CN204643419U - A kind of elevator installation platform test frame - Google Patents

A kind of elevator installation platform test frame Download PDF

Info

Publication number
CN204643419U
CN204643419U CN201520284273.3U CN201520284273U CN204643419U CN 204643419 U CN204643419 U CN 204643419U CN 201520284273 U CN201520284273 U CN 201520284273U CN 204643419 U CN204643419 U CN 204643419U
Authority
CN
China
Prior art keywords
support
guide rail
elevator installation
test frame
installation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520284273.3U
Other languages
Chinese (zh)
Inventor
蔡瑞红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Ast Building Engineering Machinery Co Ltd
Original Assignee
Guangzhou Ast Building Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Ast Building Engineering Machinery Co Ltd filed Critical Guangzhou Ast Building Engineering Machinery Co Ltd
Priority to CN201520284273.3U priority Critical patent/CN204643419U/en
Application granted granted Critical
Publication of CN204643419U publication Critical patent/CN204643419U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model provides a kind of elevator installation platform test frame, comprise the first support and the second support, described first support and second put up certain spacing and arrange, described first support is vertically provided with the first guide rail towards the side of the second support, described second support is vertically provided with the second guide rail towards the side of the first support, described first guide rail and described second guide rail are oppositely arranged, and described first support and the second support are horizontally installed with pressure-bearing pipe.The elevator installation platform test frame that the utility model provides, it can the environment of simulant elevator hoistway, thus tests operation platform and detect, and guarantees the quality of product.

Description

A kind of elevator installation platform test frame
Technical field
The utility model relates to a kind of elevator installation platform test frame.
Background technology
Elevator installation must strictly observe correctly, rational installation construction procedure, three phases can be divided in principle: first stage is the elevator foundation work will installed in elevator hoistways, subordinate phase carries out lift facility installation in place, and the phase III is that debugging is checked and accepted.In elevator installation, usually can use operation platform, platform can run up and down in elevator hoistways, with assembling elevator parts.Before formal installation, often need to test operation platform and detect, therefore need a kind of can the environment of simulant elevator hoistway with the test rack tested operation platform and detect.
Utility model content
Based on above weak point, the technical problems to be solved in the utility model is to provide a kind of elevator installation platform test frame, and it can the environment of simulant elevator hoistway, thus tests operation platform and detect, and guarantees the quality of product.
For solving above technical matters, the utility model have employed following technical scheme:
A kind of elevator installation platform test frame, comprise the first support and the second support, described first support and second put up certain spacing and arrange, described first support is vertically provided with the first guide rail towards the side of the second support, described second support is vertically provided with the second guide rail towards the side of the first support, described first guide rail and described second guide rail are oppositely arranged, described first support and the second support are horizontally installed with pressure-bearing pipe, pressure-bearing pipe is in hanging elevator operation platform, and the first guide rail and the second guide rail can simulate the slideway rising for elevator and decline.
Described first support is vertically welded with at least one first guide rail support, described first guide rail is fixedly installed on described first guide rail support, described second support is vertically welded with at least one second guide rail support, described second guide rail is fixedly installed on described second guide rail support.
The cross-sectional plane of described first guide rail and the second guide rail is T-shaped.
Described pressure-bearing pipe is galvanized welded pipe, and pressure-bearing pipe is in hanging elevator installation platform.
Described first support and the second support include four root posts of rectangular distribution, are parallel to each other between described column, are connected between adjacent upright posts by least one horizontally disposed connecting rod.
Be provided with reinforced rib between adjacent links between adjacent upright posts, described reinforced rib is arranged on the diagonal line of the rectangle that described adjacent upright posts and described adjacent links are formed.
Described first support is equal with the second support height, and described pressure-bearing pipe is welded on described first support and described second cradle top.
Adopt above technical scheme, the beneficial effect acquired by the utility model is:
The utility model provides a kind of elevator installation platform test frame, and it can the environment of simulant elevator hoistway, thus tests operation platform and detect, and guarantees the quality of product; And the first support and the second support adopt frame-shaped structure and fix further with the reinforced rib tilted, and strengthen the structural stability of the first support and the second support; And the spacing between the first support and the second support is adjustable, be applicable to the operation platform of different size, can test the operation platform of different size.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, technology of the present utility model is described in further detail:
Fig. 1 is the front view of the utility model elevator installation platform test frame;
Fig. 2 is the left view of the utility model elevator installation platform test frame.
Detailed description of the invention
A kind of elevator installation platform test frame, comprise the first support 1 and the second support 2, described first support 1 and the second support 2 one-tenth one determining deviations are arranged, described first support 1 is vertically provided with the first guide rail 3 towards the side of the second support 2, described second support 2 is vertically provided with the second guide rail 4 towards the side of the first support 1, described first guide rail 3 and described second guide rail 4 are oppositely arranged, described first support 1 and the second support 2 are horizontally installed with pressure-bearing pipe 5, pressure-bearing pipe 5 is for hanging elevator operation platform, first guide rail 3 and the second guide rail 4 can simulate the slideway rising for elevator and decline.
Wherein, described first support 1 is vertically welded with at least one first guide rail support 11, described first guide rail 3 is fixedly installed on described first guide rail support 11 by bolt, guide rail pressure code, packing ring, nut, described second support 2 is vertically welded with at least one second guide rail support 21, described second guide rail 4 is fixedly installed on described second guide rail support 21 by bolt, guide rail pressure code, packing ring, nut.First guide rail support 11 comprises welded plate, connecting panel and guide rails assembling plate, described welded plate and guide rails assembling plate are parallel to each other, welded plate is connected with guide rails assembling plate by described connecting panel, welded plate provides welding plane, guide rails assembling plate provides guide rails assembling plane, together with being convenient to the first support 1 to be firmly installed to the first guide rail 3.
Wherein, the cross-sectional plane of described first guide rail 3 and the second guide rail 4 is T-shaped, forms the guide-track groove moved up and down for operation platform.
Wherein, described pressure-bearing pipe 5 is galvanized welded pipe.
Wherein, described first support 1 and the second support 2 include four root posts 6 of rectangular distribution, be parallel to each other, connected between adjacent upright posts 6 by least one horizontally disposed connecting rod 7 between described column 6.
Wherein, reinforced rib 8 is provided with between adjacent links 7 between adjacent upright posts 6, described reinforced rib 8 is arranged on the diagonal line of the rectangle that described adjacent upright posts 6 is formed with described adjacent links 7, play the first support 1 and the stable effect of the second support 2, prevent the first support 1 and the second support 2 from tilting.
Wherein, the first support 1 is highly identical with the second support 2, and pressure-bearing pipe 5 is welded on described first support and described second cradle top.Select the pressure-bearing pipe of suitable length according to actual needs, make the spacing between the first support 1 and the second support 2 can adapt to the operation platform of different size, to test the operation platform of different size and to detect.The bottom of the first support 1, second support 2 also horizontal welding is connected to adapter plate, and described adapter plate is fixed by holding-down bolt and ground, strengthens stability and the safety of the first support 1 and the second support 2 further.
The utility model elevator installation platform test frame in use, spacing between first size adjusting first support 1 according to operation platform and the second support 2, then by holding-down bolt, the adapter plate bottom the first support 1 and the second support 2 is fixed to ground thus is fixed by described test rack, then be lifted into by operation platform on pressure-bearing pipe 5, operation platform can move up and down along the first guide rail 3 and the second guide rail 4.
Last it is noted that these are only preferred embodiment of the present utility model; be not limited to the utility model; although be described in detail the utility model with reference to embodiment; for a person skilled in the art; it still can be modified to the technical scheme described in foregoing embodiments; or equivalent replacement is carried out to wherein portion of techniques feature; but it is all within spirit of the present utility model and principle; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (7)

