CN206158656U - A pressure working device - Google Patents
A pressure working device Download PDFInfo
- Publication number
- CN206158656U CN206158656U CN201621073204.9U CN201621073204U CN206158656U CN 206158656 U CN206158656 U CN 206158656U CN 201621073204 U CN201621073204 U CN 201621073204U CN 206158656 U CN206158656 U CN 206158656U
- Authority
- CN
- China
- Prior art keywords
- blowout preventer
- slips
- ram
- slip
- pump rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Catching Or Destruction (AREA)
Abstract
本实用新型公开了一种带压作业装置,包括四闸板防喷器、环形防喷器、升降油缸、第一横梁、万能卡瓦和泵杆防喷卡瓦,其中,四闸板防喷器固定于井口,上部与环形防喷器下部连接,环形防喷器位于第一横梁下方;万能卡瓦上部与泵杆防喷卡瓦下部连接,下部与第一横梁的上部连接;升降油缸上部与第一横梁下部连接,第一横梁上设置有适于油管和抽油杆通过的开孔,升降油缸可控制第一横梁的上升和下降;四闸板防喷器包括油管卡瓦、半封闸板、泵杆卡瓦及全封闸板;环形防喷器内部设置有丁腈橡胶芯;起下抽油杆时使用泵杆防喷卡瓦固定抽油杆,起下油管时使用万能卡瓦固定油管。本实用新型提供的带压作业装置,不需两套装置倒换,就可起下抽油杆和油管。
The utility model discloses a pressurized operation device, which comprises a four-ram blowout preventer, an annular blowout preventer, a lifting oil cylinder, a first beam, a universal slip and a pump rod anti-spray slip, wherein the four-ram blowout preventer The device is fixed at the wellhead, the upper part is connected with the lower part of the annular blowout preventer, and the annular preventer is located under the first beam; the upper part of the universal slip is connected with the lower part of the pump rod blowout preventer slip, and the lower part is connected with the upper part of the first beam; the upper part of the lifting cylinder It is connected with the lower part of the first crossbeam, and the first crossbeam is provided with an opening suitable for the passage of oil pipes and sucker rods, and the lifting cylinder can control the rise and fall of the first crossbeam; the four-ram preventer includes oil pipe slips, half-sealed Ram, pump rod slips and full-sealed ram; ring blowout preventer is equipped with nitrile rubber core inside; pump rod anti-blowout slips are used to fix the sucker rod when lifting and lowering the sucker rod, and universal card is used when raising and lowering the oil pipe The tile fixes the tubing. The pressurized operation device provided by the utility model can raise and lower the sucker rod and the oil pipe without switching the two sets of devices.
Description
技术领域technical field
本实用新型涉及油气开采技术领域,特别涉及一种带压作业装置。The utility model relates to the technical field of oil and gas exploitation, in particular to a device for working with pressure.
背景技术Background technique
带压作业是指在井筒内有压力的情况下不放喷、不压井,通过与常规作业车等设备配合进行起下管柱作业的一种作业方法,可在作业过程中控制井口压力从而有效地防止井喷事故的发生,实现安全作业。随着油田开发的不断深入,油层保护的重要性愈加凸显,同时井控安全和环境保护的要求也越来越高,利用带压作业技术可以很好地解决油层保护与井控安全、环境保护之间的矛盾。Snubbing operation refers to an operation method in which there is pressure in the wellbore without blowout or snubbing, and by cooperating with conventional operation vehicles and other equipment to carry out pipe string operation, the wellhead pressure can be controlled during the operation so that Effectively prevent blowout accidents and realize safe operation. With the deepening of oilfield development, the importance of oil layer protection has become more and more prominent. At the same time, the requirements for well control safety and environmental protection have become higher and higher. The use of snubbing operation technology can well solve the problems of oil layer protection, well control safety, and environmental protection. the contradiction between.
目前国内大多数油井主要采用注水井带压作业装置进行带压作业,来起下抽油杆和油管。At present, most of the oil wells in China mainly use the water injection well snubbing device to carry out snubbing operations to lift and lower sucker rods and oil pipes.
在实现本实用新型的过程中,本实用新型人发现现有技术中至少存在以下问题:In the process of realizing the utility model, the inventor of the utility model has found that there are at least the following problems in the prior art:
利用注水井带压作业设备对油井进行带压作业时,因油井内有抽油杆,需要先安装抽油杆带压作业装置提出抽油杆,再安装油管带压作业装置提出油管,这种作业方法麻烦,需两套装置倒换,因而作业成本增高,难以满足复杂带压作业工艺需要。When using water injection well snubbing equipment to carry out snubbing operations on oil wells, because there are sucker rods in the oil well, it is necessary to install the sucker rod snubbing device to lift the sucker rod first, and then install the tubing snubbing device to lift the tubing. The operation method is cumbersome, and two sets of devices need to be switched, so the operation cost is increased, and it is difficult to meet the technical requirements of complex hot-pressing operation.
实用新型内容Utility model content
有鉴于此,本实用新型提供一种带压作业装置,以解决现有带压作业装置起下抽油杆和油管时需要两套装置倒换的问题。In view of this, the utility model provides a hot working device to solve the problem that two sets of devices need to be switched when the existing hot working device lifts and lowers the sucker rod and the oil pipe.
