CN205529788U - Rubber sidewalk for visually impaired people ceramic tile - Google Patents

Rubber sidewalk for visually impaired people ceramic tile Download PDF

Info

Publication number
CN205529788U
CN205529788U CN201620235625.0U CN201620235625U CN205529788U CN 205529788 U CN205529788 U CN 205529788U CN 201620235625 U CN201620235625 U CN 201620235625U CN 205529788 U CN205529788 U CN 205529788U
Authority
CN
China
Prior art keywords
brick
main body
water hole
rubber
spilled water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620235625.0U
Other languages
Chinese (zh)
Inventor
赵谦宸
师聪聪
宋功业
杜峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201620235625.0U priority Critical patent/CN205529788U/en
Application granted granted Critical
Publication of CN205529788U publication Critical patent/CN205529788U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

Rubber sidewalk for visually impaired people ceramic tile belongs to building construction field for blind person's safe walking design on the pavement, rubber sidewalk for visually impaired people ceramic tile comprises with the drain pipe the brick body, the drain pipe is buried underground in the inside of the brick body, wherein, the brick body by the brick main part, lead that the blind ridge and outlet constitute, the drain pipe comprises with horizontal pipe the soil stack, lead the blind ridge and be located the surface of brick main part, be linked to be whole with the brick main part, the outlet is located surface, side and the inside of brick main part, becomes UNICOM's state, the soil stack is crossing and UNICOM with horizontal pipe mutually perpendicular, the beneficial effects of the utility model are that can be with dumped rubber make full use of, the rubber brick is compared with the stock brick has compliance and elasticity, feel is strong, makes things convenient for the blind person to discern, sets up drainage pipe, can make the rainwater get rid of fast, makes the blind person go upward in the sidewalk for visually impaired people and has good luck, have obvious sensation, and the rainy day does not have the feedwater and drench shoes.

Description

Rubber blind road floor tile
Technical field
This utility model is rubber blind road floor tile, designs for blind person walks the most safely, belongs to building Construction field.
Background technology
As accessible road design, typically designing sidewalk for visually impaired people on curb, existing sidewalk for visually impaired people is laid with common blind brick more, and With yellow colour code;Common blind brick is designed with the guide ridge, and guide-stick for blind people used for the blind is explored, but due to the material of blind-guide brick used It is as good as with common brick, for blind person, distinguishes relatively difficult;Although also having yellow colour code, but for blind person, this shape With illusory, that can distinguish between colors is not blind person;The easy hydrops of the most existing blind-guide brick, the rainy day is hydrops for blind person Also can bring inconvenience to blind person's walking;The rubber blind road floor tile that this utility model provides, can make full use of discarded rubber, Rubber brick has flexibility and elasticity compared with common brick, and texture is strong, facilitates blind person to identify, arranges drainage pipeline, can make rain Water can quickly be got rid of.
Utility model content
The specific practice of this programme is: rubber blind road floor tile as shown in Figures 1 to 5, and rubber blind road floor tile is by brick body 1 With drain pipe 2 composition;Drain pipe 2 is embedded in the inside of brick body 1;Wherein, brick body 1 by brick main body 11, the guide ridge 12 and sluices Hole 13 composition;Drain pipe 2 is made up of soil stack 21 and dewatering horizontal tube 22;The guide ridge 12 is positioned at the surface of brick main body 11, It is linked to be entirety with brick main body 11;Spilled water hole 13 is positioned at the surface of brick main body 11, side and inside, becomes UNICOM's state;Soil stack 21 are mutually perpendicular to intersect and UNICOM with dewatering horizontal tube 22.
The floor tile that brick main body 11 is made with waste old;Brick main body 11 is flat cube, and preferential recommendation uses limit A length of 600 millimeters, the size that thickness is 40 millimeters is as the size of brick main body 11;Brick main body 11 upper surface has the guide ridge 12 with vertical Downward spilled water hole 13, also there is a horizontal spilled water hole 13 four sides, vertical spilled water hole 13 intersect vertically with horizontal spilled water hole 13 and UNICOM, is respectively mounted soil stack 21 and dewatering horizontal tube 22 at vertical spilled water hole 13 with horizontal spilled water hole 13.
The guide ridge 12 is parallel to road, and the outthrust being positioned at brick main body 11 surface is linked to be entirety with brick main body 11.
Spilled water hole 13 is in the hole on brick main body 11 surface and side;Be positioned at the hole on brick main body 11 surface vertically to Under, intersect vertically and UNICOM with the hole being positioned at brick main body 11 side.
The soil stack 21 of drain pipe 2 is in inside brick body, is arranged in the internal vertical spilled water hole 13 of brick main body 11 Pipeline, intersects vertically and UNICOM with dewatering horizontal tube 22.
Dewatering horizontal tube 22 is in inside brick body, is arranged on the pipeline in brick main body 11 inner horizontal spilled water hole 13, with row Water standpipe 21 intersects vertically and UNICOM.
The beneficial effects of the utility model are to be made full use of by discarded rubber, and rubber brick has compared with common brick Flexibility and elasticity, texture is strong, facilitates blind person to identify, arranges drainage pipeline, rainwater can be made quickly to get rid of, makes blind person blind On road during walking, there is significantly sensation, and the rainy day does not have feedwater and drenches shoes.
Accompanying drawing explanation
Fig. 1 rubber blind road floor tile schematic diagram;
Fig. 2 rubber blind road floor tile floor map;
Fig. 3 rubber blind road floor tile 1-1 profile;
Fig. 4 rubber blind road floor tile 2-2 profile;
Fig. 5 rubber blind road floor tile drain pipe schematic diagram;
In figure: 1-brick body;11-brick main body;The 12-guide ridge;13-spilled water hole;2-drain pipe;21-soil stack;22-arranges Water transverse tube.
Detailed description of the invention
Certain engineering uses rubber blind road floor tile as shown in Figures 1 to 5, and rubber blind road floor tile is by brick body 1 and drain pipe 2 Composition;Drain pipe 2 is embedded in the inside of brick body 1;Wherein, brick body 1 is made up of with spilled water hole 13 brick main body 11, the guide ridge 12 's;Drain pipe 2 is made up of soil stack 21 and dewatering horizontal tube 22;The guide ridge 12 is positioned at the surface of brick main body 11, with brick main body 11 are linked to be entirety;Spilled water hole 13 is positioned at the surface of brick main body 11, side and inside, becomes UNICOM's state;Soil stack 21 and draining Transverse tube 22 is mutually perpendicular to intersect and UNICOM.
The floor tile that brick main body 11 is made with waste old;Brick main body 11 is flat cube, and using the length of side is 600 millis Rice, the size that thickness is 40 millimeters is as the size of brick main body 11;Brick main body 11 upper surface has the guide ridge 12 and letting out vertically downward Water hole 13, four sides also have horizontal spilled water hole 13, vertical spilled water hole 13 to intersect vertically and UNICOM with horizontal spilled water hole 13, are hanging down Straight spilled water hole 13 is respectively mounted soil stack 21 and dewatering horizontal tube 22 with horizontal spilled water hole 13.
The guide ridge 12 is parallel to road, and the outthrust being positioned at brick main body 11 surface is linked to be entirety with brick main body 11.
Spilled water hole 13 is in the hole on brick main body 11 surface and side;Be positioned at the hole on brick main body 11 surface vertically to Under, intersect vertically and UNICOM with the hole being positioned at brick main body 11 side.
The soil stack 21 of drain pipe 2 is in inside brick body, is arranged in the internal vertical spilled water hole 13 of brick main body 11 Pipeline, intersects vertically and UNICOM with dewatering horizontal tube 22.
Dewatering horizontal tube 22 is in inside brick body, is arranged on the pipeline in brick main body 11 inner horizontal spilled water hole 13, with row Water standpipe 21 intersects vertically and UNICOM.

Claims (6)

1. rubber blind road floor tile, is characterized in that, described floor tile is made up of with drain pipe (2) brick body (1);Drain pipe (2) buries It is located at the inside of brick body (1);Wherein, brick body (1) is made up of with spilled water hole (13) brick main body (11), the guide ridge (12);Draining Pipe (2) is made up of soil stack (21) and dewatering horizontal tube (22);The guide ridge (12) is positioned at the surface of brick main body (11), with brick master Body (11) is linked to be entirety;Spilled water hole (13) is positioned at the surface of brick main body (11), side and inside, becomes UNICOM's state;Soil stack (21) it is mutually perpendicular to intersect and UNICOM with dewatering horizontal tube (22).
Rubber blind road floor tile the most according to claim 1, is characterized in that, the brick main body (11) of brick body (1) is to use waste and old rubber The floor tile that glue is made;Brick main body (11) is flat cube, and upper surface has the guide ridge (12) and spilled water hole vertically downward (13), four sides also have horizontal spilled water hole (13), vertical spilled water hole (13) and horizontal spilled water hole (13) to intersect vertically and UNICOM, It is respectively mounted soil stack (21) and dewatering horizontal tube (22) at vertical spilled water hole (13) and horizontal spilled water hole (13).
Rubber blind road floor tile the most according to claim 1, is characterized in that, the guide ridge (12) of brick body (1) is parallel to Road, the outthrust being positioned at brick main body (11) surface is linked to be entirety with brick main body (11).
Rubber blind road floor tile the most according to claim 1, is characterized in that, the spilled water hole (13) of brick body (1) is in brick master Body (11) surface and the hole of side;It is positioned at the hole on brick main body (11) surface vertically downward, and is positioned at brick main body (11) side Hole intersect vertically and UNICOM.
Rubber blind road floor tile the most according to claim 1, is characterized in that, the soil stack (21) of drain pipe (2) is in Inside brick body, be arranged on the pipeline in the internal vertical spilled water hole (13) of brick main body (11), intersect vertically with dewatering horizontal tube (22) and UNICOM.
Rubber blind road floor tile the most according to claim 1, is characterized in that, the dewatering horizontal tube (22) of drain pipe (2) is in Inside brick body, be arranged on the pipeline in brick main body (11) inner horizontal spilled water hole (13), intersect vertically with soil stack (21) and UNICOM.
CN201620235625.0U 2016-03-25 2016-03-25 Rubber sidewalk for visually impaired people ceramic tile Expired - Fee Related CN205529788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620235625.0U CN205529788U (en) 2016-03-25 2016-03-25 Rubber sidewalk for visually impaired people ceramic tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620235625.0U CN205529788U (en) 2016-03-25 2016-03-25 Rubber sidewalk for visually impaired people ceramic tile

Publications (1)

Publication Number Publication Date
CN205529788U true CN205529788U (en) 2016-08-31

Family

ID=56784836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620235625.0U Expired - Fee Related CN205529788U (en) 2016-03-25 2016-03-25 Rubber sidewalk for visually impaired people ceramic tile

Country Status (1)

Country Link
CN (1) CN205529788U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978404A (en) * 2018-08-10 2018-12-11 泉州丰顺达金属制品有限公司 A kind of blind way brick with drain function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978404A (en) * 2018-08-10 2018-12-11 泉州丰顺达金属制品有限公司 A kind of blind way brick with drain function

Similar Documents

Publication Publication Date Title
CN106087632B (en) A kind of laying brick for having both row's water storage function based on sponge urban construction
CN205653679U (en) People moving walkways that permeates water structure of mating formation
CN204715139U (en) Quick drainage floor tile
CN104047215A (en) Method for changing cement concrete pavement into pervious concrete pavement
CN203451964U (en) Water permeable brick with double-layer structure
CN205529788U (en) Rubber sidewalk for visually impaired people ceramic tile
CN205444395U (en) Be equipped with drain pipe in hole of permeating water on pipe wall
CN204097832U (en) Multi-functional pavement bricks
CN207091853U (en) A kind of water-permeable brick for sponge city combines
CN205557244U (en) Can splice high durable environmental ecology of formula brick that permeates water
CN204282158U (en) Water drainage skid wood floor bolck
CN204780507U (en) Drainage garden way
CN205637107U (en) Formula view balcony flower pond that sinks that is fit for high residential building
CN104805746A (en) Water drainage floor tile
CN203007773U (en) Outdoor drainage floor tile
CN204311545U (en) Equipment pump house equipment Foundations surrounding ground reserves drainage groove structure
CN206784095U (en) A kind of town and country gardens anti-slip type water-permeable brick
CN209099097U (en) A kind of novel water permeable floor tile
CN203452323U (en) Bathroom floor decoration structure
CN203160086U (en) Waterless pavement device
CN204112188U (en) A kind of disjunctor pavior brick
CN207362974U (en) A kind of urban road rain water collecting system
CN204738199U (en) Water guide type floor tile
CN203361495U (en) Drainage step for greening
CN203008112U (en) Resin concrete drainage ditch with water-in slot

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20170325

CF01 Termination of patent right due to non-payment of annual fee