CN108797653A - A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post - Google Patents

A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post Download PDF

Info

Publication number
CN108797653A
CN108797653A CN201810568441.XA CN201810568441A CN108797653A CN 108797653 A CN108797653 A CN 108797653A CN 201810568441 A CN201810568441 A CN 201810568441A CN 108797653 A CN108797653 A CN 108797653A
Authority
CN
China
Prior art keywords
foundation pit
construction
concrete
deep foundation
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810568441.XA
Other languages
Chinese (zh)
Inventor
邱太岗
徐永博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201810568441.XA priority Critical patent/CN108797653A/en
Publication of CN108797653A publication Critical patent/CN108797653A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

A kind of construction method being carried out structural anti-buoyancy using deep foundation pit fender post, is included the following steps:(1) deep foundation pit support goes along with sb. to guard him pile driving construction, (2) foundation pit support construction, (3) deep foundation pit precipitation and earth excavation, (4) fender post protection concrete cover picks chisel, (5) are welded to connect U-shaped steel bar stress, (6) anti-floating beam reinforced steel bar concrete, (7) sole plate waterproof roll and protective layer construction, the construction of (8) sole plate reinforced concrete, (9) basement structure construction.The present invention is directed to the other technologies measure of underground high water level Deep Foundation Structure anti-floating setting, on the one hand, buoyancy is reached deep foundation pit fender post (wall) by deep foundation by anti-floating beam (plate), it makes full use of and goes along with sb. to guard him piling wall vertically pulling-resistant ability resistance buoyancy force of underground water, reduce setting anti-floating pile (anchor pole) construction input;On the other hand, agent structure sole plate is connect with anti-floating concrete beam (plate) by biting connecions power transmission keyway, is conducive to waterproofing for basement.

