CN203877739U - Bracket for integrally lifting air ducts - Google Patents

Bracket for integrally lifting air ducts Download PDF

Info

Publication number
CN203877739U
CN203877739U CN201420277286.3U CN201420277286U CN203877739U CN 203877739 U CN203877739 U CN 203877739U CN 201420277286 U CN201420277286 U CN 201420277286U CN 203877739 U CN203877739 U CN 203877739U
Authority
CN
China
Prior art keywords
bracket
main body
bracket main
rectangular
airduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420277286.3U
Other languages
Chinese (zh)
Inventor
刘宏宁
谢建明
郭海锋
周游
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BOTH ENGINEERING (JIANGSU) CO.,LTD.
Both Engineering Co ltd
Original Assignee
Jiangsu Bai Cheng Engineering Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Bai Cheng Engineering Stock Co Ltd filed Critical Jiangsu Bai Cheng Engineering Stock Co Ltd
Priority to CN201420277286.3U priority Critical patent/CN203877739U/en
Application granted granted Critical
Publication of CN203877739U publication Critical patent/CN203877739U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a bracket for integrally lifting air ducts. The bracket comprises a rectangular bracket main body, more than two supports, four stand bars and more than four lifting lugs, wherein the four stand bars are fixed under two long sides of the rectangular bracket main body; the more than two supports are fixed above the two long sides of the rectangular bracket main body; and the more than four lifting lugs are fixed at the lateral side of the two long sides of the rectangular bracket main body. The bracket for integrally lifting air ducts can be applied to assembly and connection of a plurality of air ducts on the bracket; due to lifting at one time, the workload of lifting can be reduced, the working efficiency of lifting can be improved, the overhead operation time can be reduced, and the safety hazard of overhead operation can be reduced.

Description

A kind of bracket of airduct integral hoisting
Technical field
The utility model relates to the technical field of equipment hoisting, particularly relates to a kind of bracket of airduct integral hoisting.
Background technology
In airduct lifting operation process; often can run into and need to lift the airduct that length is long, bore is large; by the Hoisting Program of traditional airduct; airduct need to be saved to lifting in order by one; in lifting, also need to carry out again the work that is connected and fixed between airduct in the air; this traditional airduct slinger does that work efficiency is low, progress is slow, and because the scope of operation is aerial and needs long aerial work, job safety risk is higher.
Summary of the invention
The shortcoming of prior art in view of the above, the purpose of this utility model is to provide a kind of bracket of airduct integral hoisting, can on bracket, more piece airduct be formed a team, be connected, then disposable lifting, the work capacity that has reduced lifting has improved the work efficiency of lifting, also reduced skyborne production time, reduced the security risk of aerial work simultaneously.
For achieving the above object and other relevant objects, the utility model provides a kind of bracket of airduct integral hoisting, comprise: a rectangular bracket main body, plural support, four legs and four above suspension centres, described four legs are fixed on the below, two long limits of rectangular bracket main body, described two tops that are fixed on two long limits of rectangular bracket main body with upper bracket, described four above suspension centres are fixed on the side on two long limits of rectangular bracket main body, described bracket main body length is 8-10m, width is 0.5-1.5m, described support is 0-0.4m apart from the height of bracket main body, the two ends of described support are than the wide 0.5-1m of bracket main body, the long 0.1-1m of described suspension centre, described support foot hight is 0.1-0.5m.
Preferably, in the both ends horizontal direction of the support of telling, have rectangular through hole, the long 0.05-0.5m of through hole, is fixed with band iron in described through hole vertical direction.
As mentioned above, the utility model provides a kind of bracket of airduct integral hoisting, rectangular bracket main body uses channel-section steel or pipe to be welded, on bracket main body, be fixed with plural support, the length that is greater than single-unit airduct between support is less than the length of two joint airducts, and bracket main body is fixed with average mark along the side on two long limits and is furnished with more than four suspension centres.On bracket, more piece airduct is formed a team, connected, if desired insulation also can be incubated, outsourcing on bracket, and the airduct of installing on bracket peace levelness is high, be convenient to the integral installation of postorder, in the time that airduct is larger, can use the band iron that can be vertically fixed on support that airduct is firmly fixing.
In the actual use of bracket of airduct integral hoisting, preferably use chain block to lift, chain block is arranged on after the suspension centre on structural beams or floor, and bracket is connected on chain block, then lift, the chain block of each suspension centre need to pull lifting simultaneously, makes airduct on bracket to the absolute altitude of specifying, and formal support is arranged on airduct.
Brief description of the drawings
Fig. 1 is shown as the schematic diagram of the bracket of airduct integral hoisting of the present utility model;
Fig. 2 is shown as the local enlarged diagram of the bracket of airduct integral hoisting of the present utility model;
Label declaration
1 Bracket main body
2 Support
3 Leg
4 Suspension centre
5 Chain block
6 Band iron
7 Rectangular through hole
Detailed description of the invention
By particular specific embodiment, embodiment of the present utility model is described below, person skilled in the art scholar can understand other advantages of the present utility model and effect easily by the disclosed content of this specification sheets.
Refer to Fig. 1 and 2.Notice, appended graphic the illustrated structure of this specification sheets, ratio, size etc., all contents in order to coordinate specification sheets to disclose only, understand and read for person skilled in the art scholar, not in order to limit the enforceable qualifications of the utility model, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the utility model can produce and the object that can reach, all should still drop on the technology contents that the utility model discloses and obtain in the scope that can contain.Simultaneously, in this specification sheets, quote as " on ", the term of D score, " left side ", " right side ", " centre " and " " etc., also only for ease of understanding of narrating, but not in order to limit the enforceable scope of the utility model, the change of its relativeness or adjustment, changing under technology contents, when being also considered as the enforceable category of the utility model without essence.
Embodiment:
As illustrated in fig. 1 and 2, the utility model provides a kind of bracket of airduct integral hoisting, comprise: a rectangular bracket main body 1, three supports 2, four legs 3 and six suspension centres 4, four legs 3 are separately fixed at the below, two long limits of bracket main body 1, three supports 2 are fixed on the top on two long limits of bracket main body 1, six suspension centres 4 are fixed on the side on 1 two long limits of bracket main body, bracket main body 1 length is 10m, width is 1m, support 2 is 0.4m apart from the height of bracket main body 1, the two ends of support 1 are than the wide 0.5m of bracket main body 1, the long 0.5m of suspension centre 4, leg 3 is highly 0.3m, three supports are separately fixed at the 1m on the long limit of bracket main body, the place of 5m and 9m, on support, have rectangular through holes 7, in rectangular through holes 7, can fix band iron 6.
Above-described embodiment is illustrative principle of the present utility model and effect thereof only, but not for limiting the utility model.Any person skilled in the art scholar all can, under spirit of the present utility model and category, modify or change above-described embodiment.Therefore, have in technical field under such as and conventionally know that the knowledgeable modifies or changes not departing from all equivalences that complete under spirit that the utility model discloses and technological thought, must be contained by claim of the present utility model.

Claims (2)

1. the bracket of an airduct integral hoisting, comprise: a rectangular bracket main body, plural support, four legs and four above suspension centres, described four legs are fixed on the below, two long limits of rectangular bracket main body, described two tops that are fixed on two long limits of rectangular bracket main body with upper bracket, described four above suspension centres are fixed on the side on two long limits of rectangular bracket main body, described bracket main body length is 8-10m, width is 0.5-1.5m, described support is 0-0.4m apart from the height of bracket main body, the two ends of described support are than the wide 0.5-1m of bracket main body, the long 0.1-1m of described suspension centre, described support foot hight is 0.1-0.5m.
2. the bracket of a kind of airduct integral hoisting according to claim 1, is characterized in that, in the both ends horizontal direction of the support of telling, has rectangular through hole, and the long 0.05-0.5m of through hole is fixed with band iron in described through hole vertical direction.
CN201420277286.3U 2014-05-28 2014-05-28 Bracket for integrally lifting air ducts Expired - Fee Related CN203877739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420277286.3U CN203877739U (en) 2014-05-28 2014-05-28 Bracket for integrally lifting air ducts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420277286.3U CN203877739U (en) 2014-05-28 2014-05-28 Bracket for integrally lifting air ducts