具体而言,包括以下的技术方案:Specifically, the following technical solutions are included:
一种带压作业装置,包括四闸板防喷器、环形防喷器、升降油缸、第一横梁、万能卡瓦和泵杆防喷卡瓦,其中,A device for working under pressure, including a four-ram blowout preventer, an annular blowout preventer, a lifting cylinder, a first beam, universal slips and pump rod blowout preventer slips, wherein,
所述四闸板防喷器固定于井口,上部适于与所述环形防喷器的下部连接,所述环形防喷器位于所述第一横梁的下方;The four-ram blowout preventer is fixed at the wellhead, the upper part is suitable for connecting with the lower part of the annular blowout preventer, and the annular blowout preventer is located below the first beam;
所述万能卡瓦的上部适于与所述泵杆防喷卡瓦的下部连接,所述万能卡瓦的下部适于与所述第一横梁的上部连接;The upper part of the universal slip is suitable for connecting with the lower part of the pump rod anti-spray slip, and the lower part of the universal slip is suitable for connecting with the upper part of the first beam;
所述升降油缸的上部适于与所述第一横梁的下部连接,所述第一横梁上设置有适于油管和抽油杆通过的开孔,所述升降油缸适于通过升降来控制所述第一横梁的上升和下降;The upper part of the lifting cylinder is adapted to be connected with the lower part of the first beam, and the first beam is provided with openings suitable for passage of oil pipes and sucker rods, and the lifting cylinder is suitable for controlling the The raising and lowering of the first beam;
所述四闸板防喷器包括油管卡瓦、半封闸板、泵杆卡瓦及全封闸板,所述油管卡瓦适于固定所述油管,所述泵杆卡瓦适于固定所述抽油杆;The four-ram blowout preventer includes oil pipe slips, semi-sealed rams, pump rod slips and fully sealed rams, the oil pipe slips are suitable for fixing the oil pipes, the pump rod slips are suitable for fixing the said sucker rod;
所述环形防喷器内部设置有丁腈橡胶芯;A nitrile rubber core is arranged inside the annular blowout preventer;
起下所述抽油杆时使用所述泵杆防喷卡瓦固定所述抽油杆,起下所述油管时卸掉所述泵杆防喷卡瓦,使用所述万能卡瓦固定所述油管。Use the pump rod anti-spray slips to fix the sucker rod when lifting and lowering the sucker rod, remove the pump rod anti-spray slips when lifting and lowering the oil pipe, and use the universal slips to fix the tubing.
可选择地,所述带压作业装置还包括四通,所述四通的上出口适于与所述环形防喷器的下部连接,所述四通的下出口适于与所述四闸板防喷器的上部连接。Optionally, the pressurized working device further includes a four-way, the upper outlet of the four-way is suitable for connecting with the lower part of the annular blowout preventer, and the lower outlet of the four-way is suitable for connecting with the four rams The upper connection of the blowout preventer.
可选择地,所述带压作业装置还包括手动球阀,所述手动球阀适于与所述四通的侧出口连接。Optionally, the pressurized working device further includes a manual ball valve, and the manual ball valve is adapted to be connected with the side outlet of the four-way.
可选择地,所述带压作业装置还包括筒形防喷器,所述筒形防喷器位于所述第一横梁的下方,所述筒形防喷器的下部适于与所述环形防喷器的上部连接。Optionally, the pressurized working device further includes a cylindrical blowout preventer, the cylindrical blowout preventer is located below the first beam, and the lower part of the cylindrical blowout preventer is suitable for connecting with the annular blowout preventer. The upper connection of the injector.
可选择地,所述带压作业装置还包括高压自封,所述高压自封位于所述第一横梁的下方,所述高压自封的下部适于与所述环形防喷器的上部连接。Optionally, the hot working device further includes a high-pressure self-sealing, the high-pressure self-sealing is located below the first beam, and the lower part of the high-pressure self-sealing is suitable for connecting with the upper part of the annular blowout preventer.
可选择地,所述筒形防喷器内部设置有丁腈橡胶芯。Optionally, a nitrile rubber core is arranged inside the cylindrical blowout preventer.
可选择地,所述高压自封内部设置有丁腈橡胶芯。Optionally, a nitrile rubber core is arranged inside the high-pressure self-sealing.
可选择地,所述四闸板防喷器的所述泵杆卡瓦及所述油管卡瓦和所述万能卡瓦的卡瓦牙均为“V”型,所述泵杆防喷卡瓦的闸板卡瓦的卡瓦牙为倒“Y”型。Optionally, the pump rod slips, the tubing slips, and the universal slips of the four-ram blowout preventer have "V"-shaped slip teeth, and the pump rod blowout preventer slips The slip teeth of the ram slips are inverted "Y" shape.
可选择地,所述带压作业装置还包括第二横梁,所述第二横梁的上部适于与所述四闸板防喷器的下部连接,所述第二横梁固定于所述井口。Optionally, the snubbing device further includes a second beam, the upper part of the second beam is adapted to be connected with the lower part of the four-ram blowout preventer, and the second beam is fixed to the wellhead.
可选择地,所述带压作业装置还包括工作平台,所述工作平台适于与所述升降油缸连接。Optionally, the pressurized working device further includes a working platform, and the working platform is adapted to be connected with the lifting cylinder.
本实用新型实施例提供的技术方案的有益效果是:The beneficial effect of the technical scheme that the utility model embodiment provides is:
使用本实用新型提供的带压作业装置在起抽油杆和油管时,当井内压力对抽油杆/油管上浮力小于抽油杆/油管的重量时,采用四闸板防喷器的半封闸板封闭井口环形空间,采用环形防喷器密封抽油杆/油管,利用外部辅助设备将抽油杆/油管提出;当井内压力对抽油杆/油管上浮力大于抽油杆/油管的重量时,采用四闸板防喷器的半封闸板封闭井口环形空间,采用环形防喷器密封抽油杆/油管,利用升降油缸和泵杆防喷卡瓦/万能卡瓦配合将抽油杆/油管提出。当出现井口溢流,环形防喷器的丁腈橡胶芯对抽油杆或油管的摩擦力不足以克服井内压力对抽油杆或油管的上浮力时,抽油杆、油管上窜,这种情况下可采用四闸板防喷器的泵杆卡瓦固定抽油杆,或者采用油管卡瓦固定油管,采用放压或实施压井措施后再利用升降油缸和泵杆防喷卡瓦/万能卡瓦配合将抽油杆/油管提出。When using the pressurized operation device provided by the utility model to lift the sucker rod and tubing, when the buoyancy of the pressure in the well on the sucker rod/tubing is less than the weight of the sucker rod/tubing, the semi-sealed blowout preventer with four rams is used. The ram seals the annular space of the wellhead, adopts the annular blowout preventer to seal the sucker rod/tubing, and uses the external auxiliary equipment to lift the sucker rod/tubing; when the pressure in the well is greater than the weight of the sucker rod/tubing on the buoyancy At the same time, the semi-closed ram of the four-ram blowout preventer is used to seal the annular space of the wellhead, and the annular blowout preventer is used to seal the sucker rod/tubing pipe, and the sucker rod /tubing raised. When the wellhead overflows, the friction force of the nitrile rubber core of the annular blowout preventer on the sucker rod or tubing is not enough to overcome the buoyancy of the well pressure on the sucker rod or tubing, and the sucker rod and tubing go up. In some cases, the pump rod slips of the four-ram blowout preventer can be used to fix the sucker rod, or the tubing slips can be used to fix the tubing, and the lifting cylinder and the pump rod blowout preventer slips/universal can be used after pressure relief or well killing measures are taken. Slips cooperate to lift the sucker rod/tubing.