1. an elevator installation platform test frame, it is characterized in that: comprise the first support and the second support, described first support and the second set spacing are arranged, described first support is vertically provided with the first guide rail towards the side of the second support, described second support is vertically provided with the second guide rail towards the side of the first support, described first guide rail and described second guide rail are oppositely arranged, and described first support and the second support are horizontally installed with pressure-bearing pipe.
2. elevator installation platform test frame according to claim 1, it is characterized in that: described first support is vertically welded with at least one first guide rail support, described first guide rail is fixedly installed on described first guide rail support, described second support is vertically welded with at least one second guide rail support, described second guide rail is fixedly installed on described second guide rail support.
3. elevator installation platform test frame according to claim 2, is characterized in that: the cross-sectional plane of described first guide rail and the second guide rail is T-shaped.
4. elevator installation platform test frame according to claim 1, is characterized in that: described pressure-bearing pipe is galvanized welded pipe.
5. elevator installation platform test frame according to claim 1, it is characterized in that: described first support and the second support include four root posts of rectangular distribution, be parallel to each other between described column, connected by least one horizontally disposed connecting rod between adjacent upright posts.
6. elevator installation platform test frame according to claim 5, it is characterized in that: be provided with reinforced rib between the adjacent links between adjacent upright posts, described reinforced rib is arranged on the diagonal line of the rectangle that described adjacent upright posts and described adjacent links are formed.
7. elevator installation platform test frame according to claim 1, is characterized in that: described first support is equal with the second support height, and described pressure-bearing pipe is welded on described first support and described second cradle top.
CN201520284273.3U 2015-05-05 2015-05-05 A kind of elevator installation platform test frame Expired - Fee Related CN204643419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520284273.3U CN204643419U (en) 2015-05-05 2015-05-05 A kind of elevator installation platform test frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520284273.3U CN204643419U (en) 2015-05-05 2015-05-05 A kind of elevator installation platform test frame

Publications (1)

Publication Number Publication Date
CN204643419U true CN204643419U (en) 2015-09-16

Family

ID=54096186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520284273.3U Expired - Fee Related CN204643419U (en) 2015-05-05 2015-05-05 A kind of elevator installation platform test frame

Country Status (1)

Country Link
CN (1) CN204643419U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2016372743B2 (en) * 2015-12-15 2019-09-19 China University Of Mining And Technology Multi-rope cooperative control system testbed of ultradeep mine hoist

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2016372743B2 (en) * 2015-12-15 2019-09-19 China University Of Mining And Technology Multi-rope cooperative control system testbed of ultradeep mine hoist

Similar Documents

Publication Publication Date Title
CN204983613U (en) Hoist and mount system of cell board curtain installation
CN201680984U (en) Test bed for detecting cabinet stability and drawer slideway strength
CN106099725B (en) A kind of field use power repairing frame
CN103267565B (en) A kind of lever type steel coil online weighing measuring apparatus
CN103437563A (en) Mounting method for steel skeleton of large steel structure factory building
CN204643419U (en) A kind of elevator installation platform test frame
CN103669225A (en) Continuous beam 0# block support and installing method
CN106641461A (en) Bracket provided with three petroleum pipelines capable of being laid thereon
CN205655791U (en) Communication casing comprehensive testing equipment
CN205229193U (en) Transformer bushing's experimental support
CN104776964A (en) Simulation bracket for flow-induced vibration test of reactor internals and design method of simulation bracket
CN205333416U (en) Building board compressive strength measuring device
CN208690822U9 (en) Special maintenance platform for 66kV isolation switch
CN108252337B (en) A multifunctional stress testing device for pile foundation underpinning
CN203559351U (en) Suspended bridge overhauling workbench
CN205996834U (en) A kind of foundation bolt group is to frock
CN203392657U (en) Machine maintenance platform
CN204689525U (en) A kind of equipment jacking apparatus being convenient to measure
CN107807045A (en) A kind of compression test device and test method for concrete box culvert
CN204594645U (en) A kind of simulation support for the test of in-pile component Flow vibration
CN203109499U (en) Welding platform of escalator truss
CN210992701U (en) Operation safety device
CN218371121U (en) Double-track lifting platform test stand
CN105672135A (en) Simulation pre-pressing method for concrete box girder construction supporting frame
CN210718889U (en) Large-scale sheet metal component measuring platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916