CN203559351U - Suspended bridge overhauling workbench - Google Patents
Suspended bridge overhauling workbench Download PDFInfo
- Publication number
- CN203559351U CN203559351U CN201320725680.4U CN201320725680U CN203559351U CN 203559351 U CN203559351 U CN 203559351U CN 201320725680 U CN201320725680 U CN 201320725680U CN 203559351 U CN203559351 U CN 203559351U
- Authority
- CN
- China
- Prior art keywords
- fixed
- overhauling workbench
- operating desk
- shackles
- suspension bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 26
- 239000010959 steel Substances 0.000 claims abstract description 26
- 239000000725 suspension Substances 0.000 claims description 30
- 230000015572 biosynthetic process Effects 0.000 claims description 9
- 238000007689 inspection Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a suspended bridge overhauling workbench which comprises at least one lifting frame, two steel wire ropes and two fixation pillars. The lifting frame comprises an operation table, four connection rods and four shackles. The four corners of the operation table and the first ends of the four connection rods are fixed. The second ends of the four connection rods and the four shackles are respectively fixed. Every two shackles are fixed to one steel wire rope. Each steel wire rope and the corresponding fixation pillar are fixed. The suspended bridge overhauling workbench is simple in structure, easy to detach and install and capable of facilitating conveying.
Description
Technical field
The utility model relates to a kind of bridge testing frame, particularly relates to a kind of suspension bridge overhauling workbench.
Background technology
In order to find in time, diagnose the health status of bridge, the detection of bridge is the top priority of bridge maintenance management.Because many positions of bridge are not easy closely, the working platform that therefore will provide by Bridge Testing Equipment completes testing.
At present for inspection and the Defects Treatment of bridge superstructure bottom surface, majority is that the assembled suspension bracket of provisional steel pipe set up by bridge-checking vehicle operation or by several workmans is as operation platform.Use bridge-checking vehicle to there is cost high, and work plane is single, can not carry out the work simultaneously; It is large that the assembled suspension bracket of provisional steel pipe that use is set up by workman has suspension bracket weight, needs number of workers many, sets up speed slow.
Utility model content
The technical problems to be solved in the utility model is with a kind of simple in structure, removable suspension bridge overhauling workbench.
For addressing the above problem, the utility model provides a kind of suspension bridge overhauling workbench, described suspension bridge overhauling workbench comprises at least one suspension bracket, two wire rope and two fixed legs, described suspension bracket comprises operating desk, four connecting rods and four shackles, fix with the first end of described four connecting rods for four jiaos of described operating desk, the second end of described four connecting rods is fixed with described four shackles respectively, described every two shackles are fixed on steel cable, and described every wire rope is fixed with a fixed leg respectively.
Further, described four connecting rods are bolted on described operating desk.
Further, the first end of described every connecting rod is provided with multiple screws.
Further, described operating desk comprises four angle steel and four steel bars, a rectangle of the fixing formation of described four angle steel, and " well " word of the fixing formation of described four steel bars, described four steel bars are fixed on the rectangle of described four angle steel formation.
Further, described suspension bridge overhauling workbench also comprises place mat plate, and described place mat plate is placed on described operating desk.
The utility model suspension bridge overhauling workbench comprises four connecting rods, four shackles, operating desk, two wire rope and two fixed legs, simple in structure, and operating desk and connecting rod be bolted, and shackle simultaneously can be removed from wire rope, be convenient to install detachably, and be convenient to transportation.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model suspension bridge overhauling workbench preferred embodiments
Fig. 2 is the structural representation of suspension bracket in Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
In the present embodiment, with a suspension bracket 5, describe, in other embodiments, also can adopt two or the suspension bracket 5 of three or more.
As depicted in figs. 1 and 2, the utility model suspension bridge overhauling workbench preferred embodiments comprises suspension bracket 5, place mat plate (scheming not shown), two wire rope 4 and two fixed legs 6.Described suspension bracket 5 comprises four connecting rods 2, four shackles 3, operating desk 1, described place mat plate is placed on described operating desk 1, fix with the first end of described four connecting rods 2 for four jiaos of described operating desk 1, particularly, described four connecting rods 2 are bolted on described operating desk 1, the first paragraph of described every connecting rod 2 is provided with multiple screws, the height of the convenient operating desk 1 of adjusting; The second end of described four connecting rods 2 is fixing with described four shackles 3 respectively, and described every two shackles 3 are fixed on steel cable 4, can adjust by shackle 3 height of suspension bracket; One end of described every wire rope 4 is fixing with a fixed leg 6 respectively, and fixed leg 6 is fixed on the top of bridge 7, and the other end of described every wire rope 4 is fixed on bridge pier.
Described operating desk 1 comprises four angle steel and four steel bars, a rectangle of the fixing formation of described four angle steel, and " well " word of the fixing formation of described four steel bars, described four steel bars are fixed on the rectangle of described four angle steel formation.
The utility model suspension bridge overhauling workbench, simple in structure, be easy to dismounting and transportation, on described operating desk 1, be placed with place mat plate simultaneously, can prevent that bridge inspection and maintenance personnel from stepping on sky or stepping on leakage when work.
These are only embodiment of the present utility model; not thereby limit the scope of the claims of the present invention; every equivalent structure that utilizes the utility model manual and accompanying drawing content to do; directly or indirectly be used in other relevant technical fields, all in like manner within scope of patent protection of the present utility model.
Claims (5)
1. a suspension bridge overhauling workbench, it is characterized in that: described suspension bridge overhauling workbench comprises at least one suspension bracket, two wire rope and two fixed legs, described suspension bracket comprises operating desk, four connecting rods and four shackles, fix with the first end of described four connecting rods for four jiaos of described operating desk, the second end of described four connecting rods is fixed with described four shackles respectively, described every two shackles are fixed on steel cable, and described every wire rope is fixed with a fixed leg respectively.
2. suspension bridge overhauling workbench according to claim 1, is characterized in that: described four connecting rods are bolted on described operating desk.
3. suspension bridge overhauling workbench according to claim 2, is characterized in that: the first end of described every connecting rod is provided with multiple screws.
4. suspension bridge overhauling workbench according to claim 1, it is characterized in that: described operating desk comprises four angle steel and four steel bars, a rectangle of the fixing formation of described four angle steel, " well " word of the fixing formation of described four steel bars, described four steel bars are fixed on the rectangle of described four angle steel formation.
5. suspension bridge overhauling workbench according to claim 1, is characterized in that: described suspension bridge overhauling workbench also comprises place mat plate, and described place mat plate is placed on described operating desk.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320725680.4U CN203559351U (en) | 2013-11-14 | 2013-11-14 | Suspended bridge overhauling workbench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320725680.4U CN203559351U (en) | 2013-11-14 | 2013-11-14 | Suspended bridge overhauling workbench |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203559351U true CN203559351U (en) | 2014-04-23 |
Family
ID=50509082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320725680.4U Expired - Lifetime CN203559351U (en) | 2013-11-14 | 2013-11-14 | Suspended bridge overhauling workbench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203559351U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642049A (en) * | 2017-08-23 | 2018-01-30 | 柳州欧维姆机械股份有限公司 | A kind of device and its installation method changed for main rope of suspension bridge cord clip |
CN110497942A (en) * | 2019-09-03 | 2019-11-26 | 青岛德盛利智能装备股份有限公司 | A kind of train mobile working platform |
-
2013
- 2013-11-14 CN CN201320725680.4U patent/CN203559351U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642049A (en) * | 2017-08-23 | 2018-01-30 | 柳州欧维姆机械股份有限公司 | A kind of device and its installation method changed for main rope of suspension bridge cord clip |
CN110497942A (en) * | 2019-09-03 | 2019-11-26 | 青岛德盛利智能装备股份有限公司 | A kind of train mobile working platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201842567U (en) | Lifting frame for modular tube panel of waste heat boiler | |
CN203559351U (en) | Suspended bridge overhauling workbench | |
CN203877739U (en) | Bracket for integrally lifting air ducts | |
CN206376854U (en) | Well testing operation platform | |
CN205449380U (en) | Pulling force pressure test machine | |
CN204732751U (en) | On-load tap-changer of transformer service kit | |
CN203559352U (en) | Overhauling workbench of bridge | |
CN205381879U (en) | A lift by crane instrument for 35 -110kV isolator overhauls | |
CN203187338U (en) | Movable hoisting maintenance device | |
CN103803425A (en) | Electric hoist gantry crane | |
CN204369417U (en) | Used in nuclear power station heavy-caliber gate valve valve plate lifting device | |
CN204079401U (en) | Aloft work maintenance lift cramping arrangement | |
CN204297994U (en) | Escalator hoisting main movable stand | |
CN203612811U (en) | Horizontal module hoisting system | |
CN204265416U (en) | A kind of maintenance cage | |
CN207748738U (en) | Cyclone system integrally group to tooling | |
CN206425419U (en) | Workbench and its support component | |
CN207007391U (en) | A kind of mounting hanger verifying attachment | |
CN204509995U (en) | Bridge machinery workbench | |
CN204108387U (en) | A kind of adjustable angle Anti-slip type rig aerial platform | |
CN201142537Y (en) | Large span cable bridge rack installation mold | |
CN206901588U (en) | A kind of reinforced slidingtype fixed support | |
CN205691434U (en) | Payload security assay device | |
CN204643419U (en) | A kind of elevator installation platform test frame | |
CN203112437U (en) | Multifunctional hoisting frame for overhauling chemical equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140423 |
|
CX01 | Expiry of patent term |