CN203703484U - Earth surface overflow drainage cover for buried natural gas pipeline - Google Patents

Earth surface overflow drainage cover for buried natural gas pipeline Download PDF

Info

Publication number
CN203703484U
CN203703484U CN201320824770.9U CN201320824770U CN203703484U CN 203703484 U CN203703484 U CN 203703484U CN 201320824770 U CN201320824770 U CN 201320824770U CN 203703484 U CN203703484 U CN 203703484U
Authority
CN
China
Prior art keywords
cover
jigsaw
rotating shaft
type
funnel cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320824770.9U
Other languages
Chinese (zh)
Inventor
姜修才
王瑞利
王鑫
周若厅
陈社鹏
马万飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical China National Petroleum Corp
Priority to CN201320824770.9U priority Critical patent/CN203703484U/en
Application granted granted Critical
Publication of CN203703484U publication Critical patent/CN203703484U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses an earth surface overflow drainage cover for a buried natural gas pipeline, and belongs to the technical field of oil-gas storage and transportation as well as safe operation. A middle gas guide spliced plate consists of a V-shaped funnel cover, a sled type middle main plate, rotating shaft sleeves, pre-assembled hinge shafts and auxiliary tongs; the V-shaped funnel cover is provided with a hollow funnel cavity; the upper part of the V-shaped funnel cover is sleeved with an air distribution and gas guide pipe; the lower part of the V-shaped funnel cover is integrally welded with the sled type middle main plate; two ends of the sled type middle main plate are provided with curled arc warpings; a hole in the middle part of the sled type middle main plate is matched with the lower end of the V-shaped funnel cover; the rotating shaft sleeves and the pre-assembled hinge shafts are combined to form six sets which are uniformly arranged on two sides of the middle gas guide spliced plate; the auxiliary tongs are welded to the middle parts of two ends of the middle gas guide spliced plate. When the buried natural gas pipeline leaks gas, the drainage cover device is arranged at an earth surface overflow position in time, so that damage, caused by overflowing gas due to a fact that the conventional pipeline cannot stop transportation and reduce the pressure in time, to the surrounding environment, entering of rescue personnel and rescue equipment, digging work and the like is avoided.

Description

The excessive drainage hood in a kind of buried natural gas line earth's surface
Technical field
The utility model relates to the excessive drainage hood in a kind of buried natural gas line earth's surface, belongs to Oil & Gas Storage safe operation technical field.
Background technique
The buried natural gas line leaking as early as possible stopping transportation step-down is very necessary for repairing, so just can not cause leakage point earth's surface rock gas to fill the air in a large number, and surrounding environment is marched into the arena and brought potential safety hazard with the personnel of speedily carrying out rescue work.And, only have exposed pipeline to be just convenient to rush to repair operation, make the natural gas line of buried leakage expose earth's surface, all very large of the Security of excavation, complexity.But reality is but due to every aspect, if occur suddenly to leak to destroy at the pipeline of operation, be difficult to stopping transportation step-down at once, this just makes near rock gas harm leakage point sharply raise.If can, by the rock gas carrying-off isolation of this part leakage, will put earth's surface environment around to pipe leakage so, and follow-up repairing excavation, personnel are frequent etc. that very large support is provided.Therefore, researching and developing excessive drainage system for the buried natural gas line leaking, to reaching most leakage rock gas carrying-offs, create necessary condition for pipe leakage accident treatment, is a problem that is worth further investigation.
Summary of the invention
In order to overcome the deficiencies in the prior art, the utility model provides a kind of buried natural gas line earth's surface excessive drainage hood, while solving buried natural gas line generation leakage, how by see through the inflammable gass such as the excessive methane in earth's surface of buried soil layer as early as possible drainage walk the problem so that digging in-situ, repair personnel are marched into the arena etc. fast.
The excessive drainage hood in a kind of buried natural gas line earth's surface, middle bleed jigsaw is made up of mainboard, rotating shaft cover, prepackage hinging shaft and auxiliary handgrip in V-type funnel cover, Sledge type; V-type funnel cover band hollow funnel chamber, V-type funnel cover top socket cloth wind air entraining pipe, in V-type funnel cover bottom and Sledge type, mainboard is welded; In Sledge type, there is the arc warpage twisting at mainboard two ends, and in Sledge type, mainboard middle part hole and V-type funnel cover lower end match; Rotating shaft cover is combined into six covers with prepackage hinging shaft and is evenly arranged in middle bleed jigsaw both sides; Middle part, bleed jigsaw two ends in the middle of auxiliary handgrip is welded in; Left and right expansion jigsaw is made up of left and right wing plate and rotating shaft cover; Left and right wing plate profile is band major axis semiellipse and long rectangle combination; Rotating shaft cover is corresponding with the rotating shaft cover dislocation on middle bleed jigsaw, is fixedly welded on the long straight flange of left and right wing plate; Under cloth wind air entraining pipe, be terminated at the osculum end of V-type funnel cover; Cloth wind air entraining pipe communicates with leaking analog channel, leaks analog channel and communicates with buried natural gas line.
A using method for the excessive drainage hood in buried natural gas line earth's surface, contains following steps;
First cloth wind air entraining pipe is raised to high-altitude by assistance for lifting lever arrangement, makes air entraining pipe produce atm difference up and down and there is nature suction; Pull lid and be pressed onto excessive gas top being hinged to overall bleed jigsaw and left and right expansion jigsaw again, under the excessive pressure of excessive gas itself and the draught head acting in conjunction of the different generations of the upper and lower rarefaction of air degree of air entraining pipe, realize the excessive inflammable gas of the carrying-off earth's surface overwhelming majority; Simultaneously by manually earthing compacting suitably being done in jigsaw top.
Excessive like this gas, by the excessive pressure of itself and the suction of air entraining pipe, has just been directed into high-altitude, has reduced near the combustable gas concentration in earth's surface, has realized drainage target, for condition has been created in follow-up processing.
The beneficial effects of the utility model are: when buried natural gas line occurs to leak, by timely drainage hood device being covered in to excessive place, earth's surface, solve the harm that excessive gas that pipeline stopping transportation step-down in time produces is marched into the arena to surrounding environment, the personnel equipment of speedily carrying out rescue work and excavated operation etc.The application of the excessive drainage hood in earth's surface, the response efficiency by riser tubing operation maintenance business scope to accident, is the important supplementary equipment of pipe first-aid accident treatment, therefore, the excessive drainage hood in buried rock gas earth's surface will have good application prospect.
Brief description of the drawings
When considered in conjunction with the accompanying drawings, by the detailed description with reference to below, can more completely understand better the utility model and easily learn wherein many advantages of following, but accompanying drawing described herein is used to provide further understanding of the present utility model, form a part of the present utility model, schematic description and description of the present utility model is used for explaining the utility model, do not form improper restriction of the present utility model, as schemed wherein:
Fig. 1 is mounting structure schematic diagram of the present utility model.
Fig. 2 is structural representation of the present utility model.
Fig. 3 is middle bleed jigsaw structural representation of the present utility model.
Fig. 4 is left and right expansion jigsaw structural representation of the present utility model.
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Embodiment
Obviously the many modifications and variations that, those skilled in the art do based on aim of the present utility model belong to protection domain of the present utility model.
Embodiment 1: as shown in Figure 1, Figure 2, Figure 3 and Figure 4, and the excessive drainage hood in a kind of buried natural gas line earth's surface, middle bleed jigsaw 1, left and right expansion jigsaw 2, cloth wind air entraining pipe 3.
Middle bleed jigsaw 1 is made up of mainboard 5, rotating shaft cover 6, prepackage hinging shaft 7 and auxiliary handgrip 8 in V-type funnel cover 4, Sledge type.V-type funnel cover 4 aluminium sheet materials, band hollow funnel chamber, V-type funnel cover 4 top socket cloth wind air entraining pipes 3, in V-type funnel cover 4 bottoms and Sledge type, mainboard 5 is welded; In Sledge type, there is the arc warpage twisting at mainboard 5 two ends, and facilitate earth's surface to slide, and in Sledge type, mainboard 5 middle part holes and V-type funnel cover 4 lower ends match; Rotating shaft cover 6 is combined into six covers with prepackage hinging shaft 7 and is evenly arranged in middle bleed jigsaw 1 both sides, waits until pairing; Assist handgrip 8 to be welded in middle bleed jigsaw 1 middle part, two ends, be beneficial to personnel's lift to move, can be used for again rope far-end and pull the slip of drive drainage hood entirety.
Expansion jigsaw 2 in left and right is made up of left and right wing plate 9 and rotating shaft cover 10.Left and right wing plate 9 is aluminium sheet material, and profile is band major axis semiellipse and long rectangle combination; Rotating shaft cover 10 is corresponding with rotating shaft cover 6 dislocation on middle bleed jigsaw 1, is fixedly welded on the long straight flange of left and right wing plate.
In the time not applying, folding two wing plates dwindle space, are convenient to transport, launch to be jointly combined into nearly square cover plate with middle bleed jigsaw 1 when on-the-spot application, are covered to the excessive earth's surface of gas place, and top can be aided with hack compacting.
Cloth wind air entraining pipe 3 adopts commercially available finished product flame-retardant fiber wind-distributing pipe, in the time of application, be aided with lifting bar its one end is risen to high vacancy, cloth wind air entraining pipe is terminated at the osculum end of V-type funnel cover 4 for 3 times, under the excessive pressure of excessive gas itself and the draught head acting in conjunction of the different generations of the upper and lower rarefaction of air degree of air entraining pipe, realize the excessive inflammable gas of the carrying-off earth's surface overwhelming majority.
Cloth wind air entraining pipe 3 communicates with revealing analog channel 11, reveals analog channel 11 and communicates with buried natural gas line 12.
The design invention of the excessive drainage hood in buried natural gas line earth's surface, its outstanding innovation is to comprise following several respects:
1). middle bleed jigsaw be convenient to pull sliding motion structure form: have in the Sledge type of the arc warpage that twists mainboard taking two ends as sliding body,, personnel excessive at excessive inflammable gas cannot be closely near time, be aided with rope bolt and drag auxiliary handgrip and can overcome easily that earth's surface is unequal stumbles, drainage hood is pulled and be placed on excessive leakage point at a distance;
2). the folding both wings structure choice of left and right expansion jigsaw: profile is more aobvious round and smooth with long rectangle combination with band major axis semiellipse, reduces placement space when folding, is convenient to lifting, transport, increases area coverage, expands bleed scope when expansion;
3). the material of parts is selected to arrange: middle bleed jigsaw and the left and right main material of expansion jigsaw, taking lightweight aluminium sheet as main, have reduced the overall weight of equipment, are convenient to transport and manual operation; Cloth wind air entraining pipe is selected commercially available finished product flame-retardant fiber wind-distributing pipe, and lightweight, inexpensive, has avoided redesign.
Middle bleed jigsaw be convenient to pull sliding motion structure form: have in the Sledge type of the arc warpage that twists mainboard taking two ends as sliding body, be convenient to be aided with rope bolt and drag auxiliary handgrip and pull, overcome earth's surface injustice, stumble etc.
The special part of folding both wings structural form selection of left and right expansion jigsaw is: profile is more aobvious round and smooth with long rectangle combination with band major axis semiellipse, reduces placement space when folding, is convenient to lifting, transport, increases area coverage, expands bleed scope when expansion.
The material of parts is selected that special part is set and is: middle bleed jigsaw and the left and right main material of expansion jigsaw, taking lightweight aluminium sheet as main, have reduced the overall weight of equipment, are convenient to transport and manual operation; Cloth wind air entraining pipe is selected commercially available finished product flame-retardant fiber wind-distributing pipe, and lightweight, inexpensive, has avoided redesign.
As mentioned above, embodiment of the present utility model is explained, but as long as not departing from fact inventive point of the present utility model and effect can have a lot of distortion, this will be readily apparent to persons skilled in the art.Therefore, within such variation is also all included in protection domain of the present utility model.

Claims (1)

1. the excessive drainage hood in buried natural gas line earth's surface, in the middle of it is characterized in that, bleed jigsaw is made up of mainboard, rotating shaft cover, prepackage hinging shaft and auxiliary handgrip in V-type funnel cover, Sledge type; V-type funnel cover band hollow funnel chamber, V-type funnel cover top socket cloth wind air entraining pipe, in V-type funnel cover bottom and Sledge type, mainboard is welded; In Sledge type, there is the arc warpage twisting at mainboard two ends, and in Sledge type, mainboard middle part hole and V-type funnel cover lower end match; Rotating shaft cover is combined into six covers with prepackage hinging shaft and is evenly arranged in middle bleed jigsaw both sides; Middle part, bleed jigsaw two ends in the middle of auxiliary handgrip is welded in; Left and right expansion jigsaw is made up of left and right wing plate and rotating shaft cover; Left and right wing plate profile is band major axis semiellipse and long rectangle combination; Rotating shaft cover is corresponding with the rotating shaft cover dislocation on middle bleed jigsaw, is fixedly welded on the long straight flange of left and right wing plate; Under cloth wind air entraining pipe, be terminated at the osculum end of V-type funnel cover; Cloth wind air entraining pipe communicates with leaking analog channel, leaks analog channel and communicates with buried natural gas line.
CN201320824770.9U 2013-12-13 2013-12-13 Earth surface overflow drainage cover for buried natural gas pipeline Expired - Fee Related CN203703484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320824770.9U CN203703484U (en) 2013-12-13 2013-12-13 Earth surface overflow drainage cover for buried natural gas pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320824770.9U CN203703484U (en) 2013-12-13 2013-12-13 Earth surface overflow drainage cover for buried natural gas pipeline

Publications (1)

Publication Number Publication Date
CN203703484U true CN203703484U (en) 2014-07-09

Family

ID=51053929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320824770.9U Expired - Fee Related CN203703484U (en) 2013-12-13 2013-12-13 Earth surface overflow drainage cover for buried natural gas pipeline

Country Status (1)

Country Link
CN (1) CN203703484U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712874A (en) * 2013-12-13 2015-06-17 中国石油天然气集团公司 Buried natural gas pipeline earth-surface overflowing drainage cover and application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712874A (en) * 2013-12-13 2015-06-17 中国石油天然气集团公司 Buried natural gas pipeline earth-surface overflowing drainage cover and application method

Similar Documents

Publication Publication Date Title
CN103572987B (en) For the elevating stage of aquacade
CN207062716U (en) A kind of GSZ installation aiding device of road construction
CN204917742U (en) Portable portal crane is used in piping erection
WO2021017326A1 (en) Flexible film vertical laying device
CN203703484U (en) Earth surface overflow drainage cover for buried natural gas pipeline
CN104712874A (en) Buried natural gas pipeline earth-surface overflowing drainage cover and application method
CN206158656U (en) Working device is pressed in area
CN109780324B (en) Thermal pipeline laying equipment
CN205442567U (en) Steel -pipe pole operation platform
CN208057080U (en) A kind of controllable apparatus for work of no killing well
CN206800470U (en) A kind of electrodynamic type automatic lifting inspection well cover
CN207018706U (en) Four-way for roof vent pipe crosses attachment means
CN203288151U (en) Small practical oil drilling teaching drilling rig
CN209179731U (en) A kind of failure oil well oil conduit inside crude oil fishing device
CN204162350U (en) Electric power cover plate hydraulic hanging device
CN104261035A (en) Cable trench cover plate removing and placing tool
CN211951871U (en) Guide device for trenchless repair of pipeline by thermoplastic forming method
CN204475923U (en) Between Power Transformer in Field maintenance
CN209494144U (en) Waterproof roll laying apparatus
CN204184809U (en) Cable channel cover plate works the instrument of putting
RU97795U1 (en) DEVICE FOR REPAIR OF A LINEAR PLOT OF A PIPELINE ON WEAKLY BEARING SOILS
CN105971012A (en) Prefabricated pipe gallery
RU2465432C2 (en) Self-contained oiler for analysis of oil and gas wells
CN206053355U (en) A kind of tower concrete spreader
CN206438561U (en) Integrated prefabricated pumping plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170406

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee after: China National Petroleum Corp.

Patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Address before: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee before: China National Petroleum Corp.

Patentee before: CHINA PETROLEUM PIPELINE BUREAU

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20211213