CN203530971U - 冲击钻用钻孔灌注桩桩基组合护筒 - Google Patents
冲击钻用钻孔灌注桩桩基组合护筒 Download PDFInfo
- Publication number
- CN203530971U CN203530971U CN201320636674.1U CN201320636674U CN203530971U CN 203530971 U CN203530971 U CN 203530971U CN 201320636674 U CN201320636674 U CN 201320636674U CN 203530971 U CN203530971 U CN 203530971U
- Authority
- CN
- China
- Prior art keywords
- casing
- pile
- pile foundation
- cylindrical shell
- pile casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种冲击钻用钻孔灌注桩桩基组合护筒,解决了现有冲击钻施工钻孔灌注桩桩基的钢筋笼上浮所导致的钻孔灌注桩报废的问题。包括在护筒筒体基坑中设置有护筒筒体(2),在护筒筒体(2)的正下方设置有桩基孔(3)和钢筋笼(4),在护筒筒体(2)的顶部设置有护筒顶部环形帽(9),在护筒顶部环形帽(9)的外圆上等间隔弧度地分别设置有3个水平放射状支撑杆(10),在水平放射状支撑杆(10)的外端设置有配重托盘(12),在配重托盘(12)中设置有配重铁块(14),在地面(1)与配重托盘(12)之间设置有水平调节垫块(13)。本实用新型降低了灌注桩的报废率,结构简单,操作方便。
Description
技术领域
本发明涉及一种桩基施工设备,特别涉及一种冲击钻施工钻孔灌注桩的护筒。
背景技术
采用冲击钻施工钻孔灌注桩的桩基时,由于钻锤冲击产生的震动,以及护筒埋设本身的不平,常会导致灌注桩的护筒产生倾斜,护筒倾斜会导致钻孔灌注桩偏孔。特别是桩基钻孔完成后,灌注混凝土过程中,由于混凝土下放的冲击力和浮力的作用,常常会导致钢筋笼向上浮动,直接导致钢筋笼位置与设计不符。现有技术在克服护筒倾斜时,是采用水准仪定时测量灌注桩的护筒的水平度,存在不能连续监控护筒的偏移状态,容易造成孔桩倾斜,影响桩基施工质量;现有技术在克服钢筋笼上浮的问题时,是通过在护筒与钢筋笼之间焊接吊筋的方法来实现的,吊筋下部与钢筋笼焊接,吊筋上部与钢护筒焊接,由于注入到孔桩底部的混凝土的冲击力及浮力较大,容易造成钢筋笼带动护筒上浮,使钢筋笼的位置偏离设计位置,有时还会发生吊筋焊缝断裂的现象,起不到控制钢筋笼上浮的目的。
发明内容
本发明提供了一种冲击钻用钻孔灌注桩桩基组合护筒,解决了现有冲击钻施工钻孔灌注桩桩基的钢筋笼上浮所导致的钻孔灌注桩报废的问题。
本发明是通过以下技术方案解决以上技术问题的:
一种冲击钻用钻孔灌注桩桩基组合护筒,包括在地面设置有护筒筒体基坑,在护筒筒体基坑中设置有护筒筒体,在护筒筒体的正下方设置有桩基孔,在桩基孔中设置有钢筋笼,注浆导管的底端依次通过护筒筒体和钢筋笼设置在桩基孔的底部,混凝土是通过注浆导管灌注到桩基孔的底部的,在护筒筒体的顶部设置有护筒顶部环形帽,在护筒顶部环形帽的外圆上等间隔弧度地分别设置有3个水平放射状支撑杆,在水平放射状支撑杆的外端设置有配重托盘,在配重托盘中设置有配重铁块,在地面与配重托盘之间设置有水平调节垫块。
在护筒顶部环形帽与护筒筒体之间设置有钢筋笼吊筋吊环,在钢筋笼的顶部设置有顶部带钩的钢筋笼吊筋,钢筋笼吊筋的顶部钩与钢筋笼吊筋吊环活动挂接在一起,在护筒顶部环形帽上分别设置水准气泡和护筒吊环,在水平放射状支撑杆的下部设置有水平支撑杆加强筋。
本发明降低了灌注桩的报废率,结构简单,操作方便。
附图说明
图1是本发明的结构示意图;
图2是发明在俯视方向下的结构示意图。
具体实施方式
下面结合附图对本发明进行详细说明:
一种冲击钻用钻孔灌注桩桩基组合护筒,包括在地面1设置有护筒筒体基坑,在护筒筒体基坑中设置有护筒筒体2,在护筒筒体2的正下方设置有桩基孔3,在桩基孔3中设置有钢筋笼4,注浆导管5的底端依次通过护筒筒体2和钢筋笼4设置在桩基孔3的底部,混凝土6是通过注浆导管5灌注到桩基孔3的底部的,在护筒筒体2的顶部设置有护筒顶部环形帽9,在护筒顶部环形帽9的外圆上等间隔弧度地分别设置有3个水平放射状支撑杆10,在水平放射状支撑杆10的外端设置有配重托盘12,在配重托盘12中设置有配重铁块14,在地面1与配重托盘12之间设置有水平调节垫块13。
在护筒顶部环形帽9与护筒筒体2之间设置有钢筋笼吊筋吊环8,在钢筋笼4的顶部设置有顶部带钩的钢筋笼吊筋7,钢筋笼吊筋7的顶部钩与钢筋笼吊筋吊环8活动挂接在一起,在护筒顶部环形帽9上分别设置水准气泡16和护筒吊环15,在水平放射状支撑杆10的下部设置有水平支撑杆加强筋11。
本发明的总的创新思路是在冲击钻钻孔过程中能够随时监控护筒的水平状态,并通过在水平放射状支撑杆10的下部设置调节垫块和在配重托盘12中设置配重铁块14的方式,在灌注混凝土时,来保证了钢筋笼的准确定位,从而保证了钻孔灌注桩的施工质量。
Claims (2)
1.一种冲击钻用钻孔灌注桩桩基组合护筒,包括在地面(1)设置有护筒筒体基坑,在护筒筒体基坑中设置有护筒筒体(2),在护筒筒体(2)的正下方设置有桩基孔(3),在桩基孔(3)中设置有钢筋笼(4),注浆导管(5)的底端依次通过护筒筒体(2)和钢筋笼(4)设置在桩基孔(3)的底部,混凝土(6)是通过注浆导管(5)灌注到桩基孔(3)的底部的,其特征在于,在护筒筒体(2)的顶部设置有护筒顶部环形帽(9),在护筒顶部环形帽(9)的外圆上等间隔弧度地分别设置有3个水平放射状支撑杆(10),在水平放射状支撑杆(10)的外端设置有配重托盘(12),在配重托盘(12)中设置有配重铁块(14),在地面(1)与配重托盘(12)之间设置有水平调节垫块(13)。
2.根据权利要求1所述的冲击钻用钻孔灌注桩桩基组合护筒,其特征在于,在护筒顶部环形帽(9)与护筒筒体(2)之间设置有钢筋笼吊筋吊环(8),在钢筋笼(4)的顶部设置有顶部带钩的钢筋笼吊筋(7),钢筋笼吊筋(7)的顶部钩与钢筋笼吊筋吊环(8)活动挂接在一起,在护筒顶部环形帽(9)上分别设置水准气泡(16)和护筒吊环(15),在水平放射状支撑杆(10)的下部设置有水平支撑杆加强筋(11)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320636674.1U CN203530971U (zh) | 2013-10-16 | 2013-10-16 | 冲击钻用钻孔灌注桩桩基组合护筒 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320636674.1U CN203530971U (zh) | 2013-10-16 | 2013-10-16 | 冲击钻用钻孔灌注桩桩基组合护筒 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203530971U true CN203530971U (zh) | 2014-04-09 |
Family
ID=50417196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320636674.1U Withdrawn - After Issue CN203530971U (zh) | 2013-10-16 | 2013-10-16 | 冲击钻用钻孔灌注桩桩基组合护筒 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203530971U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510513A (zh) * | 2013-10-16 | 2014-01-15 | 中铁十九局集团有限公司 | 冲击钻用钻孔灌注桩桩基组合护筒 |
