CN203462722U - Floor water-proof structure of bathroom paved with floor heating equipment - Google Patents

Floor water-proof structure of bathroom paved with floor heating equipment Download PDF

Info

Publication number
CN203462722U
CN203462722U CN201320517282.3U CN201320517282U CN203462722U CN 203462722 U CN203462722 U CN 203462722U CN 201320517282 U CN201320517282 U CN 201320517282U CN 203462722 U CN203462722 U CN 203462722U
Authority
CN
China
Prior art keywords
layer
water
concrete
floor heating
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320517282.3U
Other languages
Chinese (zh)
Inventor
赵秋珺
韩峥
杨卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN201320517282.3U priority Critical patent/CN203462722U/en
Application granted granted Critical
Publication of CN203462722U publication Critical patent/CN203462722U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a floor water-proof structure of a bathroom paved with floor heating equipment, and relates to the technical fields of house building, decoration and construction. In the conventional bathroom paved with the floor heating equipment, a floor heating layer of the bathroom cannot be completely isolated from floor heating layers in other rooms by concrete water-blocking bars, water leaking from the floor heating equipment drains transversely in the bathroom and even spreads out of the bathroom. The floor water-proof structure provided by the utility model comprises a concrete base layer and concrete water-blocking bars, wherein a first water-proof layer, a heat-preserving layer, a floor heating layer, a concrete protection layer and a paved layer are formed in sequence on the concrete base layer from top to bottom; the concrete water-blocking bars are tightly contacted with the first water-proof layer. The floor water-proof structure is applied to floor water-proof engineering in bathrooms of residential spaces.

Description

A kind of ground waterproof structure that is laid with the shower house of ground warm device
Technical field
The utility model relates to building construction decoration construction technical field, particularly a kind of ground waterproof structure that is laid with the shower house of ground warm device.
Background technology
Traditional washroom heating mode is that super bath is installed, but effect is unsatisfactory, the one, while using, there is the sensation of baking; The 2nd, the high-intensity illumination of super bath easily brings out melanin to be increased, and makes skin darkening or likely causes dermal melanin cancer, is unfavorable for healthy.And adopt the mode of floor heating to warm oneself, just can enjoy comfortable warm, because floor heating is to conduct heat from bottom to top with the form of radiation by ground, and the far infrared radiation wavelength of floor heating is 8 microns~12 microns, useful to human body, and can thoroughly remove humidity and the peculiar smell of washroom.
Therefore; the construction requirement that lays ground warm device in washroom shower house is increasing; yet in practice of construction process; the pipeline of ground warm device extends into washroom shower house by other rooms; after shower house ground warm device has laid; on floor heating layer, water and smash pea gravel concreten topping, and make the concrete water bar on isolation shower house ground.But, because concrete water bar is positioned at the top of floor heating layer, if ground warm device pipeline has percolating water, shower house can produce laterally and leak, even spread to outside washroom, cause the large-area percolating water in room, this point also just washroom shower house lay the hidden danger that ground warm device exists.
Summary of the invention
In the existing washroom shower house that is laid with ground warm device, concrete water bar can not be completely isolated by shower house floor heating layer and other room floor heating layers, cause the percolating water of ground warm device in shower house, to produce and laterally to leak, even spread the problem to washroom, the purpose of this utility model is to provide a kind of ground waterproof structure that is laid with the shower house of ground warm device, shower house floor heating layer and outside floor heating layer can be isolated completely, effectively reduce the probability of happening of the horizontal seepage of shower house.
The utility model solves the technical scheme that its technical problem adopts: it comprises concrete base layer; on described concrete base layer, be provided with successively from the bottom to top the first waterproofing course, insulation layer, floor heating layer, concrete cover and paving layer, it also comprises the concrete water bar with described the first waterproofing course close contact.
Further, described concrete water bar is provided with two through the pipe fitting of described concrete water bar, and a described pipe fitting connects the water inlet pipe of described ground warm device, and pipe fitting connects the outlet pipe of described ground warm device described in another root.
Between described concrete water bar and described pipe fitting, fill waterproofing mortar.
Preferably, the height of described concrete water bar is 15cm~18cm.
Between described concrete cover and described paving layer, be provided with the second waterproofing course, and described the second waterproofing course covers on described concrete water bar.
Effect of the present utility model is: shower house waterproof ground structure of the present utility model, before floor heater laying, carry out the making of cast-in-situ concrete water bar, the water inlet pipe of ground warm device and outlet pipe pass concrete water bar by the pipe fitting being embedded in advance in concrete water bar, concrete water bar and pipe fitting are after waterproof sealing, can be completely by the underground floor heating layer isolation of the floor heating layer of shower house and other spaces, horizontal seepage impact after to a great extent shower house floor heating layer being leaked tapers to minimum, has avoided the loss causing because leaking.
Accompanying drawing explanation
Fig. 1 is the structural representation of waterproof ground structure of the shower house of laying ground warm device of the utility model one embodiment.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, a kind of waterproof ground structure of laying the shower house of ground warm device the utility model proposes is described in further detail.For sake of convenience, hereinafter described " on ", D score is consistent with the upper and lower direction of accompanying drawing, but this can not become the restriction of technical solutions of the utility model.
Ground waterproof structure of the present utility model is followed successively by concrete base layer 1, the first waterproofing course 2, insulation layer 3, floor heating layer 4, concrete cover 5 and paving layer 6 from the bottom to top; it also comprises that the on-the-spot formwork of employing waters the concrete water bar 8 of smashing, its bottom and the first waterproofing course 2 close contacts.
Further, be embedded with two pipe fittings 9 on concrete water bar 8, two parallel pipe fittings 9 connect the water inlet pipe of ground warm device through 8, pipe fittings of concrete water bar 9, and another root pipe fitting 9 connects the outlet pipe of ground warm device.The pvc pipe part of pipe fitting 9 preferred Φ 25.
Waterproofing mortar, emphasis connecting portion brushing water-repellent paint are filled in space between concrete water bar 8 and pipe fitting 9.Preferably, cast-in-situ concrete water bar 8 is made height from 5~8cm of routine, the corresponding 15~18cm that is increased to, the height that has comprised floor heating layer 4.
Between concrete cover 5 and paving layer 6, be also provided with the second waterproofing course 7, and the second waterproofing course 7 covers on concrete water bar 8.
In addition, floor heating layer 4 is to consist of the ground warm device pipeline laying and the waterproofing mortar that is filled between pipeline.Paving layer 6 is to consist of cement mortar and the ceramic tile or the marble that are pasted on its upper strata, because it is prior art content, repeats no more herein.
The work progress of the ground waterproof structure of shower house of laying ground warm device of the present utility model is as follows:
One, carry out first waterproof construction look for slope on concrete base layer 1 after, cover the first waterproofing course 2;
Two, on-the-spot formwork disturbing concrete water bar 8 on the first waterproofing course 2, and water smash before the pvc pipe material 9 of pre-buried two Φ 25, guarantee the one-in-and-one-out of ground warm device pipeline;
Three, lay insulation layer 3, on insulation layer 3, lay the pipeline of ground warm device, with waterproofing mortar, the space between pipe fitting 9 and ground heating pipe is tamped, and at keypoint part brushing water-repellent paint, form floor heating layer 4;
Four, on floor heating layer 4, water and smash pea gravel concreten formation concrete cover 5;
Five, on concrete cover 5, carry out second waterproof construction, form the second waterproofing course 7, the second waterproofing courses 7 and cover on concrete water bar 8, what guarantee floor heating layer 4 upper and lowerly respectively has waterproof construction one, does altogether twice waterproof;
Six, on the second waterproofing course 7, carry out floor tile or marmorean paving construction, form paving layer 6.
The waterproof ground structure that adopts above-mentioned construction method to make, before ground warm device lays, to carry out the making of cast-in-situ concrete water bar, the water inlet pipe of ground warm device and outlet pipe pass concrete water bar by the pipe fitting being embedded in advance in concrete water bar, concrete water bar and pipe fitting are after waterproof sealing, can be completely by the underground floor heating layer isolation of the floor heating layer of shower house and other spaces, horizontal seepage impact after to a great extent shower house floor heating layer being leaked tapers to minimum, has avoided the loss causing because leaking.
Foregoing description is only the description to the utility model preferred embodiment; the not any restriction to the utility model scope; any change, modification that the those of ordinary skill in the utility model field is done according to above-mentioned disclosure, all belong to the protection domain of claims.

Claims (5)

1. a ground waterproof structure that is laid with the shower house of ground warm device; comprise concrete base layer; on described concrete base layer, be provided with successively from the bottom to top the first waterproofing course, insulation layer, floor heating layer, concrete cover and paving layer, it is characterized in that: it also comprises the concrete water bar with described the first waterproofing course close contact.
2. ground waterproof structure according to claim 1, it is characterized in that: described concrete water bar is provided with two through the pipe fitting of described concrete water bar, a described pipe fitting connects the water inlet pipe of described ground warm device, and pipe fitting connects the outlet pipe of described ground warm device described in another root.
3. ground waterproof structure according to claim 2, is characterized in that: between described concrete water bar and described pipe fitting, fill waterproofing mortar.
4. according to the ground waterproof structure described in the arbitrary claim of claims 1 to 3, it is characterized in that: the height of described concrete water bar is 15cm~18cm.
5. ground waterproof structure according to claim 1, is characterized in that: between described concrete cover and described paving layer, be provided with the second waterproofing course, and described the second waterproofing course covers on described concrete water bar.
CN201320517282.3U 2013-08-22 2013-08-22 Floor water-proof structure of bathroom paved with floor heating equipment Expired - Lifetime CN203462722U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320517282.3U CN203462722U (en) 2013-08-22 2013-08-22 Floor water-proof structure of bathroom paved with floor heating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320517282.3U CN203462722U (en) 2013-08-22 2013-08-22 Floor water-proof structure of bathroom paved with floor heating equipment