Description

A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post
Technical field
The present invention relates to technical field of building construction, belong to the underground structure anti-floating construction technology of building engineering field, relate to And a kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post.
Background technology
As urban construction continues to develop, the utilization of the underground space are gradually increased, it is tight to alleviate urban land resource In project development depth, deep development is extended to by shallow-layer exploitation by Zhang Wenti.The buoyancy force of underground water of deep foundation crosses conference and causes ground Lower structure floats or even component damage.Currently, using setting anti-floating pile, anti-float anchor rod, increase structure weight and drop row in engineering The methods of water is solved.Conventional construction method, which exists, to be increased construction period, increases project inputs, is unfavorable for engineering and is used rank Many drawbacks such as section maintenance management.
Invention content
It is an object of the invention in place of overcome the deficiencies in the prior art, provide a kind of removable dewatering well wellhead sealing dress It sets and slip casting plugging construction method.The construction method in high permeability, high water level, contain abundant area, using the present invention seal Stifled dewatering well reliable in quality, can meet the requirements.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of construction method being carried out structural anti-buoyancy using deep foundation pit fender post, is included the following steps:
(1) deep foundation pit support goes along with sb. to guard him pile driving construction:According to Design of Deep Foundation Pit Support construction fender post, fender post uses reinforced concrete The schemes such as campshed or diaphram wall of perfusion;
(2) foundation pit support construction:According to Design of Deep Foundation Pit Support scheme construction foundation pit inner support system, reinforced concrete support with Fender post is reliably connected;
(3) deep foundation pit precipitation and earth excavation:Foundation pit waterproof curtain intensity reaches design requirement, carries out base pit dewatering.It presses According to layering, segmentation, on-demand precipitation technology requires to construct, and underground water is down to cutting depth 1m or less and carries out base in excavation range Cheat earth excavation;
(4) fender post protection concrete cover picks chisel:1 anti-floating depth of beam of piling wall is gone along with sb. to guard him in excavation of foundation pit to substrate absolute altitude, cleaning Range inner protective layer concrete exposes connection embedded part or stress main reinforcement;
(5) it is welded to connect U-shaped steel bar stress:Weld stress " u "-shaped reinforcing bar in anti-floating concrete beam, diameter, the spacing warp of reinforcing bar Anti-floating, which calculates, to be determined, reinforcement welding welding by both sides is no less than 5d or single welding length is not less than 10d;
(6) anti-floating beam reinforced steel bar concrete:After the completion of connecting U-shaped reinforcement welding, the binding of anti-floating girder construction reinforcing bar and side form are carried out Installation, side form use die mould steel form, and qualified progress concrete placings, concrete strength are not less than C30 by inspection for reinforcing bar and template;
(7) sole plate waterproof roll and protective layer construction:Wait for that sole plate bed course and anti-floating beam concrete coagulate soil and pour completion Sole plate and side waterproof coiled material construction are carried out, coiled material height in side meets overlap joint and requires, and acceptance(check) carries out waterproofing protection Layer construction.
(8) sole plate reinforced concrete is constructed:The binding of sole plate reinforcing bar, template installation and concrete are carried out according to design drawing to pour Construction is built, pays attention to protecting waterproof layer in work progress;
(9) basement structure construction;Basement structure reinforced concrete, waterproof roll and protective layer are carried out according to design drawing to apply Then work carries out outdoor fertile slot backfill construction.
Above-mentioned biting connecions stress sunk key width is 150~200mm, and depth is 50~80mm, and corner is 45 °.
Above structure plate outer side biting connecions stress sunk key is arranged on the outside of sole plate, and through Design of Main Structure unit Approve.
Before above-mentioned anti-floating beam resists buoyancy force of underground water, concrete strength must reach design requirement.
D is bar diameter in above-mentioned steps (5).
Advantages of the present invention and economic effect are:
The present invention is directed to the other technologies measure of underground high water level Deep Foundation Structure anti-floating setting, on the one hand, deep foundation is logical It crosses anti-floating beam (plate) and buoyancy is reached into deep foundation pit fender post (wall), make full use of and go along with sb. to guard him piling wall vertically pulling-resistant ability resistance underground water Buoyancy reduces setting anti-floating pile (anchor pole) construction input;On the other hand, agent structure sole plate passes through with anti-floating concrete beam (plate) Biting connecions power transmission keyway connects, and is conducive to waterproofing for basement.
Description of the drawings
Fig. 1 is that the present invention utilizes fender post float Structure figure;
Fig. 2 is fender post of the present invention and sole plate connection diagram;
Fig. 3 is anti-floating side bar stress sunk key structural schematic diagram of the present invention.
Specific implementation mode
For that can further appreciate that present disclosure, feature and effect, the following examples are hereby given, and coordinates attached drawing detailed It is described as follows.It should be noted that the present embodiment is descriptive, it is not restrictive, cannot thus limits the guarantor of the present invention Protect range.
As shown in Figure 1 to Figure 3, a kind of retaining piles construction method of deep basal pit closing sealing, includes the following steps:
(1) deep foundation pit support fender post (wall) is constructed:According to Design of Deep Foundation Pit Support construction fender post (wall) 1, fender post (wall) 1 is using schemes such as reinforcing bar concrete pouring campshed or diaphram walls;
(2) foundation pit support construction:According to Design of Deep Foundation Pit Support scheme construction foundation pit inner support system 2, reinforced concrete (steel) Support 2 is reliably connected with fender post (wall) 1;
(3) deep foundation pit precipitation and earth excavation:Foundation pit waterproof curtain intensity reaches design requirement, carries out base pit dewatering.It presses According to layering, segmentation, on-demand precipitation technology requires to construct, and underground water is down to cutting depth 1m or less and carries out base in excavation range Cheat earth excavation;
(4) fender post (wall) 1 protects concrete cover to pick chisel:1 anti-floating beam of piling wall is gone along with sb. to guard him in excavation of foundation pit to substrate absolute altitude, cleaning (plate) 3 altitude range inner protective layer concrete exposes connection embedded part or stress main reinforcement;
(5) it is welded to connect U-shaped steel bar stress 10:Weld stress " u "-shaped reinforcing bar 10 in anti-floating concrete beam (plate) 3, reinforcing bar it is straight Diameter, spacing are calculated through anti-floating and are determined, reinforcement welding welding by both sides is no less than 5d or single welding length, and not less than 10d, (d is that reinforcing bar is straight Diameter);
(6) anti-floating beam reinforced steel bar concrete 3:After the completion of connecting 10 welding of U-shaped reinforcing bar, the binding of anti-floating beam (plate) structure reinforcing bars is carried out And side form installation, using die mould steel form (convenient for the 9 part concrete placings molding of stress keyway), reinforcing bar and template experience fold side form Lattice carry out concrete placings, and concrete strength is not less than C30;
(7) sole plate waterproof roll and protective layer 5 are constructed:Wait for that sole plate bed course 4 and 3 concrete of anti-floating beam (plate) coagulate soil and pour It builds completion and carries out sole plate 6 and the construction of side waterproof roll 5, coiled material 5 height in side meets overlap joint and requires, and acceptance(check) carries out Fish tail and waterproof layer is constructed.
(8) 6 reinforced concrete of sole plate is constructed:The binding of 6 reinforcing bar of sole plate, template installation and concrete are carried out according to design drawing Pouring construction pays attention to protecting waterproof layer 5 in work progress;
(9) basement structure 7 is constructed;7 structure reinforcing bars concrete of basement, waterproof roll and protective layer are carried out according to design drawing Then construction carries out the outdoor fertile backfill of slot 8 construction.
The present invention constructs suitable for high water level area underground structure anti-floating, and the present invention is directed to underground high water level Deep Foundation Structure The other technologies measure of anti-floating setting, on the one hand, buoyancy is reached deep foundation pit fender post (wall) by deep foundation by anti-floating beam (plate), It makes full use of and goes along with sb. to guard him piling wall vertically pulling-resistant ability resistance buoyancy force of underground water, reduce setting anti-floating pile (anchor pole) construction input;It is another Aspect, agent structure sole plate are connect by biting connecions power transmission keyway with anti-floating concrete beam (plate), are conducive to basement waterproofing and apply Work.
The present invention does not limit to the above embodiment, anyone can obtain other various forms under the inspiration of the present invention Product.All equivalent changes and modifications done according to scope of the present invention patent should all belong to the covering scope of the present invention.