Publications (1)

Publication Number Publication Date
CN203877739U true CN203877739U (en) 2014-10-15

Family

ID=51678266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420277286.3U Expired - Fee Related CN203877739U (en) 2014-05-28 2014-05-28 Bracket for integrally lifting air ducts

Country Status (1)

Country Link
CN (1) CN203877739U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105197825A (en) * 2015-10-29 2015-12-30 中国一冶集团有限公司 Air duct hoisting device and method
CN106144903A (en) * 2016-06-24 2016-11-23 中国十七冶集团有限公司 A kind of building airduct anti-deformation hanging apparatus and hanging method
CN107902545A (en) * 2017-11-29 2018-04-13 南通市中南建工设备安装有限公司 A kind of riding track air hose lifting construction device and construction
CN111779229A (en) * 2020-07-24 2020-10-16 中电环宇(北京)建设工程有限公司 Construction and installation method of large-scale ventilating duct

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105197825A (en) * 2015-10-29 2015-12-30 中国一冶集团有限公司 Air duct hoisting device and method
CN106144903A (en) * 2016-06-24 2016-11-23 中国十七冶集团有限公司 A kind of building airduct anti-deformation hanging apparatus and hanging method
CN107902545A (en) * 2017-11-29 2018-04-13 南通市中南建工设备安装有限公司 A kind of riding track air hose lifting construction device and construction
CN107902545B (en) * 2017-11-29 2024-01-23 南通市中南建工设备安装有限公司 Horse way air pipe hoisting construction device and construction method
CN111779229A (en) * 2020-07-24 2020-10-16 中电环宇(北京)建设工程有限公司 Construction and installation method of large-scale ventilating duct
CN111779229B (en) * 2020-07-24 2021-05-14 中电环宇(北京)建设工程有限公司 Construction and installation method of large-scale ventilating duct

Similar Documents

Publication Publication Date Title
CN203877739U (en) Bracket for integrally lifting air ducts
CN104674992A (en) Supporting method and structure of suspended steel bar truss deck
CN203845689U (en) Indoor assembled large-scale equipment hoisting device
CN202031470U (en) Movable hook ladder for construction of steel structure
CN202785364U (en) Movable dual-door-type mast hoisting device
CN204552054U (en) A kind of telescopic work high above the ground hanger bracket
CN103526918A (en) Adjustable steel pipe operation platform
CN201961967U (en) Detachable and movable type portal frame
CN202729590U (en) Movable type gantry
CN205928586U (en) Transformer bushing rest stand
CN204162235U (en) Lift crosshead safety overhauling device
CN203288162U (en) Tower-type crane simulation demonstration platform
CN204731102U (en) Multi-functional indoor structure charger
CN204532376U (en) Split type lifting construction trolley
CN203715136U (en) Tool for hoisting lifting hole cover plate in nuclear power plant
CN203755623U (en) Load overhauling bent frame convenient to assemble and disassemble
CN103287721A (en) Steel tube support
CN203613778U (en) Concrete-filled steel tube pouring platform
CN204531394U (en) Steel bar truss floor support plate suspension type support system
CN103626045A (en) Load hoisting apparatus
CN204873511U (en) Embedded trolley frame of two roof beam hoists
CN203411226U (en) Common lifting device for cable bridge and vent pipeline
CN204573552U (en) A kind of field-character shape board fastener group cover
CN103058083A (en) Bolt sphere truss elevator
CN204179792U (en) Hydro-generator lower frame inspection platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 214000 901-2-1701, Wuxi, Jiangsu

Patentee after: BOTH ENGINEERING (JIANGSU) CO.,LTD.

Address before: 214000 901-2-1701, Wuxi, Jiangsu

Patentee before: BOTH ENGINEERING (JIANGSU) CO.,LTD.

CP03 Change of name, title or address

Address after: 214000 International Center, Shanghai, Wuxi, Jiangsu Road, No. 800, F21

Patentee after: BOTH ENGINEERING Co.,Ltd.

Address before: 214000 901-2-1701, Wuxi, Jiangsu

Patentee before: BOTH ENGINEERING (JIANGSU) CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20190528

CF01 Termination of patent right due to non-payment of annual fee