile and concrete combination
CN109339065B (en) Method for deep water exposed bedrock close-packed pile supporting construction bearing platform
CN108797653A (en) A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post
CN101565940B (en) Coupling structure of gravity dam and unfavorable geological bank slope and the construction method thereof
CN203716138U (en) Concrete protecting pile
CN208517891U (en) The novel reinforced structure of gravity type quay
CN204266164U (en) Concrete veneer and grill-shaped cement soil wall combined type bank protection structure
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN108411934B (en) Floating tubular pile, dam retaining structure and construction method thereof
CN204849734U (en) Prefabricated sheet pile and manger plate fender building structure for soil
CN103758116B (en) A kind of concrete protection pile
CN106854864A (en) Port engineering platoon formula prestressed reinforced concrete Big Pipe Pile new construction
CN204282295U (en) Pile formula case cylinder breakwater structure
CN111042161A (en) Slope collapse high slope flexible processing structure and construction method thereof
CN211498907U (en) Waterproof curtain at end of underwater channel foundation pit along two sides of water
CN212801549U (en) H-shaped double-row steel sheet pile supporting structure
CN209958290U (en) Take shore protection structure of pile foundation
CN104195980B (en) A kind of outfitting quay structure
CN203546740U (en) Riverway closure dike structure
CN201713761U (en) Hollow and closed type steel caisson cofferdam
CN210636449U (en) Prevention of seepage water structure of diaphragm wall seam crossing
CN209636720U (en) A kind of Gravity Type Casisson Berth
CN209385141U (en) A kind of railway tunnel safeguard structure intersected with water tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140716

Effective date of abandoning: 20160622

C25 Abandonment of patent right or utility model to avoid double patenting