CN203594024U - 钻孔灌注桩钢筋笼标高控制杆 - Google Patents

钻孔灌注桩钢筋笼标高控制杆 Download PDF

Info

Publication number
CN203594024U
CN203594024U CN201320789864.7U CN201320789864U CN203594024U CN 203594024 U CN203594024 U CN 203594024U CN 201320789864 U CN201320789864 U CN 201320789864U CN 203594024 U CN203594024 U CN 203594024U
Authority
CN
China
Prior art keywords
cast
control rod
elevation control
situ bored
control lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320789864.7U
Other languages
English (en)
Inventor
刘阳
徐小军
林子义
瞿华梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANKUANG DONGHUA CONSTRUCTION CO Ltd
Original Assignee
YANKUANG DONGHUA CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANKUANG DONGHUA CONSTRUCTION CO Ltd filed Critical YANKUANG DONGHUA CONSTRUCTION CO Ltd
Priority to CN201320789864.7U priority Critical patent/CN203594024U/zh
Application granted granted Critical
Publication of CN203594024U publication Critical patent/CN203594024U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种钻孔灌注桩钢筋笼标高控制杆。钢筋混凝土钻孔灌注桩施工时,钢筋笼容易上浮,使其在混凝土中不能保持正常位置。为此,本钻孔灌注桩钢筋笼标高控制杆包括标高控制杆和插销杆,其中标高控制杆一侧自上而下依次焊有至少三个卡环,上述卡环的轴心线重合且垂直,卡环内孔直径大于插销杆与加强筋直径的和,两个相邻卡环之间可卡入加强筋,插销杆可自上而下依次插入各个卡环内。本实用新型钻孔灌注桩钢筋笼标高控制杆具有使用方便,可以精确控制混凝土中预埋钢筋笼的高度,并可重复利用,适用于钻孔灌注桩施工作业中。

Description

钻孔灌注桩钢筋笼标高控制杆
技术领域
本实用新型涉及一种钻孔灌注桩钢筋笼标高控制杆。
背景技术
钢筋混凝土钻孔灌注桩施工时,需要保证桩顶标高,在钢筋笼放入钻孔,灌注混凝土及提升导管时都有可能造成钢筋笼上浮,使其位置高于设计标高。
实用新型内容
本实用新型要解决的技术问题是如何克服现有技术的上述缺陷,提供一种钻孔灌注桩钢筋笼标高控制杆。
为解决上述技术问题,本钻孔灌注桩钢筋笼标高控制杆包括标高控制杆和插销杆,其中标高控制杆一侧自上而下依次焊有至少三个卡环,上述卡环的轴心线重合且垂直,卡环内孔直径大于插销杆与加强筋直径之和,最底端两卡环之间可卡入加强筋,插销杆自上而下依次插入各个卡环内。
如此设计,可以很好的固定钢筋笼,而且本钻孔灌注桩钢筋笼标高控制杆可以重复使用。
对于分段制作的钢筋笼,应在吊放最后一节钢筋笼时使用标高控制杆,以钻机平台为基准面,根据设计桩顶标高和钻机平台实际标高,可计算出钢筋笼的下放高度。下放钢筋笼至计算高度后,将标高控制杆上段固定在钻机平台上。
如此设计,可以准确控制钢筋笼的下放高度,有效保证桩顶标高。
作为优化,所述标高控制杆上段设有多根等长的水平标杆。如此设计,水平标杆一方面可作高度控制,有助于操作人员观察高度差变化,还可以固定插销杆,便于调节和移动。
本实用新型钻孔灌注桩钢筋笼标高控制杆具有使用方便,可以准确控制钢筋笼的下放高度,有效保证桩顶标高,并可重复使用,适用于钻孔灌注桩施工作业中。
附图说明
下面结合附图对本钻孔灌注桩钢筋笼标高控制杆作进一步说明:
图1是本钻孔灌注桩钢筋笼标高控制杆的使用状态结构示意图(沿垂直面剖去一部分混凝土)。
图中:1为标高控制杆下段、2为插销杆、3为卡环、4为钢筋笼、5为加强筋、6为螺旋箍筋、7为标高控制杆上段、8为水平标杆、9为混凝土钻孔灌注桩。
具体实施方式
实施方式一:如图1所示,本钻孔灌注桩钢筋笼标高控制杆包括标高控制杆上段7、标高控制杆下段1和插销杆2,其中标高控制杆下段1一侧自上而下依次焊有至少三个卡环3,除最底端两卡环外,其余卡环间距均为1000mm,上述卡环3的轴心线重合且垂直。
卡环3内孔直径大于插销杆2与加强筋5直径的和,底端两个相邻卡环3之间可卡入加强筋5,插销杆2可自上而下依次插入各个卡环3内。
所述标高控制杆上段7设有多根等长的水平标杆8,间距均为100mm。
使用时,先将钢筋笼4顶端加强筋5楔入控制杆底部两卡环3间隙,再把插销杆2依次插进卡环3内,将插销杆2弯钩挂在水平标杆8上,使插销杆2和标高控制杆下段1从内外两侧卡住加强筋5,使底部两个卡环3分别从上下两面卡住加强筋5,即可下放钢筋笼4。
灌注混凝土及提升导管时,若发现标高控制杆上移,就表示钢筋笼4上浮了,便于施工人员及时监控和采取措施。当混凝土全部浇筑完毕后,先抽出插销杆2,再取下标高控制杆,即可用于下一棵桩使用。

Claims (2)

1.一种钻孔灌注桩钢筋笼标高控制杆,其特征在于:包括标高控制杆和插销杆,其中标高控制杆一侧自上而下依次焊有至少三个卡环,上述卡环的轴心线重合且垂直,卡环内孔直径大于插销杆与加强筋直径之和,最底端两卡环之间可卡入加强筋,插销杆自上而下依次插入各个卡环内。
2.如权利要求1所述的钻孔灌注桩钢筋笼标高控制杆,其特征在于:所述标高控制杆上段均匀设有多根等长的水平标杆。
CN201320789864.7U 2013-12-03 2013-12-03 钻孔灌注桩钢筋笼标高控制杆 Expired - Fee Related CN203594024U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320789864.7U CN203594024U (zh) 2013-12-03 2013-12-03 钻孔灌注桩钢筋笼标高控制杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320789864.7U CN203594024U (zh) 2013-12-03 2013-12-03 钻孔灌注桩钢筋笼标高控制杆

Publications (1)

Publication Number Publication Date
CN203594024U true CN203594024U (zh) 2014-05-14

Family

ID=50674921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320789864.7U Expired - Fee Related CN203594024U (zh) 2013-12-03 2013-12-03 钻孔灌注桩钢筋笼标高控制杆

Country Status (1)

Country Link
CN (1) CN203594024U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153353A (zh) * 2014-08-22 2014-11-19 中铁六局集团天津铁路建设有限公司 一种利用激光投线仪确定钻孔灌注桩标高的方法
CN107100164A (zh) * 2017-04-18 2017-08-29 中冶建工集团有限公司 一种长螺旋钻孔压灌桩施工方法
CN110792112A (zh) * 2019-10-22 2020-02-14 中冶天工集团有限公司 一种测量灌注桩全套管内钢筋笼上浮的装置及测量方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153353A (zh) * 2014-08-22 2014-11-19 中铁六局集团天津铁路建设有限公司 一种利用激光投线仪确定钻孔灌注桩标高的方法
CN104153353B (zh) * 2014-08-22 2016-03-30 中铁六局集团天津铁路建设有限公司 一种利用激光投线仪确定钻孔灌注桩标高的方法
CN107100164A (zh) * 2017-04-18 2017-08-29 中冶建工集团有限公司 一种长螺旋钻孔压灌桩施工方法
CN110792112A (zh) * 2019-10-22 2020-02-14 中冶天工集团有限公司 一种测量灌注桩全套管内钢筋笼上浮的装置及测量方法

Similar Documents

Publication Publication Date Title
CN103205965B (zh) 根式承压灌注桩及其施工方法
CN201280720Y (zh) 小直径自平衡根键灌注桩根键顶推装置
CN203594024U (zh) 钻孔灌注桩钢筋笼标高控制杆
CN103670286B (zh) 一种输电铁塔复合基础锚固钻机全方位移动底座
CN104878745A (zh) 带双螺旋钻杆的成桩装置与成桩方法
CN107858923B (zh) 桩基钢筋笼孔内定位的方法
CN204959787U (zh) 一种新型塔吊组合式基础
CN103510513A (zh) 冲击钻用钻孔灌注桩桩基组合护筒
CN107059846A (zh) 配合钻芯检测的超大长径比灌注桩钢筋笼及钻芯检测方法
CN104818729B (zh) 可供大小塔吊转换的共用基础
CN101250870B (zh) 灌注桩钢筋笼定位装置
CN102747954A (zh) 适用于倾斜岩面的钻孔导向定位系统及施工方法
CN103132508A (zh) 灌桩机
CN203530971U (zh) 冲击钻用钻孔灌注桩桩基组合护筒
CN202039379U (zh) 用于盖挖逆作法施工中钢管柱安装的自动定位器
CN204959733U (zh) 灌注桩钢筋笼结构
CN210439338U (zh) 钻孔灌注桩混凝土浇灌高度检测装置
CN105544551A (zh) 一种超长灌注桩快速下放钢筋笼的施工方法
CN109989434B (zh) 钻孔灌注桩混凝土浇灌高度检测装置及使用方法
CN206616553U (zh) 配合钻芯检测的超大长径比灌注桩钢筋笼
CN208792943U (zh) 一种快速移动式电杆基坑的开挖装置
CN207160044U (zh) 一种三个桶形基础联合组件
CN201169768Y (zh) 灌注桩钢筋笼定位装置
CN204238210U (zh) 灌注桩结构
CN205475325U (zh) 一种逆作法机械化降模系统

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Yang

Inventor after: Xu Xiaojun

Inventor after: Lin Ziyi

Inventor after: Di Huamei

Inventor before: Liu Yang

Inventor before: Xu Xiaojun

Inventor before: Lin Ziyi

Inventor before: Ji Huamei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU YANG XU XIAOJUN LIN ZIYI QU HUAMEI TO: LIU YANG XU XIAOJUN LIN ZIYI ZHAI HUAMEI

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140514

Termination date: 20141203

EXPY Termination of patent right or utility model