CN210636449U - Prevention of seepage water structure of diaphragm wall seam crossing - Google Patents

Prevention of seepage water structure of diaphragm wall seam crossing Download PDF

Info

Publication number
CN210636449U
CN210636449U CN201920900677.9U CN201920900677U CN210636449U CN 210636449 U CN210636449 U CN 210636449U CN 201920900677 U CN201920900677 U CN 201920900677U CN 210636449 U CN210636449 U CN 210636449U
Authority
CN
China
Prior art keywords
steel sheet
piles
grouting
joint
continuous wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920900677.9U
Other languages
Chinese (zh)
Inventor
陈娟
臧延伟
熊松
曹妙凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201920900677.9U priority Critical patent/CN210636449U/en
Application granted granted Critical
Publication of CN210636449U publication Critical patent/CN210636449U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a seepage-proofing structure at the joint of a continuous wall, which comprises a plurality of steel sheet piles and jet-grouting piles; the steel sheet piles are overlapped and inserted into one row at the outer side of the leakage point, and the formed area is enough to cover the leakage point; and arranging jet-grouting piles at the gaps between the steel sheet piles at the two end parts and the continuous wall, and grouting and reinforcing the gaps between the steel sheet piles at the other positions and the continuous wall. The technical scheme is simple in process and convenient to operate, the problems that the conventional diaphragm wall joint water leakage is difficult to treat and the effect is poor can be effectively solved, and the water stopping effect of the joint is good. Meanwhile, the steel sheet pile can be recycled, green construction is achieved, safety and economy are achieved, and the influence on the surrounding environment of the continuous wall is small.

Description

Prevention of seepage water structure of diaphragm wall seam crossing
Technical Field
The utility model relates to a diaphragm wall seam crossing prevention of seepage water structure.
Background
A continuous wall trial foundation project adopts a long and narrow deep groove on the ground along the peripheral axis of a deep excavation project at the excavation position under the condition of slurry wall protection by adopting a groove digging machine. Under the complicated geological conditions, particularly in the sandy stratum, the influence of the construction quality of the continuous wall easily causes the mud clamping phenomenon in the grooving process, and finally forms the seam water seepage phenomenon, thus causing the instability of the structure. At present, the domestic foundation pit water seepage accidents mainly occur at the joint position of the continuous wall, so that the water stopping effect of the joint position of the continuous wall is an important link for ensuring the safety of the foundation pit.
The water stopping reinforcing measures commonly used at the joint of the existing continuous wall are that a rotary spraying water stopping pile is applied behind the wall, but the quality of the rotary spraying pile is difficult to guarantee, the rotary spraying pile and the continuous wall cannot be effectively connected, and meanwhile, a large amount of rotary spraying pile construction has great influence on the surrounding environment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the shortcoming that exists among the prior art, provide a simple structure, construction convenience quick and economic safety's diaphragm wall seam crossing prevention of seepage water structure.
In order to realize the purpose, the utility model discloses a technical scheme as follows:
a seepage-proofing structure at a joint of a continuous wall comprises a plurality of steel sheet piles and jet-grouting piles; the steel sheet piles are overlapped and inserted into one row at the outer side of the leakage point, and the formed area is enough to cover the leakage point; and arranging jet-grouting piles at the gaps between the steel sheet piles at the two end parts and the continuous wall, and grouting and reinforcing the gaps between the steel sheet piles at the other positions and the continuous wall.
Further, grouting reinforcement is carried out between the steel sheet piles and the continuous wall through sleeve valve pipes.
Furthermore, the number of each jet-grouting rotary pile is 1-2.
Furthermore, the Larsen steel sheet pile is selected as the steel sheet pile.
The technical scheme of the utility model, simple process, convenient operation not only can effectively solve conventional diaphragm wall seam percolating water and handle difficult, the not good problem of effect to the stagnant water of seam is effectual. Meanwhile, the steel sheet pile can be recycled, green construction is achieved, safety and economy are achieved, and the influence on the surrounding environment of the continuous wall is small.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
Reference is made to the accompanying drawings. The utility model discloses a plurality of steel sheet pile 1 and spout stake 2 soon, wherein steel sheet pile 1 preferred is U type Larsen steel sheet pile. The steel sheet piles 1 are inserted into one row in overlapping relation to each other outside the leakage points 3 and the formed area is enough to cover the leakage points 3, thereby covering the leakage points. And the spraying rotary piles 2 are arranged at the gaps between the steel sheet piles 1 at the two end parts and the continuous wall 4, and the number of the spraying rotary piles 2 at each position is 1-2. And the gap between the steel sheet pile 1 and the continuous wall 4 at the rest positions is reinforced by grouting through sleeve valve pipes 5.
It should be noted that the above describes exemplifying embodiments of the invention. However, it should be understood by those skilled in the art that the present invention is not limited to the above-described embodiments, which are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the scope of the present invention, and the changes and modifications are intended to fall within the scope of the present invention as claimed.