使用本实用新型提供的带压作业装置下抽油杆和油管时,当井内压力对抽油杆/油管上浮力小于抽油杆/油管的重量时,采用四闸板防喷器的半封闸板封闭井口环形空间,采用环形防喷器密封抽油杆/油管,利用外部辅助设备将抽油杆/油管下入井内;当井内压力对抽油杆/油管上浮力大于抽油杆/油管的重量时,采用四闸板防喷器的半封闸板封闭井口环形空间,采用环形防喷器密封抽油杆/油管,利用升降油缸和泵杆防喷卡瓦/万能卡瓦配合将抽油杆/油管下入井内。当出现井口溢流,环形防喷器的丁腈橡胶芯对抽油杆或油管的摩擦力不足以克服井内压力对抽油杆或油管的上浮力时,抽油杆、油管上窜,这种情况下可采用四闸板防喷器的泵杆卡瓦固定抽油杆,或者油管卡瓦固定油管,之后采用放压或实施压井措施后再利用升降油缸和泵杆防喷卡瓦/万能卡瓦配合将抽油杆/油管下入井内;当井内没有管柱时,采用四闸板防喷器的全封闸板密封井口。When using the sucker rod and tubing provided by the utility model to lower the sucker rod and tubing, when the buoyancy of the well pressure on the sucker rod/tubing is less than the weight of the sucker rod/tubing, the semi-sealed sluice of the four-ram blowout preventer is used The plate seals the annular space of the wellhead, adopts the annular blowout preventer to seal the sucker rod/tubing, and uses external auxiliary equipment to lower the sucker rod/tubing into the well; when the pressure in the well is greater than the buoyancy of the sucker rod/tubing When weighing the weight, the semi-sealed ram of the four-ram preventer is used to seal the annular space of the wellhead, and the ring-shaped preventer is used to seal the sucker rod/oil pipe, and the pumping cylinder is pumped by the combination of the lifting cylinder and the pump rod blowout slip/universal slip. The rod/tubing is lowered into the well. When the wellhead overflows, the friction force of the nitrile rubber core of the annular blowout preventer on the sucker rod or tubing is not enough to overcome the buoyancy of the well pressure on the sucker rod or tubing, and the sucker rod and tubing go up. In some cases, the pump rod slips of the four-ram blowout preventer can be used to fix the sucker rod, or the tubing slips can be used to fix the tubing, and then the lifting cylinder and the pump rod blowout preventer slips/universal can be used to release pressure or implement well killing measures Slips cooperate to lower the sucker rod/tubing pipe into the well; when there is no pipe string in the well, the fully-sealed ram of the four-ram blowout preventer is used to seal the wellhead.
本实用新型提供的带压作业装置,为抽油杆和油管一体化带压作业装置,可起下抽油杆和油管,不需要两套带压作业装置来回倒换,简化了带压作业工艺。The snubbing device provided by the utility model is an integrated snubbing device of the sucker rod and the tubing, which can lift and lower the sucker rod and the tubing without switching back and forth between two sets of snubbing devices, which simplifies the snubbing process.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some implementations of the present invention. For example, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.
图1为根据本实用新型一实施例提供的带压作业装置起下抽油杆时的结构示意图;Fig. 1 is a structural schematic diagram of a sucker rod being lifted and lowered by a working device under pressure according to an embodiment of the present invention;
图2为根据本实用新型一实施例提供的带压作业装置起下油管时的结构示意图;Fig. 2 is a structural schematic diagram of the under pressure working device provided according to an embodiment of the present invention when lifting and lowering the oil pipe;
图3为根据本实用新型一实施例提供的四闸板防喷器的结构示意图;Fig. 3 is a schematic structural view of a four-ram blowout preventer provided according to an embodiment of the present invention;
图4为根据本实用新型一实施例提供的环形防喷器的结构示意图;Fig. 4 is a schematic structural view of an annular blowout preventer provided according to an embodiment of the present invention;
图5为根据本实用新型一实施例提供的高压自封的结构示意图;Fig. 5 is a schematic structural diagram of a high-pressure self-sealing provided according to an embodiment of the present invention;
图6为根据本实用新型一实施例提供的筒形防喷器的结构示意图;Fig. 6 is a schematic structural view of a cylindrical blowout preventer provided according to an embodiment of the present invention;
图7为根据本实用新型一实施例提供的泵杆防喷卡瓦的结构示意图。Fig. 7 is a schematic structural view of a pump rod blowout prevention slip provided according to an embodiment of the present invention.
图中的附图标记分别表示:The reference signs in the figure represent respectively:
1、四闸板防喷器;2、四通;3、环形防喷器;4、升降油缸;5、第一横梁;6、工作平台;7、万能卡瓦;8、第二横梁;9、筒形防喷器;10、高压自封;11、泵杆防喷卡瓦;12、旋转法兰;13、油管卡瓦;14、半封闸板;15、泵杆卡瓦;16、全封闸板;17、环形防喷器的丁腈橡胶芯;18、高压自封的丁腈橡胶芯;19、筒形防喷器的丁腈橡胶芯;20、泵杆防喷卡瓦的闸板卡瓦。1. Four ram BOP; 2. Four-way; 3. Annular BOP; 4. Lift cylinder; 5. First beam; 6. Working platform; 7. Universal slips; 8. Second beam; 9 , cylindrical blowout preventer; 10, high pressure self-sealing; 11, pump rod anti-spray slip; 12, rotating flange; 13, tubing slip; 14, semi-sealed ram; 15, pump rod slip; Sealing ram; 17. Nitrile rubber core of annular blowout preventer; 18. High pressure self-sealing nitrile rubber core; 19. Nitrile rubber core of cylindrical blowout preventer; 20. Ram of pump rod blowout prevention slip kava.
具体实施方式detailed description
为使本实用新型的技术方案和优点更加清楚,下面将结合附图对本实用新型实施方式作进一步地详细描述。In order to make the technical solutions and advantages of the present utility model clearer, the implementation of the present utility model will be further described in detail below in conjunction with the accompanying drawings.
本实用新型一实施例提供一种带压作业装置,如图1或2所示,包括四闸板防喷器1、环形防喷器3、升降油缸4、第一横梁5、万能卡瓦7和泵杆防喷卡瓦11,其中,四闸板防喷器1固定于井口,上部适于与环形防喷器3的下部连接,环形防喷器3位于第一横梁5的下方;万能卡瓦7的上部适于与泵杆防喷卡瓦11的下部连接,万能卡瓦7的下部适于与第一横梁5的上部连接,升降油缸4的上部适于与第一横梁5的下部连接,第一横梁5上设置有适于油管和抽油杆通过的开孔,升降油缸4适于通过升降来控制第一横梁5的上升和下降;四闸板防喷器1包括油管卡瓦13、半封闸板14、泵杆卡瓦15及全封闸板16,油管卡瓦13适于固定油管,泵杆卡瓦15适于固定抽油杆;环形防喷器3包括丁腈橡胶芯17。起下抽油杆时使用泵杆防喷卡瓦11固定抽油杆,起下油管时卸掉泵杆防喷卡瓦11,使用万能卡瓦7固定所述油管。An embodiment of the utility model provides a pressurized operation device, as shown in Figure 1 or 2, including a four-ram blowout preventer 1, an annular blowout preventer 3, a lifting cylinder 4, a first beam 5, and a universal slip 7 and pump rod blowout preventer slips 11, wherein the four-ram blowout preventer 1 is fixed at the wellhead, the upper part is suitable for connecting with the lower part of the annular blowout preventer 3, and the annular blowout preventer 3 is located below the first beam 5; the universal card The upper part of the shoe 7 is suitable for connecting with the lower part of the pump rod blowout prevention slip 11, the lower part of the universal slip 7 is suitable for connecting with the upper part of the first beam 5, and the upper part of the lifting cylinder 4 is suitable for connecting with the lower part of the first beam 5 , the first crossbeam 5 is provided with openings suitable for oil pipes and sucker rods to pass through, and the lifting cylinder 4 is suitable for controlling the rise and fall of the first crossbeam 5 by lifting; the four-ram blowout preventer 1 includes oil pipe slips 13 , semi-sealed ram 14, pump rod slip 15 and full-sealed ram 16, oil pipe slip 13 is suitable for fixing the oil pipe, pump rod slip 15 is suitable for fixing the sucker rod; the annular blowout preventer 3 includes a nitrile rubber core 17. Use the pump rod anti-spray slip 11 to fix the sucker rod when lifting and lowering the sucker rod, remove the pump rod anti-spray slip 11 when lifting and lowering the oil pipe, and use the universal slip 7 to fix the oil pipe.
具体地,四闸板防喷器1的上部可通过法兰与环形防喷器3的下部连接,万能卡瓦7的上部可通过法兰与泵杆防喷卡瓦11的下部连接,万能卡瓦7的下部可通过法兰与第一横梁5的上部连接,升降油缸4的两个活塞杆可通过螺栓与第一横梁5的下部连接。连接盘采用合金钢整体锻造并经无损探伤及热处理,保证相邻部件之间连接牢固。本实用新型不对此进行限定,也可采用其他方式进行连接。一般地,第一横梁5的两端可各连接有一个油缸,这样可保证第一横梁5及其支撑的万能卡瓦7的两端平衡上升或下降,保证装置平稳运行,但本实用新型不对此进行限定。Specifically, the upper part of the four-ram blowout preventer 1 can be connected with the lower part of the annular preventer 3 through the flange, and the upper part of the universal slip 7 can be connected with the lower part of the pump rod blowout preventer slip 11 through the flange. The bottom of the shoe 7 can be connected with the top of the first beam 5 through the flange, and the two piston rods of the lifting cylinder 4 can be connected with the bottom of the first beam 5 through bolts. The connection plate is integrally forged with alloy steel and has undergone non-destructive testing and heat treatment to ensure firm connection between adjacent parts. The utility model is not limited to this, and other ways can also be used for connection. Generally, two ends of the first crossbeam 5 can be respectively connected with an oil cylinder, which can ensure that the two ends of the first crossbeam 5 and the universal slips 7 supported by it rise or fall in a balanced manner, and ensure that the device runs smoothly, but the utility model does not This is limited.
在使用本实施例提供的带压作业装置完成起下抽油杆的作业后,采用四闸板防喷器1的全封闸板16封闭井口,然后拆除万能卡瓦7上部固定泵杆防喷卡瓦11的法兰,卸掉泵杆防喷卡瓦11,即可用来起下油管。在本实施例提供的带压作业装置起下抽油杆时也可不安装万能卡瓦7,这种情况下泵杆防喷卡瓦11的下部直接与第一横梁5的上部连接,但本实用新型不对此进行限定。After using the pressurized operation device provided in this embodiment to complete the lifting and lowering of the sucker rod, use the fully sealed ram 16 of the four-ram blowout preventer 1 to seal the wellhead, and then remove the upper part of the universal slip 7 to fix the blowout preventer of the pump rod The flange of slips 11 can be used to lift and lower the oil pipe after unloading the pump rod anti-blowout slips 11. The universal slip 7 may not be installed when the pressure working device provided in this embodiment lifts and lowers the sucker rod. In this case, the lower part of the pump rod anti-spray slip 11 is directly connected with the upper part of the first crossbeam 5, but this practical The new model does not limit this.
安装本实施例提供的带压作业装置起下抽油杆/油管之前,先利用万能封杆器配合手动抽油杆闸板器导出光杆,下抽油杆悬挂堵塞器封住油管内环空。Before installing the working device under pressure provided in this embodiment to lower the sucker rod/tubing pipe, use the universal rod sealer and the manual sucker rod ram to lead out the polished rod, and the lower sucker rod hangs the plug to seal the inner annular space of the oil pipe.
本实施例提供的带压作业装置中环形防喷器3的丁腈橡胶芯17可通过不同管径的管柱及管柱间的接箍,并可保证密封较好,因此丁腈橡胶芯17可通过抽油杆和油管。The nitrile rubber core 17 of the annular blowout preventer 3 in the pressurized operation device provided by this embodiment can pass through the pipe strings of different pipe diameters and the couplings between the pipe strings, and can ensure better sealing, so the nitrile rubber core 17 Can pass through sucker rod and oil pipe.
使用本实施例提供的带压作业装置起抽油杆/油管时,当井内压力对抽油杆/油管的上浮力小于抽油杆/油管的重量时,采用四闸板防喷器1的半封闸板14封闭井口环形空间,采用环形防喷器3密封抽油杆/油管,利用外部辅助设备将抽油杆/油管提出;当井内压力对抽油杆/油管上浮力大于抽油杆/油管的重量时,采用四闸板防喷器1的半封闸板14封闭井口环形空间,采用环形防喷器3密封抽油杆/油管,利用升降油缸4和泵杆防喷卡瓦11/万能卡瓦7配合将抽油杆/油管提出。当出现井口溢流,环形防喷器3的丁腈橡胶芯17对抽油杆或油管的摩擦力不足以克服井内压力对抽油杆或油管的上浮力时,抽油杆、油管上窜,这种情况下可采用四闸板防喷器1的泵杆卡瓦15固定抽油杆,或者油管卡瓦13固定油管,之后采用放压或实施压井措施后再利用升降油缸4和泵杆防喷卡瓦11/万能卡瓦7配合将抽油杆/油管提出。When lifting the sucker rod/tubing by using the hot work device provided in this embodiment, when the buoyancy force of the well pressure on the sucker rod/tubing is less than the weight of the sucker rod/tubing, half of the four-ram BOP 1 is used. The sealing ram 14 seals the annular space of the wellhead, adopts the annular blowout preventer 3 to seal the sucker rod/tubing, and uses the external auxiliary equipment to lift the sucker rod/tubing; When the weight of the oil pipe is lower, the semi-sealed ram 14 of the four-ram blowout preventer 1 is used to seal the annular space of the wellhead, the annular blowout preventer 3 is used to seal the sucker rod/oil pipe, and the lifting cylinder 4 and the pump rod blowout prevention slip 11/ The universal slip 7 cooperates to put out the sucker rod/oil pipe. When wellhead overflow occurs, the friction force of the nitrile rubber core 17 of the annular blowout preventer 3 on the sucker rod or tubing is not enough to overcome the buoyancy of the well pressure on the sucker rod or tubing, and the sucker rod and tubing will go up. In this case, the pump rod slip 15 of the four-ram blowout preventer 1 can be used to fix the sucker rod, or the tubing slip 13 can be used to fix the oil pipe, and then the lifting cylinder 4 and the pump rod can be used after pressure release or well killing measures Blowout prevention slips 11/universal slips 7 cooperate to bring out the sucker rod/oil pipe.
使用本实施例提供的带压作业装置下抽油杆/油管时,当井内压力对抽油杆/油管上浮力小于抽油杆/油管的重量时,采用四闸板防喷器1的半封闸板14封闭井口环形空间,采用环形防喷器3密封抽油杆/油管,利用外部辅助设备将抽油杆/油管下入井内;当井内压力对抽油杆/油管上浮力大于抽油杆/油管的重量时,采用四闸板防喷器1的半封闸板14封闭井口环形空间,采用环形防喷器3密封抽油杆/油管,利用升降油缸4和泵杆防喷卡瓦11/万能卡瓦7配合将抽油杆/油管下入井内。当出现井口溢流,环形防喷器3的丁腈橡胶芯17对抽油杆或油管的摩擦力不足以克服井内压力对抽油杆或油管的上浮力时,抽油杆、油管上窜,这种情况下可采用四闸板防喷器1的泵杆卡瓦15固定抽油杆,或者油管卡瓦13固定油管,采用放压或实施压井措施后再利用升降油缸4和泵杆防喷卡瓦11/万能卡瓦7配合将抽油杆/油管下入井内;当井内没有管柱时,采用四闸板防喷器1的全封闸板15密封井口。When the sucker rod/tubing is lowered using the pressurized operation device provided in this embodiment, when the well pressure on the buoyancy of the sucker rod/tubing is less than the weight of the sucker rod/tubing, the semi-sealed blowout preventer 1 of four rams is used. The ram 14 closes the annular space of the wellhead, uses the annular blowout preventer 3 to seal the sucker rod/tubing, and uses external auxiliary equipment to lower the sucker rod/tubing into the well; / the weight of the tubing, the semi-sealed ram 14 of the four-ram blowout preventer 1 is used to seal the wellhead annular space, the annular blowout preventer 3 is used to seal the sucker rod/oil pipe, and the lifting cylinder 4 and the pump rod blowout prevention slip 11 are used. / The universal slip 7 cooperates to lower the sucker rod/oil pipe into the well. When wellhead overflow occurs, the friction force of the nitrile rubber core 17 of the annular blowout preventer 3 on the sucker rod or tubing is not enough to overcome the buoyancy of the well pressure on the sucker rod or tubing, and the sucker rod and tubing will go up. In this case, the pump rod slip 15 of the four-ram blowout preventer 1 can be used to fix the sucker rod, or the oil pipe slip 13 can be used to fix the oil pipe, and the lifting cylinder 4 and the pump rod preventer can be used after pressure relief or well killing measures are taken. Spray slips 11/universal slips 7 cooperate to lower the sucker rod/oil pipe into the well; when there is no pipe string in the well, use the fully sealed ram 15 of the four-ram blowout preventer 1 to seal the wellhead.
本实施例提供的带压作业装置,为抽油杆和油管一体化带压作业装置,可起下抽油杆和油管,不需要两套带压作业装置来回倒换,简化了带压作业工艺。The snubbing device provided in this embodiment is an integrated snubbing device for the sucker rod and tubing, which can lift and lower the sucker rod and tubing without switching back and forth between two sets of snubbing devices, which simplifies the snubbing process.
本实施例提供的带压作业装置,可用于有杆泵井的抽油杆和油管带压作业,但不限于此。The snubbing device provided in this embodiment can be used for snubbing of sucker rods and tubing in rod pump wells, but is not limited thereto.
作为本实施例的一种改进,如图1或2所示,本实施例提供的带压作业装置还可包括四通2,四通2的上出口适于与环形防喷器3的下部连接,四通2的下出口与四闸板防喷器1的上部连接。具体地,四通2的上出口可通过法兰与环形防喷器3的下部连接,四通2的下出口可通过法兰与四闸板防喷器1的上部连接,本实用新型不对此进行限定。As an improvement of this embodiment, as shown in Figure 1 or 2, the hot working device provided by this embodiment may also include a cross 2, and the upper outlet of the cross 2 is suitable for connecting with the lower part of the annular blowout preventer 3 , the lower outlet of the four-way 2 is connected to the upper part of the four-ram blowout preventer 1. Specifically, the upper outlet of the four-way 2 can be connected to the lower part of the annular blowout preventer 3 through a flange, and the lower outlet of the four-way 2 can be connected to the upper part of the four-ram blowout preventer 1 through a flange. To limit.
作为本实施例的另一种改进,本实施例提供的带压作业装置还可包括手动球阀,手动球阀适于与四通2的侧出口连接。具体地,四通2的两个侧出口均连接有手动球阀。As another improvement of this embodiment, the pressurized working device provided by this embodiment may further include a manual ball valve, which is suitable for connecting with the side outlet of the four-way port 2 . Specifically, both side outlets of the four-way 2 are connected with manual ball valves.
以上两种改进保证了在发生溢流时,可通过控制手动球阀将部分压力从四通2的侧出口放掉,避免井内压力过高造成对环形防喷器3的损害,同时,四通2还可平衡四闸板防喷器1及环形防喷器3之间的压差。本实用新型不对四通2进行限定,也可采用泄压法兰或其他用于泄压的部件,或者采用压井的措施来减小井内压力与地层压力之差。本实用新型也不对手动球阀进行限定,还可在四通2的侧出口设置手动闸板阀或者其他形式的控制阀。The above two improvements ensure that when an overflow occurs, part of the pressure can be released from the side outlet of the four-way 2 by controlling the manual ball valve, so as to avoid damage to the annular blowout preventer 3 caused by excessive pressure in the well. At the same time, the four-way 2 It can also balance the pressure difference between the four-ram blowout preventer 1 and the annular blowout preventer 3 . The utility model does not limit the cross 2, and can also adopt a pressure relief flange or other parts for pressure relief, or adopt measures to kill the well to reduce the difference between the pressure in the well and the formation pressure. The utility model also does not limit the manual ball valve, and a manual gate valve or other forms of control valves can also be arranged at the side outlet of the four-way 2 .
作为本实施例的另一种改进,如图1所示,本实施例提供的带压作业装置还可包括筒形防喷器9,筒形防喷器9位于第一横梁5的下方,筒形防喷器9的下部适于与环形防喷器3的上部连接。具体地,筒形防喷器9的下部可通过法兰与环形防喷器3的上部连接,本实用新型不对此进行限定。在实际中,环形防喷器3的体积较大,环形防喷器3的丁腈橡胶芯17更换较为复杂,筒形防喷器9体积较小,橡胶芯的更换相对简便,一般在起下抽油杆的过程中,环形防喷器3保持全开的状态,通过筒形防喷器9实现对抽油杆的密封及强行过接箍,以保护环形防喷器3的丁腈橡胶芯17。并且,在起下抽油杆的过程中,筒形防喷器9的丁腈橡胶芯19可将抽油杆外壁的油刮掉,起到清洁抽油杆的作用。As another improvement of this embodiment, as shown in Figure 1, the hot working device provided by this embodiment may also include a cylindrical blowout preventer 9, which is located below the first beam 5, and the cylindrical blowout preventer 9 is located below the first beam 5. The lower part of the shaped blowout preventer 9 is adapted to be connected with the upper part of the annular blowout preventer 3 . Specifically, the lower part of the cylindrical blowout preventer 9 can be connected with the upper part of the annular blowout preventer 3 through a flange, which is not limited in the present invention. In practice, the volume of the annular BOP 3 is relatively large, and the replacement of the nitrile rubber core 17 of the annular BOP 3 is relatively complicated. The volume of the cylindrical BOP 9 is relatively small, and the replacement of the rubber core is relatively simple. During the sucker rod process, the annular blowout preventer 3 is kept fully open, and the cylindrical blowout preventer 9 is used to seal the sucker rod and forcibly pass through the coupling to protect the nitrile rubber core of the annular blowout preventer 3 17. Moreover, in the process of lifting and lowering the sucker rod, the nitrile rubber core 19 of the cylindrical blowout preventer 9 can scrape off the oil on the outer wall of the sucker rod to clean the sucker rod.
