CN103205965B - 根式承压灌注桩及其施工方法 - Google Patents
根式承压灌注桩及其施工方法 Download PDFInfo
- Publication number
- CN103205965B CN103205965B CN201310154696.9A CN201310154696A CN103205965B CN 103205965 B CN103205965 B CN 103205965B CN 201310154696 A CN201310154696 A CN 201310154696A CN 103205965 B CN103205965 B CN 103205965B
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- pile
- hole
- branch
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310154696.9A CN103205965B (zh) | 2013-04-28 | 2013-04-28 | 根式承压灌注桩及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310154696.9A CN103205965B (zh) | 2013-04-28 | 2013-04-28 | 根式承压灌注桩及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103205965A CN103205965A (zh) | 2013-07-17 |
CN103205965B true CN103205965B (zh) | 2014-12-10 |
Family
ID=48753357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310154696.9A Expired - Fee Related CN103205965B (zh) | 2013-04-28 | 2013-04-28 | 根式承压灌注桩及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103205965B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669342A (zh) * | 2013-12-30 | 2014-03-26 | 中铁二十四局集团有限公司 | 利用多层超宽单桩基础提高桩群承载力的方法 |
CN103911990B (zh) * | 2014-04-25 | 2015-11-18 | 安徽省交通控股集团有限公司 | 一种带有护壁的水下浇筑式管柱及其施工方法 |
CN103911989B (zh) * | 2014-04-25 | 2015-11-18 | 安徽省交通控股集团有限公司 | 一种带有护壁的水下浇筑根式基础及其施工方法 |
CN106677173B (zh) * | 2016-11-25 | 2019-02-01 | 淮阴工学院 | 根式灌注桩的根键施工装置 |
CN106638585B (zh) * | 2016-11-25 | 2018-11-13 | 淮阴工学院 | 便于根式灌注桩的根键施工的施工平台 |
CN106759446A (zh) * | 2017-02-27 | 2017-05-31 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种用于输电线路的根键式空心掏挖基础 |
CN106884429B (zh) * | 2017-04-10 | 2019-12-17 | 浙江省现代建筑设计研究院有限公司 | 一种预制桩施工方法 |
CN110093942A (zh) * | 2019-05-30 | 2019-08-06 | 安徽省交通控股集团有限公司 | 一种双壁中空的装配式根式沉井基础 |
CN110528556B (zh) * | 2019-08-13 | 2021-06-04 | 北京工业大学 | 一种基于根系仿生的基础及施工方法 |
CN111101509A (zh) * | 2020-02-11 | 2020-05-05 | 北京中岩大地科技股份有限公司 | 一种预制根式桩结构和施工方法 |
CN112281822A (zh) * | 2020-09-03 | 2021-01-29 | 宁波汇洲生态建设有限公司 | 一种市政软基道路加固方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4389093B2 (ja) * | 1998-06-26 | 2009-12-24 | 三谷セキサン株式会社 | 下端部に鉄筋かごを設けた既製コンクリート杭、鉄筋かご、基礎杭構造、基礎杭の構築方法 |
CN1131912C (zh) * | 2001-10-18 | 2003-12-24 | 赵书平 | 可变式支盘扩底植入桩及成型方法 |
CN2934352Y (zh) * | 2006-07-26 | 2007-08-15 | 安徽省高速公路总公司 | 根键式钻孔灌注桩施工装置 |
CN102162247B (zh) * | 2010-02-21 | 2013-02-27 | 韩顺和 | 支盘灌注桩施工方法 |
CN102359110A (zh) * | 2011-08-03 | 2012-02-22 | 安徽省高速公路控股集团有限公司 | 大直径根式基础模块式现浇施工方法 |
CN203160229U (zh) * | 2013-04-28 | 2013-08-28 | 龚成中 | 根式承压灌注桩 |
-
2013
- 2013-04-28 CN CN201310154696.9A patent/CN103205965B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103205965A (zh) | 2013-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103205965B (zh) | 根式承压灌注桩及其施工方法 | |
CN104453014B (zh) | 3d打印填充墙体与构造柱的连接方法和连接结构 | |
CN103195076B (zh) | 淤泥质深基坑塔吊基础施工方法 | |
CN103195085B (zh) | 一种向下加层地下室及其建造方法 | |
CN103422510B (zh) | 钢管框架式围堰结构及施工方法 | |
CN104060634B (zh) | 顶管工井预留孔洞的止水方法及结构 | |
CN103452121A (zh) | 一种长短桩结合的单排桩+水平内支撑的桩撑支护结构及其施工方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN103104102B (zh) | 一种地下增层改造施工方法 | |
CN203411993U (zh) | 一种简单快捷式挡土墙 | |
CN103397667A (zh) | 既有建筑直接增层基础结构及其施工方法 | |
CN106351331A (zh) | 多层地下室逆顺结合施工工艺 | |
CN104563147B (zh) | 适用于岩溶区的组合结构桩基础及其施工方法 | |
CN103643681B (zh) | 一种地铁车站基坑逆作支护结构及其施工方法 | |
CN105133641B (zh) | 一种薄壁型连续墙式地基基础加固结构及方法 | |
CN204000963U (zh) | 顶管工井预留孔洞的止水结构 | |
CN102877466A (zh) | 一种旋扩灌注桩及其施工方法 | |
CN205024719U (zh) | 桩基础与地下连续墙一体化的逆作法施工竖向支撑体系 | |
CN205382942U (zh) | 既有设施下多层地下空间幕架式暗挖施工的支护结构 | |
CN204139190U (zh) | 一种可吊装预制砖胎膜 | |
CN203393755U (zh) | 既有建筑直接增层基础结构 | |
CN203361127U (zh) | 一种适用于断层破碎带的地基结构 | |
CN203160229U (zh) | 根式承压灌注桩 | |
CN104153346A (zh) | 一种大面积预制式预应力地下连续墙 | |
CN104120714B (zh) | 人工挖孔桩的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: HUAIJIN POLYTECHNICAL COLLEGE Free format text: FORMER OWNER: HE CHUNLIN Effective date: 20131009 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20131009 Address after: 223001 School of architectural engineering, Huaiyin Institute of Technology, 89 North Beijing Road, Huaian, Jiangsu Applicant after: Huaijin Polytechnical College Address before: 223001 School of architectural engineering, Huaiyin Institute of Technology, 89 North Beijing Road, Huaian, Jiangsu Applicant before: He Chunlin |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: He Chunlin Inventor after: Gong Chengzhong Inventor before: Gong Chengzhong Inventor before: He Chunlin |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: GONG CHENGZHONG HE CHUNLIN TO: HE CHUNLIN GONG CHENGZHONG |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20160428 |