A kind of greening drainage step
Technical field
The utility model relates to step, relates in particular to a kind of greening drainage step.
Background technology
Existing not with the step of greening configuration, the stone material consumption is very big.Simultaneously, existing step forms by the multilayer stone material is layer upon layer of, and lines are stiff, and dull the repetition, very easily produce aestheticly tired; When current also susceptible to more tired out.
And the step of at present band greening configuration, its ledge structure needs segment processing, lacks globality, very easily produces differential settlement, and causes crack, the situation such as concavo-convex, and difficulty in walking, easily cause danger; In addition, the construction of this step not only needs a large amount of manpowers, and stay in place formwork consumption is also larger, also has constructional difficulties and is difficult to guarantee the shortcoming of anaphase effect.
In addition, existing step mostly is and is horizontally disposed with, and often without draining and non-skid feature, very easily occurs that ponding, rainy day skid, spatter with water the phenomenons such as sole.Even Drainage Design is arranged, also often because stopping up, the draining lines cause former design failure.
Summary of the invention
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of simple structure, and drainage effect is good, the greening drainage step that can beautify the environment again.
A kind of greening drainage step of the utility model, it comprises the step slabstone that two rank are above, described step slabstone inwards is provided with greenbelt along its long side direction, the greenbelt base plate is provided with planting groove, the planting groove bottom is provided with outfall, and planting groove one end is provided with the base plate that same stage rank slabstone is fixed in an extension; The other end of planting groove is provided with the bottom that single order step slabstone is fixed in another extension, and water dropping openings is formed on the bottom of this extension and upper stage rank slabstone.
The utility model can also be another kind of scheme: a kind of greening drainage step, it comprises the step slabstone that two rank are above, described step slabstone inwards is provided with greenbelt along the two ends of its long side direction, the greenbelt base plate is provided with planting groove, the planting groove bottom is provided with outfall, and planting groove one end is provided with the base plate that same stage rank slabstone is fixed in an extension; The other end of planting groove is provided with the bottom that single order step slabstone is fixed in another extension, and water dropping openings is formed on the bottom of this extension and upper stage rank slabstone.The utility model is no matter be along its long side direction, greenbelt inwards to be set at step slabstone, perhaps at the two ends along its long side direction, greenbelt inwards is set, all have advantages of following: guaranteeing under ledge structure globality and normal current prerequisite, can beautify the environment, the stiff sense that softening hard step slabstone forming belt comes, can increase urban green coverage rate again, large tracts of land is used can also improve air quality, low-carbon energy-saving.
The present invention adopts planting groove to be planted greenbelt, and planting groove is arranged between upper and lower two stage rank slabstones, has simplified the construction technology of greening step, save the use amount of slabstone, reduced the construction cost of greening step, also saved a large amount of manpowers, guaranteed that anaphase effect is attractive in appearance simultaneously.
The utility model planting groove other end arranges the bottom that extension is fixed on single order step slabstone, water dropping openings is formed on the bottom of this extension and upper stage rank slabstone, rainwater is trampled face and water dropping openings through step, flow in greenbelt, a rainwater part is retained in the soil of greenbelt, a part is infiltrated the planting groove bottom, beyond outfall and gutter discharge step by the planting groove base plate.Solve the problem that the rain backward step is trampled area water and skidded, fall down the generation that waits fortuitous event as far as possible while reducing pedestrian (especially old man and child) up/down steps, the raising pedestrian safety factor of walking.
Be provided with the PVC dividing plate between described greenbelt and same stage rank, described PVC dividing plate exceeds step slabstone 2-7cm, can prevent that the planting soil in greenbelt runs off.
The outfall of described planting groove bottom is connected with and extends into underground gutter, by this outfall and gutter, water unnecessary in planting groove can be drained.
Described step slabstone is along its width downward-sloping 1-3 ° from inside to outside, thereby the ponding of being convenient to step is trampled on face enters in greenbelt.
Described step slabstone bottom is provided with cement sand bed, is convenient to fixedly step slabstone.
Described planting groove is the stainless steel moulding, and it makes simple, easy for installation.
Adopt greening drainage step of the present utility model, greenbelt inwards is set or along the two ends of its long side direction, greenbelt inwards is set along its long side direction at step slabstone, guaranteeing under ledge structure globality and normal current prerequisite, can beautify the environment, the stiff sense that softening hard step slabstone forming belt comes, can increase urban green coverage rate again.Can in time step be trampled again to ponding on face discharges beyond step by greenbelt simultaneously.Solve the problem that the rain backward step is trampled area water and skidded, fall down the generation that waits fortuitous event as far as possible while reducing pedestrian (especially old man and child) up/down steps, the raising pedestrian safety factor of walking.
The accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
The side sectional view that Fig. 1 is the utility model greening drainage step;
The partial enlarged drawing that Fig. 2 is the utility model Fig. 1;
The top view of the step slabstone that Fig. 3 is the utility model embodiment 1;
The top view of the step slabstone that Fig. 4 is the utility model embodiment 2;
The side sectional view that Fig. 5 is the utility model planting groove.
The specific embodiment
Embodiment 1
As shown in Fig. 1,2,3, one of 5, a kind of greening drainage step of the utility model, it comprises the step slabstone 1 that two rank are above, described step slabstone 1 inwards is provided with greenbelt 2 along its long side direction, greenbelt 2 base plates are provided with planting groove 3, planting groove 3 bottoms are provided with outfall 31, planting groove 3 one ends are provided with the base plate that same stage rank slabstone 1 is fixed in an extension 32, the other end of planting groove 3 is provided with the bottom that single order step slabstone 1 is fixed in another extension 33, and this extension 33 forms water dropping openings 4 with the bottom of upper stage rank slabstone 1.
Embodiment 2
As shown in Fig. 1,2,4, one of 5, a kind of greening drainage step, it comprises the step slabstone 1 that two rank are above, described step slabstone 1 inwards arranges greenbelt 2 along the two ends of its long side direction, greenbelt 2 base plates are provided with planting groove 3, planting groove 3 bottoms are provided with outfall 31, planting groove 3 one ends are provided with the base plate that same stage rank slabstone 1 is fixed in an extension 32, the other end of planting groove 3 is provided with the bottom that single order step slabstone 1 is fixed in another extension 33, and this extension 33 forms water dropping openings 4 with the bottom of upper stage rank slabstone 1.No matter, in embodiment 1 or embodiment 2, described greenbelt 2 and 1 of same stage rank slabstone are provided with PVC dividing plate 5, described PVC dividing plate 5 exceeds step slabstone 2-7cm, can prevent that the planting soil in greenbelt 2 runs off.
The outfall 31 of described planting groove 3 bottoms is connected with and extends into underground gutter 6, by this outfall 31 and gutter 6, water unnecessary in planting groove 3 can be drained.
Described step slabstone 1 is along its width downward-sloping 1-3 ° from inside to outside, thereby the ponding of being convenient to step is trampled on face enters in greenbelt 2.
Described step slabstone 1 bottom is provided with cement sand bed 7, is convenient to fixedly step slabstone 1.
Described planting groove 3 is the stainless steel moulding, and it makes simple, easy for installation.
The greening implementation procedure of the greening drainage step of the utility model embodiment 1 or embodiment 2 is: filling planting soil, the haydite planting soil as greenbelt 2 such as native in the stainless steel planting groove 3 with outfall 31, in planting soil, can plant grass planting, fern, the plants such as quilt.Simultaneously, PVC dividing plate 5 is arranged between the planting soil of step stone material 1 and greenbelt 2, can prevent that planting soil runs off.
The draining implementation procedure of the greening drainage step of the utility model embodiment 1 or embodiment 2 is: due to step slabstone 1 along its width downward-sloping 1-3 ° from inside to outside, rainwater is trampled face and water dropping openings 4 through step, flow in the greenbelt 2 of planting groove 3, its part is retained in the planting soil of greenbelt 2, a part is infiltrated planting groove 3 bottoms, and beyond outfall 31 and connected gutter 6 discharge steps by planting groove 3 bottoms.