作为本实施例的另一种改进,如图2所示,本实施例提供的带压作业装置还可包括高压自封10,高压自封10位于第一横梁5的下方,高压自封10的下部适于与环形防喷器3的上部连接。具体地,高压自封10的下部可通过法兰与环形防喷器3的上部连接,但本实用新型不对此进行限定。高压自封10的体积较小,橡胶芯的更换相对方便,一般在起下油管的过程中,环形防喷器3保持全开的状态,通过高压自封10来实现对油管的密封以及强行通过接箍,从而保护环形防喷器3的丁腈橡胶芯17。当使用图1中的带压作业装置起出抽油杆后,采用四闸板防喷器1的全封闸板16封闭井口,然后拆除万能卡瓦7上部固定泵杆防喷卡瓦11的法兰,卸掉泵杆防喷卡瓦11,再拆除环形防喷器3上部固定筒形防喷器9的法兰,卸掉筒形防喷器9,安装高压自封10,即成为图2装置中的带压作业装置,从而可用来起下油管。As another improvement of this embodiment, as shown in Figure 2, the hot-press work device provided by this embodiment may also include a high-pressure self-sealing 10, which is located below the first beam 5, and the lower part of the high-pressure self-sealing 10 is suitable for It is connected with the upper part of the annular blowout preventer 3. Specifically, the lower part of the high-pressure self-sealing 10 can be connected to the upper part of the annular blowout preventer 3 through a flange, but the utility model is not limited thereto. The volume of the high-pressure self-sealing 10 is small, and the replacement of the rubber core is relatively convenient. Generally, during the process of lifting and lowering the oil pipe, the annular blowout preventer 3 is kept fully open, and the high-pressure self-sealing 10 is used to seal the oil pipe and forcibly pass through the coupling. , thereby protecting the nitrile rubber core 17 of the annular blowout preventer 3 . After pulling out the sucker rod with the pressurized operation device in Fig. 1, the wellhead is closed with the fully sealed ram 16 of the four-ram blowout preventer 1, and then the upper part of the universal slip 7 is removed to fix the blowout preventer slip 11 of the pump rod. For the flange, remove the anti-blowout slips 11 of the pump rod, and then remove the flange on the upper part of the ring-shaped BOP 3 to fix the cylindrical BOP 9, remove the cylindrical BOP 9, and install the high-pressure self-sealing 10, which becomes Fig. 2 The pressurized working device in the device can be used to lift and lower the oil pipe.
作为本实施例的另一种改进,如图5和6所示,筒形防喷器9内部可设置有丁腈橡胶芯19,高压自封10内部可设置有丁腈橡胶芯18。这样,筒形防喷器9可通过不同管径的抽油杆和接箍,并且保证密封性良好,高压自封10可通过不同管径的油管和接箍,并且保证密封性良好。这种改进使带压作业装置适用性更好。As another improvement of this embodiment, as shown in Figures 5 and 6, a nitrile rubber core 19 may be provided inside the cylindrical blowout preventer 9, and a nitrile rubber core 18 may be provided inside the high-pressure self-sealing 10 . In this way, the cylindrical blowout preventer 9 can pass through sucker rods and couplings of different pipe diameters, and ensure good sealing performance, and the high-pressure self-sealing 10 can pass through oil pipes and couplings of different pipe diameters, and ensure good sealing performance. This improvement makes the applicability of the device for working with pressure better.
作为本实施例的另一种改进,如图1或2所示,本实施例提供的带压作业装置还可包括第二横梁8,第二横梁8的上部适于与四闸板防喷器1的下部连接,第二横梁8固定于井口。具体地,第二横梁8与四闸板防喷器1可通过法兰连接,第二横梁8下部可连接旋转法兰12,旋转法兰12用于安装过程中装置方位调整。第二横梁8用于装置安装找平,保证整个装置平稳。As another improvement of this embodiment, as shown in Fig. 1 or 2, the hot work device provided by this embodiment may also include a second beam 8, the upper part of which is suitable for connecting with the four-ram blowout preventer. The lower part of 1 is connected, and the second beam 8 is fixed at the wellhead. Specifically, the second beam 8 and the four-ram blowout preventer 1 can be connected through a flange, and the lower part of the second beam 8 can be connected with a rotating flange 12, which is used for adjusting the orientation of the device during installation. The second beam 8 is used for device installation and leveling to ensure that the whole device is stable.
作为本实施例的另一种改进,四闸板防喷器1的油管卡瓦13及泵杆卡瓦15和万能卡瓦7的卡瓦牙可为“V”型,如图7所示,泵杆防喷卡瓦11的闸板卡瓦20的卡瓦牙可为倒“Y”型。将四闸板防喷器1的油管卡瓦13及泵杆卡瓦15和万能卡瓦7的卡瓦牙设计为“V”型,可保证油管卡瓦13及泵杆卡瓦15和万能卡瓦7既能承重又能防顶,可防止抽油杆和油管落井或者上窜。将泵杆防喷卡瓦11的闸板卡瓦20的卡瓦牙设计为倒“Y”型,可有效防止抽油杆上窜。本实用新型不对此进行限定,也可将四闸板防喷器1的油管卡瓦13及泵杆卡瓦15、万能卡瓦7、泵杆防喷卡瓦11的闸板卡瓦20的卡瓦牙设计为其他可以承重和/或防顶的形状。As another improvement of this embodiment, the slip teeth of the tubing slip 13, the pump rod slip 15 and the universal slip 7 of the four-ram blowout preventer 1 can be "V" type, as shown in Figure 7, The slip teeth of the ram slip 20 of the pump rod blowout prevention slip 11 can be inverted "Y" shape. The tubing slips 13, pump rod slips 15 and universal slips 7 of the four-ram blowout preventer 1 are designed to be V-shaped, which can ensure that the tubing slips 13, pump rod slips 15 and universal slips The tile 7 can not only bear the load but also prevent the top, and can prevent the sucker rod and the oil pipe from falling into the well or running up. The slip teeth of the ram slips 20 of the pump rod anti-blowout slips 11 are designed as an inverted "Y" shape, which can effectively prevent the sucker rod from running up. The utility model does not limit this, and the oil pipe slip 13 of the four-ram preventer 1, the pump rod slip 15, the universal slip 7, and the ram slip 20 of the pump rod anti-blowout slip 11 can also be The tiles are designed as other shapes that can be load bearing and/or roof resistant.
作为本实施例的另一种改进,如图1或2所示,本实施例提供的带压作业装置还可包括工作平台6,工作平台6适于与升降油缸4连接。具体地,工作平台6可通过法兰与升降油缸4连接,升降油缸4可通过升降带动工作平台6上升和下降。实际中,工作平台6为框架结构,有四根立柱支撑,立柱的下部设计为可拉伸结构,从而在升降油缸4上升和下降时能够带动工作平台6上升和下降。四根立柱的上段通过螺栓或者法兰与工平台6连接,下端通过螺栓或者法兰与第二横梁8连接,可保障工作平台6平稳及拆卸方便。作业人员可站在工作平台6上对装置进行操控。As another improvement of this embodiment, as shown in FIG. 1 or 2 , the pressurized working device provided by this embodiment may also include a working platform 6 , which is adapted to be connected with the lifting cylinder 4 . Specifically, the working platform 6 can be connected to the lifting cylinder 4 through a flange, and the lifting cylinder 4 can drive the working platform 6 to rise and fall through lifting. In practice, the working platform 6 is a frame structure supported by four columns, and the lower part of the columns is designed as a stretchable structure, so that the working platform 6 can be driven up and down when the lifting cylinder 4 rises and falls. The upper sections of the four columns are connected with the work platform 6 by bolts or flanges, and the lower ends are connected with the second beam 8 by bolts or flanges, which can ensure that the work platform 6 is stable and easy to disassemble. Operators can stand on the working platform 6 to control the device.
以上所述仅是为了便于本领域的技术人员理解本实用新型的技术方案,并不用以限制本实用新型。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above description is only for those skilled in the art to understand the technical solution of the utility model, and is not intended to limit the utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621073204.9U CN206158656U (en) | 2016-09-22 | 2016-09-22 | A pressure working device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621073204.9U CN206158656U (en) | 2016-09-22 | 2016-09-22 | A pressure working device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206158656U true CN206158656U (en) | 2017-05-10 |
Family
ID=58651490
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621073204.9U Active CN206158656U (en) | 2016-09-22 | 2016-09-22 | A pressure working device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206158656U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107859499A (en) * | 2016-09-22 | 2018-03-30 | 中国石油天然气股份有限公司 | A pressure working device |
| CN108119089A (en) * | 2017-11-24 | 2018-06-05 | 中国石油天然气集团公司 | Prevent the devices and methods therefor of tubing string play |
| CN113464081A (en) * | 2020-03-30 | 2021-10-01 | 中国石油化工股份有限公司 | Coal bed gas micro-strip pressure well repairing process |
-
2016
- 2016-09-22 CN CN201621073204.9U patent/CN206158656U/en active Active
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107859499A (en) * | 2016-09-22 | 2018-03-30 | 中国石油天然气股份有限公司 | A pressure working device |
| CN107859499B (en) * | 2016-09-22 | 2024-01-30 | 中国石油天然气股份有限公司 | Pressurized operation device |
| CN108119089A (en) * | 2017-11-24 | 2018-06-05 | 中国石油天然气集团公司 | Prevent the devices and methods therefor of tubing string play |
| CN113464081A (en) * | 2020-03-30 | 2021-10-01 | 中国石油化工股份有限公司 | Coal bed gas micro-strip pressure well repairing process |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107859499A (en) | A pressure working device | |
| CN110630204B (en) | Under-pressure operation equipment for gas drive injection well completion and under-pressure operation method thereof | |
| CN103993852A (en) | Gas well snubbing fluid sealing gas wellhead blowout prevention system | |
| CN110359843A (en) | A kind of suction anchor formula surface layer shaft building device being suitable for deep water exploitation of gas hydrates | |
| CN108119073A (en) | A reverse circulation sand flushing string | |
| CN104975818B (en) | Equipment and technology for lifting and lowering oil pipes | |
| CN204609825U (en) | Marine operation device under pressure | |
| CN206158656U (en) | A pressure working device | |
| CN104343400A (en) | Snubbing controllable workover operation equipment and operation method thereof | |
| CN104863538A (en) | Setting blowout preventer device with pressed plug | |
| CN204646137U (en) | A kind of low-pressure gas well operation device under pressure | |
| CN105239953A (en) | Blowout-preventive operation device for lifting and lowering rod pipe under pressure | |
| CN205297374U (en) | Centralizing plate | |
| CN118622219B (en) | Method and system for realizing completion operation of oil-gas well without well killing | |
| CN114673461A (en) | A device suitable for pressurized operation of shallow low-pressure oil wells | |
| CN203420652U (en) | Pressure-balanced and controllable workover treatment device | |
| CN211230245U (en) | A suction anchor type surface well construction device suitable for deepwater natural gas hydrate exploitation | |
| CN204457499U (en) | Tubing tripping device in snubbing workover rig | |
| CN201567999U (en) | Hydraulic electric control no-killing well operation device | |
| CN103939047B (en) | A kind of annular preventer packing unit more changing device | |
| CN107795297A (en) | Multistage a chain of Cut Block blocking | |
| CN205558858U (en) | No -killing operation device | |
| CN104481426A (en) | Operation well anti-top and anti-channeling device | |
| CN205063886U (en) | Area has been pressed lower beam pipe and has been prevented spouting operation device | |
| CN108252681A (en) | Steam channeling prevention and control device and method for thermal recovery well operation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |