CN109281357A - A kind of concealed flowing water hole construction method of shower house dash side - Google Patents

A kind of concealed flowing water hole construction method of shower house dash side Download PDF

Info

Publication number
CN109281357A
CN109281357A CN201811006115.6A CN201811006115A CN109281357A CN 109281357 A CN109281357 A CN 109281357A CN 201811006115 A CN201811006115 A CN 201811006115A CN 109281357 A CN109281357 A CN 109281357A
Authority
CN
China
Prior art keywords
shower
flowing water
ground
construction
concealed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811006115.6A
Other languages
Chinese (zh)
Other versions
CN109281357B (en
Inventor
张炳生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shanghai Architectural Decoration Engineering Co ltd
Original Assignee
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JUTONG DECORATION GROUP Co Ltd filed Critical SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority to CN201811006115.6A priority Critical patent/CN109281357B/en
Publication of CN109281357A publication Critical patent/CN109281357A/en
Application granted granted Critical
Publication of CN109281357B publication Critical patent/CN109281357B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of concealed flowing water hole construction methods of shower house dash side, are related to technical field of buildings, Step 1: construction positioning: the positioning of shower position, floor heating construction limit are carried out on horizontal line, ground finished surface;Step 2: construction limit ruler: completing height according to ground and calculate, has acclive flowing water mouth on gutter channel at combination water bar, flowing water mouth and outer ground line gradient are consistent, flowing water trough rim interface hides processing, and the height of acclive discharge orifice and the acclive shower groove in shower limits ruler, the globality gradient is penetrated through to the minimum point of shower collector nozzle;Step 3: construction process: ground waterproof, detection;The levelling construction of floor heating except shower;Combination water bar is horizontally mounted;The ground paving of shower center;Take a shower groove and floor drain installation;Outer ground connect paving with gutter channel.The present invention has the outer surface flow water gradient that takes a shower smooth, and floor tile interface splices the advantages of smooth, entirety is without ponding, has good practical function.

Description

A kind of concealed flowing water hole construction method of shower house dash side
Technical field
The present invention relates to technical field of buildings, specifically a kind of concealed flowing water hole construction method of shower house dash side.
Background technique
Requirement of the modern house to bathroom facility is higher and higher, and many families have been intended to an independent bath space, But since room sanitary space is limited, Bathing apparatus and sanitary ware can only be placed in a Room.Shower house makes full use of interior one Angle is clearly marked off shower area to form relatively independent bath space with fence.
Existing shower house flowing water hole construction method is the following steps are included: one, tradition positioning, no finished surface positioning;Two, it passes System size: not doing and calculate, when paving random grade;Three, traditional construction: ground waterproof, water bar installation, inside and outside floor drain, ground Leak borehole, ground paving.Therefore there are the multi-direction gradient paving of floor tile, interface injustice, floor drain installation, cutting borehole are crude to be lacked Point.
Summary of the invention
The purpose of the present invention is to provide a kind of concealed flowing water hole construction methods of shower house dash side, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of concealed flowing water hole construction method of shower house dash side, comprising the following steps:
Step 1: construction positioning: carrying out the positioning of shower position, floor heating construction limit on horizontal line, ground finished surface;
Step 2: construction limit ruler: completing height according to ground and calculate, combine on the gutter channel at water bar and have acclive flowing water Mouthful, flowing water mouth and outer ground line gradient are consistent, and flowing water trough rim interface hides processing, and acclive discharge orifice and having in shower The height of the shower groove of the gradient limits ruler, and the globality gradient is penetrated through to the minimum point of shower collector nozzle;
Step 3: construction process:
1, ground waterproof, detection;
2, the levelling construction of floor heating except taking a shower;
3, combination water bar is horizontally mounted;
4, take a shower the paving of center ground;
5, take a shower groove and floor drain installation;
6, outer ground connect paving with gutter channel.
As further scheme of the invention: the shower groove is located in the groove on the first screed.
As further scheme of the invention: its lap of first screed is shower floor.
As the present invention further scheme: the combination water bar by set gradually from bottom to up waterproof layer, Warm layer, the second screed, brick layer and with waterproof layer, floor heating layer, the second screed, the water bar composition that connect of brick layer.
As further scheme of the invention: the diameter of the discharge orifice is 16mm.
Compared with prior art, the beneficial effects of the present invention are: the present invention has the outer surface flow water gradient that takes a shower smooth, ground Brick interface splices the advantages of smooth, entirety is without ponding, has good practical function.
Detailed description of the invention
Fig. 1 is a kind of completion schematic diagram of the concealed flowing water hole construction method of shower house dash side.
In figure: 1- waterproof layer, 2- floor heating layer, 3- water fender, 4- shower floor, 5- shower, 6- brick layer, 7- gutter channel, The discharge orifice 8-, the second screed of 9-, the first screed of 10-.
Specific embodiment
Combined with specific embodiments below, technical scheme in the embodiment of the invention is clearly and completely described, shows So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the reality in the present invention Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to In the scope of protection of the invention.
A kind of concealed flowing water hole construction method of shower house dash side, as shown in Figure 1, comprising the following steps:
Step 1: construction positioning: carrying out the positioning of shower position, floor heating construction limit on horizontal line, ground finished surface;
Step 2: construction limit ruler: completing height according to ground and calculate, combine on the gutter channel 7 at water bar 3 and have acclive stream The mouth of a river 8, flowing water mouth 8 and outer ground line gradient are consistent, and 7 side interface of gutter channel hides processing, and acclive discharge orifice 8 and shower The height of interior acclive shower groove 5 limits ruler, and the globality gradient is penetrated through to the minimum point of shower collector nozzle;
Step 3: construction process:
1, ground waterproof, detection;
2, the levelling construction of floor heating except taking a shower;
3, combination water bar 3 is horizontally mounted;
4, take a shower the paving of center ground;
5, take a shower groove and floor drain installation;
6, outer ground connect paving with gutter channel 7.
Shower groove 5 is located in the groove on the first screed 10.
Its lap of first screed 10 is shower floor 4, and combination water bar 3 is by the waterproof layer that sets gradually from bottom to up 1, floor heating layer 2, the second screed 9, brick layer 6 and with waterproof layer 1, floor heating layer 2, the second screed 9, the gear that connect of brick layer 6 Water bar composition, the diameter of discharge orifice 8 are 16mm.
The present invention has the outer surface flow water gradient that takes a shower smooth, and floor tile interface splices the advantages of smooth, entirety is without ponding, tool There is good practical function.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of concealed flowing water hole construction method of shower house dash side, which comprises the following steps:
Step 1: construction positioning: carrying out the positioning of shower position, floor heating construction limit on horizontal line, ground finished surface;
Step 2: construction limit ruler: completing height according to ground and calculate, there is the gradient on the gutter channel (7) at combination water bar (3) Flowing water mouth (8), flowing water mouth (8) and outer ground line gradient are consistent, and gutter channel (7) side interface hides processing, and acclive stream The height of water hole (8) and the acclive shower groove (5) in shower limits ruler, and the globality gradient is penetrated through to shower collector nozzle most Low spot;
Step 3: construction process:
Ground waterproof, detection;
The levelling construction of floor heating except shower;
Combination water bar (3) is horizontally mounted;
The ground paving of shower center;
Take a shower groove and floor drain installation;
Outer ground connect paving with gutter channel (7).
2. the concealed flowing water hole construction method of shower house dash side according to claim 1, which is characterized in that the shower Groove (5) is located in the groove on the first screed (10).
3. the concealed flowing water hole construction method of shower house dash side according to claim 2, which is characterized in that described first Its lap of screed (10) is shower floor (4).
4. the concealed flowing water hole construction method of shower house dash side according to claim 1 to 3, which is characterized in that institute State combination water bar (3) by set gradually from bottom to up waterproof layer (1), floor heating layer (2), the second screed (9), brick layer (6) and with waterproof layer (1), floor heating layer (2), the second screed (9), the water bar that connect of brick layer (6) form.
5. the concealed flowing water hole construction method of shower house dash side according to claim 1 to 3, which is characterized in that institute The diameter for stating discharge orifice (8) is 16mm.
CN201811006115.6A 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room Active CN109281357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811006115.6A CN109281357B (en) 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811006115.6A CN109281357B (en) 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room

Publications (2)

Publication Number Publication Date
CN109281357A true CN109281357A (en) 2019-01-29
CN109281357B CN109281357B (en) 2021-07-30