Claims (5)

1. a kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post, it is characterised in that:Include the following steps:
(1) deep foundation pit support goes along with sb. to guard him pile driving construction:According to Design of Deep Foundation Pit Support construction fender post, fender post uses reinforcing bar concrete pouring The schemes such as campshed or diaphram wall;
(2) foundation pit support construction:According to Design of Deep Foundation Pit Support scheme construction foundation pit inner support system, reinforced concrete is supported and is gone along with sb. to guard him Stake is reliably connected;
(3) deep foundation pit precipitation and earth excavation:Foundation pit waterproof curtain intensity reaches design requirement, carries out base pit dewatering.According to point Layer, segmentation, on-demand precipitation technology require to construct, and underground water is down to cutting depth 1m or less and carries out foundation pit earth in excavation range It excavates side;
(4) fender post protection concrete cover picks chisel:1 anti-floating depth of beam range of piling wall is gone along with sb. to guard him in excavation of foundation pit to substrate absolute altitude, cleaning Inner protective layer concrete exposes connection embedded part or stress main reinforcement;
(5) it is welded to connect U-shaped steel bar stress:Stress " u "-shaped reinforcing bar in anti-floating concrete beam is welded, the diameter of reinforcing bar, spacing are through anti-floating It calculates and determines, reinforcement welding welding by both sides is no less than 5d or single welding length is not less than 10d;
(6) anti-floating beam reinforced steel bar concrete:After the completion of connecting U-shaped reinforcement welding, the binding of anti-floating girder construction reinforcing bar and side form installation are carried out, Side form uses die mould steel form, and qualified progress concrete placings, concrete strength are not less than C30 by inspection for reinforcing bar and template;
(7) sole plate waterproof roll and protective layer construction:Wait for that sole plate bed course and anti-floating beam concrete coagulate soil and pour completion progress Sole plate and side waterproof coiled material construction, side coiled material height meet overlap joint and require, and acceptance(check) carries out fish tail and waterproof layer and applies Work.
(8) sole plate reinforced concrete is constructed:The binding of sole plate reinforcing bar, template installation and concrete placings are carried out according to design drawing to apply Work pays attention to protecting waterproof layer in work progress;
(9) basement structure construction;Basement structure reinforced concrete, waterproof roll and protective layer construction are carried out according to design drawing, Then outdoor fertile slot backfill construction is carried out.
2. a kind of construction method being carried out structural anti-buoyancy using deep foundation pit fender post according to claim 1, feature are existed In:Above-mentioned biting connecions stress sunk key width is 150~200mm, and depth is 50~80mm, and corner is 45 °.
3. a kind of construction method being carried out structural anti-buoyancy using deep foundation pit fender post according to claim 1, feature are existed In:Above structure plate outer side biting connecions stress sunk key is arranged on the outside of sole plate, and approves through Design of Main Structure unit.
4. a kind of construction method being carried out structural anti-buoyancy using deep foundation pit fender post according to claim 1, feature are existed In:Before above-mentioned anti-floating beam resists buoyancy force of underground water, concrete strength must reach design requirement.
5. a kind of construction method being carried out structural anti-buoyancy using deep foundation pit fender post according to claim 1, feature are existed In:D is bar diameter in above-mentioned steps (5).
CN201810568441.XA 2018-06-05 2018-06-05 A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post Pending CN108797653A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810568441.XA CN108797653A (en) 2018-06-05 2018-06-05 A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810568441.XA CN108797653A (en) 2018-06-05 2018-06-05 A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post

Publications (1)

Publication Number Publication Date
CN108797653A true CN108797653A (en) 2018-11-13

Family

ID=64088497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810568441.XA Pending CN108797653A (en) 2018-06-05 2018-06-05 A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post

Country Status (1)

Country Link
CN (1) CN108797653A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733894A (en) * 2020-06-10 2020-10-02 中国一冶集团有限公司 Anti-floating system of deep foundation pit underground structure and construction process
CN114164859A (en) * 2021-12-28 2022-03-11 中建东设岩土工程有限公司 Well type intelligent underground parking garage suitable for northern cold environment
CN114411819A (en) * 2021-12-12 2022-04-29 中建三局集团有限公司 Method for replacing anti-floating measure by permanently and temporarily combining supporting system and main body structure
CN114575391A (en) * 2020-11-29 2022-06-03 中铁十二局集团有限公司 Subway station floating beam resisting construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11193641A (en) * 1997-11-06 1999-07-21 Takenaka Komuten Co Ltd Reconstruction method of structure
CN105002913A (en) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof
CN105239607A (en) * 2015-10-19 2016-01-13 苏州大学 Integrated anti-floating structure of underground diaphragm wall and concrete structure bottom plate and construction method of integrated anti-floating structure
CN206233272U (en) * 2016-11-24 2017-06-09 大象建筑设计有限公司 A kind of anti-floating of underground building structure
CN107100208A (en) * 2017-06-29 2017-08-29 中铁第四勘察设计院集团有限公司 The anti-floating waterproof construction and construction method of a kind of underground structure
CN107542115A (en) * 2017-08-25 2018-01-05 广西金雨伞防水装饰有限公司 Underground project waterproof structure and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11193641A (en) * 1997-11-06 1999-07-21 Takenaka Komuten Co Ltd Reconstruction method of structure
CN105002913A (en) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof
CN105239607A (en) * 2015-10-19 2016-01-13 苏州大学 Integrated anti-floating structure of underground diaphragm wall and concrete structure bottom plate and construction method of integrated anti-floating structure
CN206233272U (en) * 2016-11-24 2017-06-09 大象建筑设计有限公司 A kind of anti-floating of underground building structure
CN107100208A (en) * 2017-06-29 2017-08-29 中铁第四勘察设计院集团有限公司 The anti-floating waterproof construction and construction method of a kind of underground structure
CN107542115A (en) * 2017-08-25 2018-01-05 广西金雨伞防水装饰有限公司 Underground project waterproof structure and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘伟等: "昆明轨道交通3号线深基坑岩土工程勘察与评价", 《铁道工程学报》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733894A (en) * 2020-06-10 2020-10-02 中国一冶集团有限公司 Anti-floating system of deep foundation pit underground structure and construction process
CN114575391A (en) * 2020-11-29 2022-06-03 中铁十二局集团有限公司 Subway station floating beam resisting construction method
CN114575391B (en) * 2020-11-29 2023-10-13 中铁十二局集团有限公司 Subway station anti-floating beam construction method
CN114411819A (en) * 2021-12-12 2022-04-29 中建三局集团有限公司 Method for replacing anti-floating measure by permanently and temporarily combining supporting system and main body structure
CN114164859A (en) * 2021-12-28 2022-03-11 中建东设岩土工程有限公司 Well type intelligent underground parking garage suitable for northern cold environment

Similar Documents

Publication Publication Date Title
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN106120839B (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN108797653A (en) A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post
CN104846841B (en) Anti-floating construction method for basements without uplift piles
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN106193032B (en) A kind of anti-float anchor rod construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN208650073U (en) Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction
CN107542115A (en) Underground project waterproof structure and its construction method
CN106193082A (en) Stake raft construction technology in a kind of Shallow-buried soft plastomer Karst Tunnel
CN101597904A (en) A kind of splash guard pile cofferdam and job practices thereof
CN107012871B (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction
CN102116030A (en) Combined bracing structure for foundation pit and construction method thereof
CN102561371A (en) Steel caisson enclosure structure at island-tunnel combination part
CN108071122A (en) Assembled underground pipe gallery and its construction method
CN206646497U (en) A kind of clad steel casing structure
CN108166532A (en) A kind of groutable underground continuous wall connector and its construction method
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN203768925U (en) Seal device for dewatering well in foundation pit
CN117107749A (en) Construction method of large-diameter punched bored pile under influence of sea water seepage in sea-filling land-building area
CN209260739U (en) A kind of foundation pit water-stopping system close to river permeable stratum
CN111042161A (en) Slope collapse high slope flexible processing structure and construction method thereof
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181113