CN203411226U - Common lifting device for cable bridge and vent pipeline - Google Patents
Common lifting device for cable bridge and vent pipeline Download PDFInfo
- Publication number
- CN203411226U CN203411226U CN201320451929.7U CN201320451929U CN203411226U CN 203411226 U CN203411226 U CN 203411226U CN 201320451929 U CN201320451929 U CN 201320451929U CN 203411226 U CN203411226 U CN 203411226U
- Authority
- CN
- China
- Prior art keywords
- common
- cable bridge
- vent pipeline
- lifting device
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a common lifting device for a cable bridge and a vent pipeline, and solves the problems that conventional cable bridge and vent pipeline are mounted on the cross beams of the conventional cable bridge and vent pipeline respectively, and two lifting rods are required by each of the conventional cable bridge and vent pipeline, so that more space is occupied, and the construction cost and the labor intensity of workers are increased. The common lifting device is characterized in that a common cross beam is fixedly connected with a left lifting rod and a right lifting rod by connecting pieces respectively; the upper ends of the left lifting rod and the right lifting rod are fixedly connected with a building ceiling by connecting pieces respectively; the cable bridge and the vent pipeline are arranged on the common cross beam; a cable is arranged in the cable bridge. The common lifting device has the benefits that as the common cross beam and the common lifting rods are adopted for forming the common lifting device, and the cable bridge and the vent pipeline are arranged on the common cross beam and lifted through the common lifting rods, one cross beam and two lifting rods can be eliminated in one lifting device, the occupied space is saved, the numbers of cross beams and lifting rods are reduced, the construction cost is lowered, the labor intensity of the workers is reduced, and the construction efficiency is improved.
Description
Technical field
The utility model belongs to construction engineering technical field, and particularly cable testing bridge and ventilator tube share hanging apparatus.
Background technology
In prior art, cable testing bridge and ventilator tube for building engineering are arranged on respectively crossbeam, cable testing bridge and ventilator tube all need 2 suspension rods separately, and crossbeam also divides and is arranged, so just need to there be 2 crossbeams and 4 suspension rods, the problem existing is, because a requirement of engineering lifts a lot of cable testing bridges and ventilator tube, therefore need the quantity of suspension rod and crossbeam a lot, cable testing bridge and ventilator tube are arranged on respectively on crossbeam separately, need again to take more space, and need to increase the quantity of crossbeam and suspension rod, not only increased construction cost, also increased workman's labour intensity.
Summary of the invention
Problem to be solved in the utility model is to overcome the deficiencies in the prior art part, provides a kind of and takes up room littlely, can reduce the cable testing bridge of cross bar and suspension rod quantity and ventilator tube and share hanging apparatus.
The technical solution adopted in the utility model comprises shared crossbeam, on described shared crossbeam, two ends, left and right are fixedly connected with left suspension rod and right suspension rod with attaching parts respectively, left suspension rod is fixedly connected with building ceiling with attaching parts respectively with right suspension rod upper end, on shared crossbeam, place cable testing bridge and ventilator tube, in cable testing bridge, place cable.
Compared with prior art, the beneficial effects of the utility model are, owing to adopting, share crossbeam and the shared hanging apparatus of shared suspension rod composition, cable testing bridge and ventilator tube are placed on and share on crossbeam, and lift by sharing suspension rod, so each group hanging apparatus can be saved 1 crossbeam and 2 suspension rods, saved and taken up room, reduced the quantity of crossbeam and suspension rod, reduced construction cost, also reduce workman's labour intensity, and improved the work efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation,
Fig. 2 is the birds-eye view of Fig. 1.
In figure:
1. share crossbeam, 2. attaching parts; 3. ventilator tube,
The left suspension rod of 4-1., the right suspension rod of 4-2.,
5. cable, 6. cable testing bridge, 7. building ceiling.
The specific embodiment
As shown in drawings, the utility model has a shared crossbeam 1, on shared crossbeam 1, two ends, left and right are fixedly connected with left suspension rod 4-1 and right suspension rod 4-2 with attaching parts 2 respectively, left suspension rod 4-1 is fixedly connected with building ceiling 7 with attaching parts 2 respectively with right suspension rod 4-2 upper end, on shared crossbeam 1, be placed with cable testing bridge 6 and ventilator tube 3, and in cable testing bridge 6, place cable 5.
Claims (1)
1. cable testing bridge and ventilator tube share hanging apparatus, comprise shared crossbeam (1), it is characterized in that, at two ends, the upper left and right of described shared crossbeam (1), use respectively attaching parts (2) to be fixedly connected with left suspension rod (4-1) and right suspension rod (4-2), left suspension rod (4-1) uses respectively attaching parts (2) to be fixedly connected with building ceiling (7) with right suspension rod (4-2) upper end, at upper cable testing bridge (6) and the ventilator tube (3) placed of shared crossbeam (1), in described cable testing bridge (6), place cable (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320451929.7U CN203411226U (en) | 2013-07-29 | 2013-07-29 | Common lifting device for cable bridge and vent pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320451929.7U CN203411226U (en) | 2013-07-29 | 2013-07-29 | Common lifting device for cable bridge and vent pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203411226U true CN203411226U (en) | 2014-01-29 |
Family
ID=49974132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320451929.7U Expired - Fee Related CN203411226U (en) | 2013-07-29 | 2013-07-29 | Common lifting device for cable bridge and vent pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203411226U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106848938A (en) * | 2017-02-17 | 2017-06-13 | 中国十七冶集团有限公司 | Cable testing bridge hanging installation method under a kind of High Altitude Platform |
-
2013
- 2013-07-29 CN CN201320451929.7U patent/CN203411226U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106848938A (en) * | 2017-02-17 | 2017-06-13 | 中国十七冶集团有限公司 | Cable testing bridge hanging installation method under a kind of High Altitude Platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203411226U (en) | Common lifting device for cable bridge and vent pipeline | |
CN202967849U (en) | Integral steel reinforcement cage lifting appliance | |
CN201704943U (en) | Straddle block combined hanging basket suspension structure | |
CN205099288U (en) | Work platform of climbing certainly from climbing device and use device | |
CN104118799A (en) | Steel tube lifting device | |
CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
CN204057696U (en) | A kind of gate type portal gantry | |
CN202771673U (en) | Training device for power transmission skill operation training | |
CN101787795B (en) | Large-size net rack suspension cable mounting platform and suspension cable construction method | |
CN104098018A (en) | Reusable multistage balance beam combination system | |
CN204138202U (en) | Cantilever crane simple and easy hoisting device | |
CN204162235U (en) | Lift crosshead safety overhauling device | |
CN204297994U (en) | Escalator hoisting main movable stand | |
CN204139571U (en) | Straddle block formula hitch | |
CN202575762U (en) | Electric lifting rod for construction elevator | |
CN201704037U (en) | Adjustable hanging basket suspension mechanism | |
CN202877835U (en) | Bearing dismounting device | |
CN204022253U (en) | The pin-connected panel suspender of factory building roof plate | |
CN203755623U (en) | Load overhauling bent frame convenient to assemble and disassemble | |
CN203255878U (en) | Lifting beam | |
CN205023729U (en) | Gallows frame | |
CN203639006U (en) | Construction device of large-span special net rack roof | |
CN204569138U (en) | A kind of set cap welding tilter | |
CN204689545U (en) | Modularized combination type voltage transformer bell jar lifting appliance | |
CN203589536U (en) | GW6-type disconnecting switch fast-assembling maintenance support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140129 Termination date: 20170729 |
|
CF01 | Termination of patent right due to non-payment of annual fee |