Claims (4)

1. A seepage-proofing structure at a joint of a continuous wall is characterized by comprising a plurality of steel sheet piles and jet-grouting piles; the steel sheet piles are overlapped and inserted into one row at the outer side of the leakage point, and the formed area is enough to cover the leakage point; and arranging the jet-grouting piles at the gaps between the steel sheet piles and the continuous walls at the two end parts, and grouting and reinforcing the gaps between the steel sheet piles and the continuous walls at the other positions.
2. The diaphragm wall joint watertight structure according to claim 1, wherein said steel sheet pile and said diaphragm wall are reinforced by grouting through sleeve valve pipes.
3. The watertight structure in a joint of a continuous wall according to claim 1, wherein the number of the jet-spun piles per joint is 1-2.
4. The diaphragm wall joint watertight structure according to claim 1, wherein said steel sheet pile is a larsen steel sheet pile.
CN201920900677.9U 2019-06-14 2019-06-14 Prevention of seepage water structure of diaphragm wall seam crossing Active CN210636449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920900677.9U CN210636449U (en) 2019-06-14 2019-06-14 Prevention of seepage water structure of diaphragm wall seam crossing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920900677.9U CN210636449U (en) 2019-06-14 2019-06-14 Prevention of seepage water structure of diaphragm wall seam crossing

Publications (1)

Publication Number Publication Date
CN210636449U true CN210636449U (en) 2020-05-29

Family

ID=70792174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920900677.9U Active CN210636449U (en) 2019-06-14 2019-06-14 Prevention of seepage water structure of diaphragm wall seam crossing

Country Status (1)

Country Link
CN (1) CN210636449U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851466A (en) * 2020-07-28 2020-10-30 中交二公局第四工程有限公司 Lap joint structure of two support systems in soft soil deep foundation pit and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851466A (en) * 2020-07-28 2020-10-30 中交二公局第四工程有限公司 Lap joint structure of two support systems in soft soil deep foundation pit and construction method

Similar Documents

Publication Publication Date Title
CN103882881B (en) Go deep into rock construction method under water
CN102900089B (en) With the combination piling bar cofferdam of hydro-expansive rubber waterproof fore shaft
CN104088295B (en) The embedded connecting structure of enclosure wall and middle plate and construction method thereof in covered back-digging
CN203835402U (en) Starting portal sealing structure of slurry shield tunnel
CN110864162B (en) Construction process of argillaceous sandstone geological pipe jacking
CN204080789U (en) The preparing structure of underground continuous wall width breach
CN108612111A (en) A kind of construction method of steel-pipe pile and foundation pit enclosure structure and foundation pit enclosure structure
CN108677926A (en) Coercion underground continuous wall and its construction method
CN210636449U (en) Prevention of seepage water structure of diaphragm wall seam crossing
CN208441084U (en) Coercion underground continuous wall
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN103276752A (en) Construction method of underground continuous wall expansive concrete joint
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN208870053U (en) A kind of deep-well retaining wall steel structure support
CN204456228U (en) A kind of diaphragm wall fast plugging device
CN106567397B (en) The control method and control device of deep basal pit underground water
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method
CN205369322U (en) A plugging device for handling bottom plate gushes water hole
CN210827422U (en) Peripheral shallow structure foundation reinforced structure that buries of deep basal pit
CN105442528B (en) A kind of cement injection sheet pile with sealing ring
CN211498907U (en) Waterproof curtain at end of underwater channel foundation pit along two sides of water
CN210288446U (en) Ultrathin ribbed waterproof curtain structure
CN209798790U (en) Diversion channel for alternating cofferdam construction in high-permeability sand layer
CN106013198A (en) Gap pretreatment construction method for foundation pit support structure
CN206800351U (en) A kind of Tailings Dam drains off floodwaters culvert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant