CN203835402U - Starting portal sealing structure of slurry shield tunnel - Google Patents
Starting portal sealing structure of slurry shield tunnel Download PDFInfo
- Publication number
- CN203835402U CN203835402U CN201420283433.8U CN201420283433U CN203835402U CN 203835402 U CN203835402 U CN 203835402U CN 201420283433 U CN201420283433 U CN 201420283433U CN 203835402 U CN203835402 U CN 203835402U
- Authority
- CN
- China
- Prior art keywords
- shield tunnel
- steel loop
- buried steel
- slurry shield
- portal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002002 slurry Substances 0.000 title claims abstract description 18
- 238000007789 sealing Methods 0.000 title abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 38
- 239000010959 steel Substances 0.000 claims abstract description 38
- 238000010276 construction Methods 0.000 claims description 20
- 239000003795 chemical substances by application Substances 0.000 claims description 13
- 230000007306 turnover Effects 0.000 claims description 7
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 4
- 239000004519 grease Substances 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 206010042674 Swelling Diseases 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000008961 swelling Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a starting portal sealing structure of a slurry shield tunnel. The starting portal sealing structure comprises a main body structure, an embedded steel ring buried in the main body structure, a curtain rubber plate connected to the embedded steel ring and at least two steel wire brushes; a grouting hole is formed in the embedded steel ring and located between the two steel wire brushes. Due to the adopted technical scheme, the starting portal sealing structure of the slurry shield tunnel has the advantages that the curtain rubber plate is used of preventing lots of water from rushing out, the two steel wire brushes are in seamless contact with a shield machine shell or a duct piece so as to prevent water seepage, and finally, the grouting hole is formed in the embedded steel ring and a grease is injected to the steel wire brushes to enhance the water plugging effect.
Description
Technical field
the utility model relates to a kind of slurry shield tunnel portal hermetically-sealed construction that starts.
Background technology
in shield launching process, for preventing that mud from pouring in active well in the space between portal circle and shield body, cannot build cabin or affect the stable of the shield machine work plane soil body, must before shield launching, at portal place, well behaved sealing device be set.
portal seal form can be divided into presser type and hinging type.Wherein hinging type is now extensively promoted.Folding paper portal sealing is constructed in two steps, and the first step is in the middle of main structure construction, to carry out the work of burying underground of the portal built-in fitting that starts, pay particular attention to be in the middle of burying process underground built-in fitting must with agent structure in reinforcing bar link together; Second step is before shield structure formally starts, and need first clear up portal dregs, then carries out the installation of portal sealing.
hermetically-sealed construction of the prior art, prevents that by cord rubber tile is set on the pre-buried steel loop being embedded in agent structure swelling from going out, and then sealing effectiveness is not ideal enough, easy spillage when shield machine passes through.
notification number is that the patent of invention of CN103266898A discloses a kind of shield tunnel portal sealing device and method, comprise inwall (being the agent structure described in the application), inwall is provided with pre-buried steel loop, pre-buried steel loop is provided with sealing steel ring, sealing steel ring is provided with twice waterproof construction, and twice waterproof construction is along sealing steel ring radial arrangement; On sealing steel ring, between twice waterproof construction, along even circumferential, have some greasings hole, described twice waterproof construction is respectively wire brush and cord rubber tile, cord rubber tile is arranged in the side near pre-buried steel loop, on described sealing steel ring, on the inner side of cord rubber tile and inwall, all has injected hole.This hermetically-sealed construction, only has wire brush one, and cord rubber tile and wire brush be all positioned at the outside of pre-buried steel loop, can not reach wire brush completely and contact with the seamless of shield machine shell or section of jurisdiction, so sealing effectiveness is also not ideal enough.
Summary of the invention
in order to address the above problem, the purpose of this utility model is to provide a kind of slurry shield tunnel portal hermetically-sealed construction that starts.
in order to reach above object, the technical solution adopted in the utility model is: a kind of slurry shield tunnel portal hermetically-sealed construction that starts, it comprises agent structure, be embedded in pre-buried steel loop in agent structure, be connected to cord rubber tile on pre-buried steel loop and twice wire brush at least, on pre-buried steel loop, offer injected hole, this injected hole is between twice wire brush.
further, injected hole has a plurality of and along the circumferencial direction setting of pre-buried steel loop.
further, twice wire brush is connected on the inwall of pre-buried steel loop.
further, cord rubber tile and a Circular Plate and a turnover panel are fixedly connected by bolt, and Circular Plate is fixedly connected on pre-buried steel loop.
further, in agent structure, also offer the first injected hole, the first injected hole and the injected hole formation grouting pipe that is connected.
owing to adopting technique scheme, the utility model slurry shield tunnel portal hermetically-sealed construction that starts, by cord rubber tile, prevent that a large amount of swellings from going out, the object of the seamless contact preventing infiltration of the realization of twice wire brush and shield machine shell or section of jurisdiction, finally, by default injected hole on pre-buried steel loop, on wire brush, inject grease and strengthen water plugging effect.
Accompanying drawing explanation
accompanying drawing 1 is the start superstructure schematic diagram of portal hermetically-sealed construction of the utility model slurry shield tunnel;
accompanying drawing 2 is the start substructure schematic diagram of portal hermetically-sealed construction of the utility model slurry shield tunnel.
number in the figure is:
1, agent structure; 2, pre-buried steel loop; 3, cord rubber tile; 4, wire brush; 5, injected hole; 6, Circular Plate; 7, the first injected hole; 8, turnover panel.
The specific embodiment
below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, thereby so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that, protection domain of the present utility model is made to more explicit defining.
from the structural representation of accompanying drawing 1 and accompanying drawing 2, can find out, the utility model provides the slurry shield tunnel portal hermetically-sealed construction that starts, it comprises agent structure 1, be embedded in pre-buried steel loop 2 in agent structure 1, be connected to cord rubber tile 3 on pre-buried steel loop 2 and twice wire brush 4 at least, on pre-buried steel loop 2, offer injected hole 5, this injected hole 5 is between twice wire brush 4.
cord rubber tile 3 and a Circular Plate 6 and a turnover panel 8 are fixedly connected by bolt, and Circular Plate 6 and turnover panel 8 lay respectively at the both sides of cord rubber tile 3, and Circular Plate 6 is fixedly connected on pre-buried steel loop 2.When shield launching seals by portal, the bending direction of cord rubber tile 3 and turnover panel 8 is consistent with the direction of propulsion of shield structure, contrary with the flow direction of water, sand or slurries, turnover panel 3 and cord rubber tile 8 just can bear the pressure that leakage produces like this, once there be water or the slurry stream door sealing of appearing just can play the effect of shutoff.
twice wire brush 4 is connected on the inwall of pre-buried steel loop 2, realizes and contacting with the seamless of shield machine shell or section of jurisdiction.
it is a plurality of and along the circumferencial direction setting of pre-buried steel loop 2 that injected hole 5 has.In agent structure 1, also offer a plurality of the first injected hole 7, the first injected holes 7 and the injected hole 5 formation grouting pipe that is connected.By inject grease on wire brush 4, strengthen water plugging effect.
above-described embodiment is only explanation technical conceive of the present utility model and feature, and its object is to allow person skilled in the art can understand content of the present utility model and implement according to this, can not limit protection domain of the present utility model with this.All equivalences of doing according to the utility model Spirit Essence change or modify, within all should being encompassed in protection domain of the present utility model.
Claims (5)
1. the slurry shield tunnel portal hermetically-sealed construction that starts, it is characterized in that: it comprises agent structure (1), be embedded in pre-buried steel loop (2) in described agent structure (1), be connected to cord rubber tile (3) on described pre-buried steel loop (2) and twice wire brush (4) at least, on described pre-buried steel loop (2), offer injected hole (5), this injected hole (5) is positioned between described twice wire brush (4).
2. the slurry shield tunnel according to claim 1 portal hermetically-sealed construction that starts, is characterized in that: described injected hole (5) has a plurality of and along the circumferencial direction setting of pre-buried steel loop (2).
3. the slurry shield tunnel according to claim 1 portal hermetically-sealed construction that starts, is characterized in that: described twice wire brush (4) is connected on the inwall of pre-buried steel loop (2).
4. the slurry shield tunnel according to claim 1 portal hermetically-sealed construction that starts, it is characterized in that: described cord rubber tile (3) is fixedly connected by bolt with a Circular Plate (6) and a turnover panel (8), and described Circular Plate (6) is fixedly connected on pre-buried steel loop (2).
5. the slurry shield tunnel according to claim 1 and 2 portal hermetically-sealed construction that starts, it is characterized in that: in described agent structure (1), also offer the first injected hole (7), described the first injected hole (7) and injected hole (5) the formation grouting pipe that is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420283433.8U CN203835402U (en) | 2014-05-29 | 2014-05-29 | Starting portal sealing structure of slurry shield tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420283433.8U CN203835402U (en) | 2014-05-29 | 2014-05-29 | Starting portal sealing structure of slurry shield tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203835402U true CN203835402U (en) | 2014-09-17 |
Family
ID=51513258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420283433.8U Expired - Lifetime CN203835402U (en) | 2014-05-29 | 2014-05-29 | Starting portal sealing structure of slurry shield tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203835402U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105065010A (en) * | 2015-07-16 | 2015-11-18 | 中交第二航务工程局有限公司 | Shield with-water receiving tunnel hole temporary sealing device and shield with-water receiving tunnel hole temporary sealing method |
CN105422127A (en) * | 2015-12-02 | 2016-03-23 | 中建三局第一建设工程有限责任公司 | Tunnel originating terminal reinforcing and sealing device and method |
CN106948829A (en) * | 2017-04-29 | 2017-07-14 | 中铁局集团有限公司 | A kind of slurry shield originates portal sealing structure and its construction method |
CN107165645A (en) * | 2017-07-24 | 2017-09-15 | 中铁隧道股份有限公司 | Major diameter slurry shield tunnel originates portal sealing device |
CN108150201A (en) * | 2017-12-29 | 2018-06-12 | 上海市机械施工集团有限公司 | Tunnel antipriming and construction method |
CN108643933A (en) * | 2018-04-27 | 2018-10-12 | 中铁十二局集团有限公司 | Shield receives portal reinforcement means |
CN109681229A (en) * | 2018-12-30 | 2019-04-26 | 中国铁建股份有限公司 | Tunnel sealing component |
CN111878110A (en) * | 2020-07-31 | 2020-11-03 | 中交隧道工程局有限公司 | Tunnel portal plugging device and method for shield tunnel starting |
CN111894607A (en) * | 2020-08-06 | 2020-11-06 | 中铁隆工程集团有限公司 | Method for installing brush-shaped sealing element of mechanical method connection channel tunneling machine |
CN111911172A (en) * | 2020-07-29 | 2020-11-10 | 中铁工程服务有限公司 | Novel pressure regulating self-sealing structure of shield originating receiving tunnel portal |
CN112211641A (en) * | 2020-11-03 | 2021-01-12 | 中建八局轨道交通建设有限公司 | Sealing structure of shield starting tunnel portal and construction method thereof |
-
2014
- 2014-05-29 CN CN201420283433.8U patent/CN203835402U/en not_active Expired - Lifetime
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105065010A (en) * | 2015-07-16 | 2015-11-18 | 中交第二航务工程局有限公司 | Shield with-water receiving tunnel hole temporary sealing device and shield with-water receiving tunnel hole temporary sealing method |
CN105422127A (en) * | 2015-12-02 | 2016-03-23 | 中建三局第一建设工程有限责任公司 | Tunnel originating terminal reinforcing and sealing device and method |
CN106948829A (en) * | 2017-04-29 | 2017-07-14 | 中铁局集团有限公司 | A kind of slurry shield originates portal sealing structure and its construction method |
CN107165645B (en) * | 2017-07-24 | 2023-08-15 | 中铁隧道股份有限公司 | Major diameter slurry shield tunnel starts entrance to a cave sealing device |
CN107165645A (en) * | 2017-07-24 | 2017-09-15 | 中铁隧道股份有限公司 | Major diameter slurry shield tunnel originates portal sealing device |
CN108150201A (en) * | 2017-12-29 | 2018-06-12 | 上海市机械施工集团有限公司 | Tunnel antipriming and construction method |
CN108643933A (en) * | 2018-04-27 | 2018-10-12 | 中铁十二局集团有限公司 | Shield receives portal reinforcement means |
CN109681229A (en) * | 2018-12-30 | 2019-04-26 | 中国铁建股份有限公司 | Tunnel sealing component |
CN111911172A (en) * | 2020-07-29 | 2020-11-10 | 中铁工程服务有限公司 | Novel pressure regulating self-sealing structure of shield originating receiving tunnel portal |
CN111911172B (en) * | 2020-07-29 | 2022-07-15 | 中铁工程服务有限公司 | Novel pressure regulating self-sealing structure of shield originating receiving tunnel portal |
CN111878110B (en) * | 2020-07-31 | 2022-06-10 | 中交隧道工程局有限公司 | Tunnel portal plugging device and method for shield tunnel starting |
CN111878110A (en) * | 2020-07-31 | 2020-11-03 | 中交隧道工程局有限公司 | Tunnel portal plugging device and method for shield tunnel starting |
CN111894607A (en) * | 2020-08-06 | 2020-11-06 | 中铁隆工程集团有限公司 | Method for installing brush-shaped sealing element of mechanical method connection channel tunneling machine |
CN112211641A (en) * | 2020-11-03 | 2021-01-12 | 中建八局轨道交通建设有限公司 | Sealing structure of shield starting tunnel portal and construction method thereof |
CN112211641B (en) * | 2020-11-03 | 2022-07-08 | 中建八局轨道交通建设有限公司 | Sealing structure of shield starting tunnel portal and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203835402U (en) | Starting portal sealing structure of slurry shield tunnel | |
CN103306683B (en) | A kind of construction method of comprehensive precipitation in hole when excavating deep tunnel | |
CN204343312U (en) | A kind of plugging device of precipitation well in foundation pit | |
CN102777189B (en) | A kind of ultra-long tube curtain non-relay jacking construction device and method | |
CN204984425U (en) | Shield tail seal assembly and shield construct machine | |
CN203145958U (en) | Tunnel double-layer duct piece ring structure | |
CN206487496U (en) | A kind of shield tunnel knocker anti-seep water structure | |
CN206916753U (en) | A kind of water sealing structure of diaphram wall and its seam crossing | |
CN207297011U (en) | A kind of water-rich sand layer slurry shield originates portal sealing device | |
CN205225271U (en) | Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid | |
CN204477513U (en) | A kind of push pipe starts portal water sealing structure | |
CN203924137U (en) | A kind of diaphragm wall serious leakage plugging structure | |
CN103437789B (en) | Build waterproof structure, adopt the method for water proof mode constructing underground building | |
CN203939060U (en) | The slight leakage plugging structure of a kind of diaphragm wall | |
CN203476340U (en) | Portal sealing device of slurry shield | |
CN203856484U (en) | Tunnel segment sealing structure | |
CN208203306U (en) | Tunnel antipriming | |
CN105220700A (en) | Foundation pit waterproof curtain reinforcement | |
CN206581941U (en) | A kind of slurry shield seals steel bushing initiator device | |
CN108150201A (en) | Tunnel antipriming and construction method | |
CN104912573A (en) | Gate temporary waterstop device of shield tunnel | |
CN105134223B (en) | A kind of construction method for improving shield launching steel case sealing | |
CN205206847U (en) | Shield constructs business turn over hole portal annular and freezes sealed sealing device | |
CN202370539U (en) | Front tunnel face excavated soil pre-reinforcing structure of tunnel | |
CN211285527U (en) | Combined water blocking structure of embedded pressure steel pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |