CN109296169A - A kind of shower house construction method of ground - Google Patents
A kind of shower house construction method of ground Download PDFInfo
- Publication number
- CN109296169A CN109296169A CN201811003671.8A CN201811003671A CN109296169A CN 109296169 A CN109296169 A CN 109296169A CN 201811003671 A CN201811003671 A CN 201811003671A CN 109296169 A CN109296169 A CN 109296169A
- Authority
- CN
- China
- Prior art keywords
- ground
- gutter channel
- metope
- low level
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Hydrology & Water Resources (AREA)
- Water Supply & Treatment (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Public Health (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Electromagnetism (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of shower house construction method of ground, it is related to technical field of buildings, the following steps are included: Step 1: limit ruler positioning: detection ground squareness, the vertical flatness of metope, metope finished surface, water bar, low level gutter channel, high-order gutter channel, ground center limit size, and downcomer is displaced to metope edge low level gutter channel, among high-order gutter channel;Step 2: early period constructs: downcomer antiseepage perforations adding, ground line gradient is levelling, and ground processes waterproof layer, and the wall brick of metope eminence limit inlays patch;Step 3: stock processing: ground center V-arrangement sink is drawn squares, and low level flowing water groove width is consistent with the size of floor drain hem width;The present invention has center Land leveling, V-groove aproll, and gutter channel is unobstructed, equivalent width, the advantage for details exquisiteness of constructing, with good practical function.
Description
Technical field
The present invention relates to technical field of buildings, specifically a kind of shower house construction method of ground.
Background technique
Requirement of the modern house to bathroom facility is higher and higher, and many families have been intended to an independent bath space,
But since room sanitary space is limited, Bathing apparatus and sanitary ware can only be placed in a Room.Shower house makes full use of interior one
Angle is clearly marked off shower area to form relatively independent bath space with fence.
Traditional shower house construction method of ground is the following steps are included: one, muddled positioning: sewer pipe mouth does not limit, processing
Size (gutter channel ultra-wide) is at will fixed;Two, early period constructs: wall brick paving, which covers, is lauched half of nozzle;Three, it construction and installation: 1, keeps off
Water installation, 2, downcomer excision, floor drain deviation be lauched tube hub, 3, surrounding gutter channel slope, 4, center ground finally installs.Cause
This there are the out-of-flatness of center ground, corner slurry seam it is coarse, flowing water groove width is inconsistent, is lauched obstructed, drain cover deviation, (wall brick
Or ground cover floor drain) cleaning inconvenience is taken out, the shortcomings that leakage downstairs.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of shower house construction method of ground
Problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of shower house construction method of ground, comprising the following steps:
Step 1: limit ruler positioning: detection ground squareness, the vertical flatness of metope, metope finished surface, water bar, low level flowing water
Slot, high-order gutter channel, ground center limit size, and downcomer is displaced to metope edge low level gutter channel, among high-order gutter channel;
Step 2: early period constructs: downcomer antiseepage perforations adding, ground line gradient is levelling, and ground processes waterproof layer, the limit of metope eminence
Wall brick edge patch;
Step 3: stock processing: ground center V-arrangement sink is drawn squares, and low level flowing water groove width is consistent with the size of floor drain hem width;
Step 4: construction and installation:
1, water bar center ground, horizontal limit ruler, precision installation;
2, the water flow mouth of floor drain, be inserted in the sewer pipe mouth for moving past position, be mounted on low level flowing water trough slope minimum point, floor drain side with
Low level gutter channel after the completion of construction is the same as wide;
3, high-order gutter channel highest point is lower than center ground 6mm, every meter tiltedly spread by 5mm it is concordant to floor drain face.
As further scheme of the invention: the low level flowing water trough slope is every meter of 5mm gradient.
As further scheme of the invention: the diameter of the downcomer is 50mm.
As further scheme of the invention: being equipped with adhesive layer between the metope and wall brick.
As further scheme of the invention: the lower part of the wall brick is equipped with the rear benefit wall being connected on adhesive layer
Face.
As further scheme of the invention: the top of the waterproof layer is equipped with screed.
As further scheme of the invention: the screed top is affixed with marble layer.
As further scheme of the invention: the marble layer top offers anti-quick water chamfered groove.
Compared with prior art, the beneficial effects of the present invention are: the present invention has center Land leveling, V-groove aproll, stream
Sink is unobstructed, equivalent width, the advantage for details exquisiteness of constructing, with good practical function.
Detailed description of the invention
Fig. 1 is a kind of completion schematic diagram of shower house construction method of ground.
In figure: mending metope, the ground 5-, 6- waterproof layer, 7- screed, 8- after 1- metope, 2- adhesive layer, 3- wall brick, 4-
Marble layer, 9- low level gutter channel, 10- floor drain, 11- downcomer, 12- high position gutter channel, 13- water bar.
Specific embodiment
Combined with specific embodiments below, technical scheme in the embodiment of the invention is clearly and completely described, shows
So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the reality in the present invention
Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to
In the scope of protection of the invention.
A kind of shower house construction method of ground, as shown in Figure 1, comprising the following steps:
Step 1: limit ruler positioning: detection 5 squareness of ground, the vertical flatness of metope 1,1 finished surface of metope, water bar 13, low level
Gutter channel 9, high-order gutter channel 12,5 center of ground limit size, and downcomer 11 is displaced to 1 edge low level gutter channel 9 of metope, height
Among bit stream sink 12;
Step 2: early period constructs: 11 antiseepage perforations adding of downcomer, 5 gradient of ground is levelling, and ground 5 processes waterproof layer 6,1 eminence of metope
The wall brick 3 of limit inlays patch;
Step 3: stock processing: 5 center V-arrangement sink of ground is drawn squares, and low level gutter channel 9 is wide consistent with the size of 10 hem width of floor drain;
Step 4: construction and installation:
1,13 center ground of water bar, horizontal limit ruler, precision installation;
2, the water flow mouth of floor drain 10, be inserted in 11 mouthfuls of downcomer for moving past position, be mounted on 9 gradient minimum point of low level gutter channel, ground
Leak the same width of low level gutter channel 9 after the completion of 10 sides and construction;
3, high-order 12 highest point of gutter channel is lower than center ground 6mm, every meter tiltedly spread by 5mm it is concordant to floor drain face.
9 gradient of low level gutter channel is every meter of 5mm gradient, and the diameter of downcomer 11 is 50mm, is set between metope 1 and wall brick 3
There is adhesive layer 2, the lower part of wall brick 3 is equipped with the rear benefit metope 4 being connected on adhesive layer 2, and the top of waterproof layer 6 is equipped with mortar
Layer 7,7 top of screed is affixed with marble layer 8, and 8 top of marble layer offers anti-quick water chamfered groove.
The present invention has center Land leveling, V-groove aproll, and gutter channel is unobstructed, equivalent width, exquisite excellent of construction details
Point has good practical function.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (8)
1. a kind of shower house construction method of ground, which comprises the following steps:
Step 1: limit ruler positioning: detection ground (5) squareness, metope (1) vertical flatness, metope (1) finished surface, water bar
(13), low level gutter channel (9), high-order gutter channel (12), ground (5) center limit size, and downcomer (11) is displaced to metope (1)
Edge low level gutter channel (9), high-order gutter channel (12) are intermediate;
Step 2: early period constructs: downcomer (11) antiseepage perforations adding, ground (5) gradient is levelling, and ground (5) process waterproof layer (6),
The wall brick (3) of metope (1) eminence limit inlays patch;
Step 3: stock processing: ground (5) center V-arrangement sink is drawn squares, the wide ruler with floor drain (10) hem width of low level gutter channel (9)
It is very little consistent;
Step 4: construction and installation:
Water bar (13) center ground, horizontal limit ruler, precision installation;
The water flow mouth of floor drain (10) is inserted in downcomer (11) mouth for moving past position, and it is minimum to be mounted on low level gutter channel (9) gradient
Low level gutter channel (9) after the completion of point, floor drain (10) side and construction is the same as wide;
High-order gutter channel (12) highest point be lower than center ground 6mm, every meter tiltedly spread by 5mm it is concordant to floor drain face.
2. shower house construction method of ground according to claim 1, which is characterized in that low level gutter channel (9) gradient
For every meter of 5mm gradient.
3. shower house construction method of ground according to claim 1, which is characterized in that the diameter of the downcomer (11) is
50mm。
4. shower house construction method of ground according to claim 1 to 3, which is characterized in that the metope (1) and wall
Adhesive layer (2) are equipped between brick (3).
5. shower house construction method of ground according to claim 4, which is characterized in that the lower part of the wall brick (3) is equipped with
The rear benefit metope (4) being connected on adhesive layer (2).
6. shower house construction method of ground according to claim 1 to 3, which is characterized in that the waterproof layer (6)
Top is equipped with screed (7).
7. shower house construction method of ground according to claim 6, which is characterized in that screed (7) the top paving
There are marble layer (8).
8. shower house construction method of ground according to claim 7, which is characterized in that open on marble layer (8) top
Equipped with anti-quick water chamfered groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811003671.8A CN109296169A (en) | 2018-08-30 | 2018-08-30 | A kind of shower house construction method of ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811003671.8A CN109296169A (en) | 2018-08-30 | 2018-08-30 | A kind of shower house construction method of ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109296169A true CN109296169A (en) | 2019-02-01 |
Family
ID=65165971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811003671.8A Pending CN109296169A (en) | 2018-08-30 | 2018-08-30 | A kind of shower house construction method of ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109296169A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113463873A (en) * | 2021-06-23 | 2021-10-01 | 浙江中天精诚装饰集团有限公司 | Fast-assembling type shower floor stone and paving method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202380527U (en) * | 2011-12-23 | 2012-08-15 | 中建七局第二建筑有限公司 | Bathroom drainage structure |
CN202658843U (en) * | 2012-06-27 | 2013-01-09 | 中建七局建筑装饰工程有限公司 | Ponding preventing shower cubicle ground |
CN104452981A (en) * | 2014-12-26 | 2015-03-25 | 苏州金螳螂住宅集成装饰有限公司 | Restroom water-seepage-preventing construction structure and construction method thereof |
CN206607659U (en) * | 2017-02-27 | 2017-11-03 | 绿城装饰工程集团有限公司 | A kind of shower house discharge structure |
-
2018
- 2018-08-30 CN CN201811003671.8A patent/CN109296169A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202380527U (en) * | 2011-12-23 | 2012-08-15 | 中建七局第二建筑有限公司 | Bathroom drainage structure |
CN202658843U (en) * | 2012-06-27 | 2013-01-09 | 中建七局建筑装饰工程有限公司 | Ponding preventing shower cubicle ground |
CN104452981A (en) * | 2014-12-26 | 2015-03-25 | 苏州金螳螂住宅集成装饰有限公司 | Restroom water-seepage-preventing construction structure and construction method thereof |
CN206607659U (en) * | 2017-02-27 | 2017-11-03 | 绿城装饰工程集团有限公司 | A kind of shower house discharge structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113463873A (en) * | 2021-06-23 | 2021-10-01 | 浙江中天精诚装饰集团有限公司 | Fast-assembling type shower floor stone and paving method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109296169A (en) | A kind of shower house construction method of ground | |
CN106437093B (en) | Building decoration concealed installation ceramic tile baseboard structure and construction process thereof | |
CN208501802U (en) | A kind of bathroom caisson internal drainage construction | |
CN103938679A (en) | Drainage riser connector of caisson-type toilet | |
CN208533644U (en) | Anti-overflow caisson of toilet with novel water drainage structure | |
CN204898839U (en) | Bathroom drainage mechanism | |
CN207331937U (en) | A kind of floor drain mounting structure | |
CN106320502A (en) | Seepage-proofing compound floor drain and construction method thereof | |
CN203821521U (en) | Soil stack connection piece for caisson type toilet | |
CN210713273U (en) | Waterproof structure for arranging falling plate for placing drainage device in toilet | |
CN211547908U (en) | Secondary drainage water draining and draining device for kitchen and bathroom | |
CN204960228U (en) | Integrated bathroom bottom plate | |
CN207499072U (en) | toilet | |
CN101936034A (en) | Auxiliary water seepage deodorant floor drain | |
CN216339924U (en) | Infiltration reflux unit | |
CN205348356U (en) | Bathroom foundation ditch sewer assembly | |
CN203821522U (en) | Caisson secondary water discharging system with air returning pipeline | |
CN205171652U (en) | Heavy pond of formula that installs additional floor drain | |
CN109281357A (en) | A kind of concealed flowing water hole construction method of shower house dash side | |
CN204531282U (en) | Leakproof washroom base plate | |
CN213234416U (en) | Shower room without water retaining | |
CN109707185A (en) | The blank integrated bathroom of inner wall provided pipe line groove hole | |
CN211447594U (en) | Bathroom cubic drainage structures | |
CN203947562U (en) | A kind of floor drain connector | |
CN219863222U (en) | Anti-seepage structure for floor drain in kitchen and bathroom is repacked and repacked |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190201 |
|
RJ01 | Rejection of invention patent application after publication |