Publications (1)

Publication Number Publication Date
CN203462722U true CN203462722U (en) 2014-03-05

Family

ID=50175094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320517282.3U Expired - Lifetime CN203462722U (en) 2013-08-22 2013-08-22 Floor water-proof structure of bathroom paved with floor heating equipment

Country Status (1)

Country Link
CN (1) CN203462722U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100011A (en) * 2014-07-29 2014-10-15 天津达因建材有限公司 Toilet floor heating waterproof construction method and toilet floor heating waterproof system
CN105442814A (en) * 2015-11-19 2016-03-30 浙江桐砚建筑规划设计有限公司 Construction method for bathroom ground structure
CN106639000A (en) * 2016-11-25 2017-05-10 绿城装饰工程集团有限公司 Dry-wet-area separation water proof structure and construction method
CN106638995A (en) * 2016-11-25 2017-05-10 绿城装饰工程集团有限公司 Bath room water blocking ridge structure and construction method
CN107100368A (en) * 2017-06-19 2017-08-29 严立栋 A kind of construction method of bathroom floor structure
CN109281357A (en) * 2018-08-30 2019-01-29 上海聚通装饰集团有限公司 A kind of concealed flowing water hole construction method of shower house dash side
CN115370104A (en) * 2022-08-12 2022-11-22 日照市水务工程建设有限公司 Waterproof partition structure in building and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100011A (en) * 2014-07-29 2014-10-15 天津达因建材有限公司 Toilet floor heating waterproof construction method and toilet floor heating waterproof system
CN105442814A (en) * 2015-11-19 2016-03-30 浙江桐砚建筑规划设计有限公司 Construction method for bathroom ground structure
CN105442814B (en) * 2015-11-19 2017-08-04 浙江桐砚建筑规划设计有限公司 A kind of construction method of bathroom floor structure
CN106639000A (en) * 2016-11-25 2017-05-10 绿城装饰工程集团有限公司 Dry-wet-area separation water proof structure and construction method
CN106638995A (en) * 2016-11-25 2017-05-10 绿城装饰工程集团有限公司 Bath room water blocking ridge structure and construction method
CN107100368A (en) * 2017-06-19 2017-08-29 严立栋 A kind of construction method of bathroom floor structure
CN109281357A (en) * 2018-08-30 2019-01-29 上海聚通装饰集团有限公司 A kind of concealed flowing water hole construction method of shower house dash side
CN115370104A (en) * 2022-08-12 2022-11-22 日照市水务工程建设有限公司 Waterproof partition structure in building and construction method

Similar Documents

Publication Publication Date Title
CN203462722U (en) Floor water-proof structure of bathroom paved with floor heating equipment
CN203834794U (en) Building heat-preservation wall board for civil engineering
CN104295009B (en) Deformation joint structure of planted roof
CN109184253A (en) A kind of method for repairing and mending of exterior wall leakage
CN207194321U (en) Roof leakage structure
CN206220272U (en) Ground hot water lays heating toilet doorway sealing damp proof insulation construction
CN206545282U (en) Toilet bathroom waterproof construction
CN205476118U (en) Hollow building block parapet
CN204850903U (en) Waterproof node structure warms up bathroom
CN205637107U (en) Formula view balcony flower pond that sinks that is fit for high residential building
CN105442814B (en) A kind of construction method of bathroom floor structure
CN206521812U (en) A kind of anti-leakage structure of toilet
CN109914484A (en) A kind of antiseep waterproof technology of basement in high rise building deformation joint
CN107090923A (en) Filled wall building construction technique at cold bridge
CN112609778A (en) Construction method for tertiary drainage
CN209082689U (en) A kind of waterproof construction between kitchen lavatory at pipe root
CN206859429U (en) With height adjustable sealing pier and its water sealing structure
CN107152089A (en) A kind of waterproof construction method on the ground for having a floor heating
CN206554180U (en) A kind of integrated water-proof chassis of toilet pipeline
CN202745372U (en) Floorslab preembedded tube improved structure
TW451019B (en) Water-proof and damp-proof method for basement side wall
CN102322131B (en) Obstructing and water retaining method for residential waterproof construction
CN206667445U (en) Bathroom floor drain waterproof node
CN204738459U (en) Multi -functional natural ecological wetland pond roof
CN205529788U (en) Rubber sidewalk for visually impaired people ceramic tile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140305