CN104805836A (zh) * | 2015-04-27 | 2015-07-29 | 上海山顺土木工程技术有限公司 | 灌注桩护筒系统及灌注桩系统 |
CN108842757A (zh) * | 2018-07-26 | 2018-11-20 | 大成科创基础建设股份有限公司 | 大直径超深入钻孔灌注桩施工方法 |
-
2013
- 2013-10-16 CN CN201320636674.1U patent/CN203530971U/zh not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510513A (zh) * | 2013-10-16 | 2014-01-15 | 中铁十九局集团有限公司 | 冲击钻用钻孔灌注桩桩基组合护筒 |
CN104805836A (zh) * | 2015-04-27 | 2015-07-29 | 上海山顺土木工程技术有限公司 | 灌注桩护筒系统及灌注桩系统 |
CN108842757A (zh) * | 2018-07-26 | 2018-11-20 | 大成科创基础建设股份有限公司 | 大直径超深入钻孔灌注桩施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510513B (zh) | 冲击钻用钻孔灌注桩桩基组合护筒 | |
CN110397076A (zh) | 一种深水大直径灌注桩施工方法 | |
CN103758147B (zh) | 一种重力式海上风电机组基础及其拖航与下沉方法 | |
CN203625893U (zh) | 嵌岩灌注桩 | |
CN106759281B (zh) | 一种防止混凝土灌注桩钢筋笼上浮的锚固叉 | |
CN108914961B (zh) | 采用螺旋锚的通讯铁塔基础及施工方法 | |
CN203530971U (zh) | 冲击钻用钻孔灌注桩桩基组合护筒 | |
CN203741820U (zh) | 一种岩溶地区钻孔灌注桩结构 | |
CN101294384A (zh) | 桩、柱接口定位装置及其施工方法 | |
CN106087984B (zh) | 一种异形钢筋笼以及一种异形抗拔桩的施工方法 | |
CN204780969U (zh) | 大型输电杆塔复合扩顶灌注桩基础 | |
CN104790423A (zh) | 一种大型输电杆塔复合扩顶灌注桩基础 | |
CN204959787U (zh) | 一种新型塔吊组合式基础 | |
CN108086307B (zh) | 钢管混凝土挖孔灌注复合微型桩 | |
CN104264708A (zh) | 一种高线旋流池地下连续墙顺施法施工工艺 | |
CN207092093U (zh) | 一种保障钢立柱垂直度的组合式结构 | |
CN110528526B (zh) | 一种人工挖孔桩钢筋笼定位及垂直度控制的方法及装置 | |
CN205444192U (zh) | 一种桥梁桩冲桩施工系统 | |
CN204435361U (zh) | 弓形铁及采用该弓形铁的桩钢筋安装结构 | |
CN109403318A (zh) | 一种海上风电植入型单桩基础及其施工方法 | |
CN210766789U (zh) | 一种人工挖孔桩钢筋笼定位及垂直度控制的装置 | |
CN115949098A (zh) | 一种软弱地质冲孔支护桩钢筋笼抗浮板结构及方法 | |
CN105926582B (zh) | 预制中空构件地下掘进施工组合体、连续墙及施工方法 | |
CN209243712U (zh) | 一种海上风电植入型单桩基础 | |
CN204960790U (zh) | 可调节筒式斜桩冲击钻具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20140409 Effective date of abandoning: 20150513 |
|
RGAV | Abandon patent right to avoid regrant |