Family

ID=65183217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811006115.6A Active CN109281357B (en) 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room

Country Status (1)

Country Link
CN (1) CN109281357B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08254027A (en) * 1995-03-15 1996-10-01 Toto Ltd Unit room for hospital
CN202658843U (en) * 2012-06-27 2013-01-09 中建七局建筑装饰工程有限公司 Ponding preventing shower cubicle ground
CN203302958U (en) * 2013-04-25 2013-11-27 刘勇 Water stopping groove for bath curtain bathroom
CN203462722U (en) * 2013-08-22 2014-03-05 上海建工一建集团有限公司 Floor water-proof structure of bathroom paved with floor heating equipment
CN206233389U (en) * 2016-11-25 2017-06-09 绿城装饰工程集团有限公司 A kind of separating dry space from moist space waterproof construction
CN206545282U (en) * 2017-02-20 2017-10-10 上海东稻建设有限公司 Toilet bathroom waterproof construction
CN206607692U (en) * 2017-02-27 2017-11-03 绿城装饰工程集团有限公司 Shower house water-blocking bank structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08254027A (en) * 1995-03-15 1996-10-01 Toto Ltd Unit room for hospital
CN202658843U (en) * 2012-06-27 2013-01-09 中建七局建筑装饰工程有限公司 Ponding preventing shower cubicle ground
CN203302958U (en) * 2013-04-25 2013-11-27 刘勇 Water stopping groove for bath curtain bathroom
CN203462722U (en) * 2013-08-22 2014-03-05 上海建工一建集团有限公司 Floor water-proof structure of bathroom paved with floor heating equipment
CN206233389U (en) * 2016-11-25 2017-06-09 绿城装饰工程集团有限公司 A kind of separating dry space from moist space waterproof construction
CN206545282U (en) * 2017-02-20 2017-10-10 上海东稻建设有限公司 Toilet bathroom waterproof construction
CN206607692U (en) * 2017-02-27 2017-11-03 绿城装饰工程集团有限公司 Shower house water-blocking bank structure

Also Published As

Publication number Publication date
CN109281357B (en) 2021-07-30

Similar Documents

Publication Publication Date Title
CN205171922U (en) Box of split type waterproof end
CN103485509A (en) Waterproof structure manufacturing method of caisson-type toilet
CN105604290A (en) Split type waterproof bottom case
CN103938679A (en) Drainage riser connector of caisson-type toilet
CN109281357A (en) A kind of concealed flowing water hole construction method of shower house dash side
CN205935444U (en) Dark drainage structures of stone material tiling dress roofing
CN208718112U (en) Novel anti-ponding structure based on toilet geothermal heating ground surface finishing
CN204850903U (en) Waterproof node structure warms up bathroom
CN207499071U (en) toilet
CN205063051U (en) End box on ground between whole bathroom
CN208533644U (en) Anti-overflow caisson of toilet with novel water drainage structure
CN209595607U (en) A kind of concealed flowing water pore structure of shower house dash side
CN109296169A (en) A kind of shower house construction method of ground
CN203821521U (en) Soil stack connection piece for caisson type toilet
CN108005216A (en) A kind of floor drain system and its construction method
CN203782856U (en) Floor drain structure
CN210151964U (en) Toilet waterproof structure
CN201420394Y (en) Die for making pipeline reserved holes
CN206205162U (en) A kind of assembled water-proof structure
CN105442814A (en) Construction method for bathroom ground structure
CN205153392U (en) Install ceramic tile structure of floor drain fast
CN202899285U (en) Waterproof structure of floor drain
CN105465482A (en) Multi-functional pipeline positioning device
CN203821522U (en) Caisson secondary water discharging system with air returning pipeline
CN207296027U (en) A kind of ground obtuse angle water guide structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230508

Address after: Room 318, Building 8, No. 68 Dongheyan, Chengqiao Town, Chongming District, Shanghai, 202150 (Shanghai Chengqiao Economic Development Zone)

Patentee after: Shanghai Shanghai Architectural Decoration Engineering Co.,Ltd.

Address before: No.15, Lane 300, Dezhou Road, Pudong New Area, Shanghai, 200126

Patentee before: SHANGHAI JUTONG DECORATION GROUP Co.,Ltd.