CN109281357B - Construction method of hidden type water flow hole at water blocking edge of shower room - Google Patents

Construction method of hidden type water flow hole at water blocking edge of shower room Download PDF

Info

Publication number
CN109281357B
CN109281357B CN201811006115.6A CN201811006115A CN109281357B CN 109281357 B CN109281357 B CN 109281357B CN 201811006115 A CN201811006115 A CN 201811006115A CN 109281357 B CN109281357 B CN 109281357B
Authority
CN
China
Prior art keywords
shower
water
construction
ground
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811006115.6A
Other languages
Chinese (zh)
Other versions
CN109281357A (en
Inventor
张炳生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shanghai Architectural Decoration Engineering Co ltd
Original Assignee
Shanghai Jutong Decoration Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jutong Decoration Group Co ltd filed Critical Shanghai Jutong Decoration Group Co ltd
Priority to CN201811006115.6A priority Critical patent/CN109281357B/en
Publication of CN109281357A publication Critical patent/CN109281357A/en
Application granted granted Critical
Publication of CN109281357B publication Critical patent/CN109281357B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors

Abstract

The invention discloses a construction method of hidden type water flow holes at the water blocking edge of a shower room, which relates to the technical field of buildings and comprises the following steps: positioning a shower position and limiting floor heating construction on a horizontal line and a ground finish surface; step two, construction limiting ruler: according to the height measurement and calculation completed on the ground, the water flowing groove at the combined water retaining strip is provided with a sloping water flowing port, the slope of the water flowing port is consistent with that of the outer ground, the edge interface of the water flowing groove is hidden, the sloping water flowing hole and the height limiting ruler of the sloping shower groove in the shower are connected, and the integral slope penetrates to the lowest point of the shower water outlet; step three, construction flow: waterproofing and detecting the ground; leveling construction of floor heating outside the shower; the combined water retaining strip is horizontally installed; paving and pasting the ground in the shower center; mounting a shower groove and a floor drain; the outer ground is connected with the flume and paved. The invention has the advantages of smooth slope of surface flowing water outside the shower, smooth splicing of floor tile joints, no water accumulation on the whole and good practical effect.

Description

Construction method of hidden type water flow hole at water blocking edge of shower room
Technical Field
The invention relates to the technical field of buildings, in particular to a construction method of a hidden drain hole at a water blocking edge of a shower room.
Background
Modern home has higher and higher requirements on sanitary facilities, and many families want to have an independent bathing space, but the sanitary space in a room is limited, so the bathing facilities and sanitary wares can only be arranged in one room. The shower room fully utilizes one corner of the room, and the shower range is clearly divided by the fence to form relatively independent shower spaces.
The existing construction method of the water flowing hole of the shower room comprises the following steps: firstly, traditional positioning without finished surface positioning; secondly, the traditional size: the slope is randomly determined when the patch is laid without measurement and calculation; thirdly, traditional construction: the floor is waterproof, the water bar is installed, the inner and outer floor drains are arranged, the hole is dug in the floor drain, and the floor is paved. Therefore, the defects of multidirectional slope paving and sticking of the floor tiles, uneven joints and rough floor drain installation and cutting dug holes exist.
Disclosure of Invention
The invention aims to provide a construction method of a hidden drain hole at a water blocking edge of a shower room, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a construction method of hidden type water flow holes at the water blocking edge of a shower room comprises the following steps:
step one, construction positioning: positioning a shower position and limiting floor heating construction on a horizontal line and a ground finish surface;
step two, construction limiting ruler: according to the height measurement and calculation completed on the ground, the water flowing groove at the combined water retaining strip is provided with a sloping water flowing hole, the slope of the water flowing hole is consistent with that of the outer ground, the edge interface of the water flowing groove is hidden, the sloping water flowing hole and the height limiting ruler of the sloping shower groove in the shower are connected, and the integral slope penetrates to the lowest point of the shower water outlet;
step three, construction flow:
1. waterproofing and detecting the ground;
2. leveling construction of floor heating outside the shower;
3. the combined water retaining strip is horizontally installed;
4. paving and pasting the ground in the shower center;
5. mounting a shower groove and a floor drain;
6. the outer ground is connected with the flume and paved.
As a still further scheme of the invention: the shower groove is arranged in the groove on the first mortar layer.
As a still further scheme of the invention: the rest surface of the first mortar layer is a shower floor.
As a still further scheme of the invention: the combined water retaining strip is composed of a waterproof layer, a floor heating layer, a second mortar layer and a floor tile layer which are sequentially arranged from bottom to top, and the water retaining strip is connected with the waterproof layer, the floor heating layer, the second mortar layer and the floor tile layer.
As a still further scheme of the invention: the diameter of the water flowing hole is 16 mm.
Compared with the prior art, the invention has the beneficial effects that: the invention has the advantages of smooth slope of surface flowing water outside the shower, smooth splicing of floor tile joints, no water accumulation on the whole and good practical effect.
Drawings
FIG. 1 is a schematic diagram of a construction method of a hidden water hole at a water blocking edge of a shower room.
In the figure: 1-waterproof layer, 2-ground heating layer, 3-water baffle, 4-shower floor, 5-shower, 6-floor brick layer, 7-flume, 8-water hole, 9-second mortar layer and 10-first mortar layer.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below with reference to specific embodiments, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
A construction method of hidden water flow holes at the water blocking edge of a shower room is shown in figure 1 and comprises the following steps:
step one, construction positioning: positioning a shower position and limiting floor heating construction on a horizontal line and a ground finish surface;
step two, construction limiting ruler: according to the height measurement and calculation completed on the ground, the drain hole 8 with the slope is arranged on the drain channel 7 at the combined water bar 3, the slope of the drain hole 8 is consistent with that of the outer ground, the edge joint of the drain channel 7 is hidden, the height limit ruler of the drain hole 8 with the slope and the shower groove 5 with the slope in the shower is arranged, and the integral slope penetrates to the lowest point of the shower drain hole;
step three, construction flow:
1. waterproofing and detecting the ground;
2. leveling construction of floor heating outside the shower;
3. the combined water retaining strip 3 is horizontally arranged;
4. paving and pasting the ground in the shower center;
5. mounting a shower groove and a floor drain;
6. the outer ground is connected with the flume 7 for paving.
Shower gutter 5 is provided in a recess in first mortar layer 10.
The rest of the first mortar layer 10 is the shower floor 4, the combined water retaining strip 3 consists of a waterproof layer 1, a floor heating layer 2, a second mortar layer 9 and a floor tile layer 6 which are sequentially arranged from bottom to top and water retaining strips connected with the waterproof layer 1, the floor heating layer 2, the second mortar layer 9 and the floor tile layer 6, and the diameter of the water flowing hole 8 is 16 mm.
The invention has the advantages of smooth slope of surface flowing water outside the shower, smooth splicing of floor tile joints, no water accumulation on the whole and good practical effect.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (4)

1. A construction method of hidden water flow holes at the water blocking edge of a shower room is characterized by comprising the following steps:
step one, construction positioning: positioning a shower position and limiting floor heating construction on a horizontal line and a ground finish surface;
step two, construction limiting ruler: according to the height measurement and calculation completed on the ground, the drain hole (8) with the slope is arranged on the drain tank (7) at the position of the combined water bar (3), the slope of the drain hole (8) is consistent with that of the outer ground, the edge joint of the drain tank (7) is hidden, the height limit ruler of the drain hole (8) with the slope and the shower groove (5) with the slope in the shower is arranged, and the integral slope penetrates to the lowest point of the shower drain port;
the combined water retaining strip (3) consists of a waterproof layer (1), a floor heating layer (2), a second mortar layer (9), a floor tile layer (6) and water retaining strips connected with the waterproof layer (1), the floor heating layer (2), the second mortar layer (9) and the floor tile layer (6) which are sequentially arranged from bottom to top;
step three, construction flow:
waterproofing and detecting the ground;
leveling construction of floor heating outside the shower;
the combined water retaining strip (3) is horizontally arranged;
paving and pasting the ground in the shower center;
mounting a shower groove and a floor drain;
the outer ground is connected with the flume (7) for paving.
2. The construction method of the hidden drain hole of the water baffle of the shower room according to claim 1 is characterized in that the shower groove (5) is arranged in a groove on the first mortar layer (10).
3. The method for constructing a hidden drain hole in the water baffle of a shower room as claimed in claim 2, wherein the rest surface of the first mortar layer (10) is a shower floor (4).
4. The method for constructing the hidden drain hole of the water baffle edge of the shower room as claimed in any one of claims 1 to 3, wherein the diameter of the drain hole (8) is 16 mm.
CN201811006115.6A 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room Active CN109281357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811006115.6A CN109281357B (en) 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811006115.6A CN109281357B (en) 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room

Publications (2)

Publication Number Publication Date
CN109281357A CN109281357A (en) 2019-01-29
CN109281357B true CN109281357B (en) 2021-07-30

Family

ID=65183217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811006115.6A Active CN109281357B (en) 2018-08-30 2018-08-30 Construction method of hidden type water flow hole at water blocking edge of shower room

Country Status (1)

Country Link
CN (1) CN109281357B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203302958U (en) * 2013-04-25 2013-11-27 刘勇 Water stopping groove for bath curtain bathroom
CN206233389U (en) * 2016-11-25 2017-06-09 绿城装饰工程集团有限公司 A kind of separating dry space from moist space waterproof construction

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08254027A (en) * 1995-03-15 1996-10-01 Toto Ltd Unit room for hospital
CN202658843U (en) * 2012-06-27 2013-01-09 中建七局建筑装饰工程有限公司 Ponding preventing shower cubicle ground
CN203462722U (en) * 2013-08-22 2014-03-05 上海建工一建集团有限公司 Floor water-proof structure of bathroom paved with floor heating equipment
CN206545282U (en) * 2017-02-20 2017-10-10 上海东稻建设有限公司 Toilet bathroom waterproof construction
CN206607692U (en) * 2017-02-27 2017-11-03 绿城装饰工程集团有限公司 Shower house water-blocking bank structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203302958U (en) * 2013-04-25 2013-11-27 刘勇 Water stopping groove for bath curtain bathroom
CN206233389U (en) * 2016-11-25 2017-06-09 绿城装饰工程集团有限公司 A kind of separating dry space from moist space waterproof construction

Also Published As

Publication number Publication date
CN109281357A (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN202718191U (en) Double-row type waterproof pipeline structure
CN103410318B (en) Washroom pipe well water-leakage construction method
CN109281357B (en) Construction method of hidden type water flow hole at water blocking edge of shower room
CN205024824U (en) Bathroom mounting structure
CN107989287A (en) Inverted roof light and shade drainage system construction method
CN208830084U (en) A kind of concealed ground library surface drainage system
CN212104515U (en) Be used for basement percolating water prevention and cure construction structures
CN203531128U (en) Drainage structure of outdoor building component pasted with large tapestry brick
CN108301504B (en) Balcony building structure capable of preventing water accumulation
CN206667445U (en) Bathroom floor drain waterproof node
JP4475905B2 (en) Rainwater drainage structure
CN218264281U (en) Novel gallery drainage structures
CN219137901U (en) Drainage structure for open corridor
CN216339924U (en) Infiltration reflux unit
CN217517800U (en) Drainage structure of outer cantilever plate of building
CN219569388U (en) Roof slope finding waterproof structure
CN205171652U (en) Heavy pond of formula that installs additional floor drain
CN109296169A (en) A kind of shower house construction method of ground
CN219158216U (en) Flat tile roofing ridge waterproof construction for building engineering
CN220100230U (en) Externally inserted rainwater hopper for outer wall drainage of laying insulation board
CN215948523U (en) Be located waterproof zone subsiding crack waterproof construction
CN210887905U (en) Kitchen floor seepage prevention structure
CN211850058U (en) Anti-bank structure of building antiseep C20 concrete
CN218842769U (en) Hidden lane drainage structures
CN215670766U (en) Shower room ground capable of preventing water accumulation and convenient to clean

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230508

Address after: Room 318, Building 8, No. 68 Dongheyan, Chengqiao Town, Chongming District, Shanghai, 202150 (Shanghai Chengqiao Economic Development Zone)

Patentee after: Shanghai Shanghai Architectural Decoration Engineering Co.,Ltd.

Address before: No.15, Lane 300, Dezhou Road, Pudong New Area, Shanghai, 200126

Patentee before: SHANGHAI JUTONG DECORATION GROUP Co.,Ltd.