CN206607692U - Shower house water-blocking bank structure - Google Patents

Shower house water-blocking bank structure Download PDF

Info

Publication number
CN206607692U
CN206607692U CN201720180276.1U CN201720180276U CN206607692U CN 206607692 U CN206607692 U CN 206607692U CN 201720180276 U CN201720180276 U CN 201720180276U CN 206607692 U CN206607692 U CN 206607692U
Authority
CN
China
Prior art keywords
wall
waterproof layer
shower house
layer
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720180276.1U
Other languages
Chinese (zh)
Inventor
曹先文
沈洪刚
孟黎佳
陈政岗
蔡亚男
熊伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Greentown Decoration Engineering Group Co Ltd
Original Assignee
Greentown Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Greentown Decoration Engineering Group Co Ltd filed Critical Greentown Decoration Engineering Group Co Ltd
Priority to CN201720180276.1U priority Critical patent/CN206607692U/en
Application granted granted Critical
Publication of CN206607692U publication Critical patent/CN206607692U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of shower house water-blocking bank structure, it is intended to easily Seepage occurs after solving shower house water bar long-time use, so that the water in shower house is flowed on accomodation ground, it is impossible to realize the deficiency of separating dry space from moist space well.The utility model includes being cast on floor leading wall, lead and be sequentially provided with bottom waterproof layer from lower to upper on the floor of wall both sides, thermal insulation mortar fish tail and waterproof layer, backfill layer, brick clay adhered layer, lead and be equipped with toilet decorative ground on the brick clay adhered layer of wall side, lead and be equipped with shower house decorative ground on the brick clay adhered layer of wall opposite side, lay and be provided with top waterproof layer between the brick clay adhered layer of shower house decorative ground and backfill layer, lead wall two sides and upper surface is coated with and leads wall waterproof layer, wall waterproof layer two ends are led to link into an integrated entity with leading the bottom waterproof layer of wall both sides respectively, top waterproof layer end, which is connected to, leads on wall waterproof layer, lead wall upper end and be covered with inverted U-shaped water bar.

Description

Shower house water-blocking bank structure
Technical field
The utility model is related to a kind of shower house, more specifically, it relates to a kind of shower house water-blocking bank structure.
Background technology
At present, in general interior decoration shower house in toilet need with outside separating dry space from moist space, conventional method be Water bar is installed on ground, dash sliding door is installed above water bar, but many shower house use time length dash now Easily there is Seepage in bar position, so that the water in shower house is flowed on accomodation ground, it is impossible to realize dry and wet point well From.
Utility model content
Easily there is Seepage after overcoming shower house water bar long-time use in the utility model, so that in shower house Water flow on accomodation ground, it is impossible to realize well separating dry space from moist space deficiency there is provided a kind of shower house water-blocking bank structure, Its structure is steadily reliable, and dash effect is good, for a long time using being not easy to Seepage occur, effectively prevents the current in shower house Onto accomodation ground, the separating dry space from moist space of toilet, and shower house good leak-proof effect are realized well.
In order to solve the above-mentioned technical problem, the utility model uses following technical scheme:A kind of shower house water-blocking bank structure, Wall is led including being cast on floor, leads and is sequentially provided with bottom waterproof layer, thermal insulation mortar waterproof on the floor of wall both sides from lower to upper Protective layer, backfill layer, brick clay adhered layer, lead and are equipped with toilet decorative ground on the brick clay adhered layer of wall side, lead wall Be equipped with shower house decorative ground on the brick clay adhered layer of opposite side, lay the brick clay adhered layer of shower house decorative ground with Top waterproof layer is provided between backfill layer, wall two sides is led and upper surface is coated with and leads wall waterproof layer, lead wall waterproof layer two ends Linked into an integrated entity respectively with leading the bottom waterproof layer of wall both sides, top waterproof layer end, which is connected to, leads on wall waterproof layer, leads on wall End is covered with inverted U-shaped water bar, water bar and leads and is provided with brick clay between wall, lead wall upper end higher than toilet decorative ground and Shower house decorative ground.
Lead wall to isolate shower house, substantially increase dash effect, and water bar is arranged on and leads wall upper end, structure It is steady reliable, be conducive to improving the bearing capacity of water bar, it is to avoid occur deformation seepage after water bar long-time use.Shower house Interior setting bottom waterproof layer, top waterproof layer, are set by two layers of waterproof layer up and down, substantially increase antiseep effect.It is this Shower house water-blocking bank structure is steadily reliable, and dash effect is good, for a long time using being not easy to Seepage occur, effectively prevents shower Water in room is flowed on accomodation ground, and the separating dry space from moist space of toilet, and shower house good leak-proof effect are realized well.
Preferably, leading wall waterproof layer and the rounded transition of bottom waterproof layer link position.Round-corner transition sets and prevents from oozing Water remains in angle position, is conducive to the flowing of infiltration.
Preferably, bottom waterproof layer outward flange is provided with the bottom extension being applied on metope dug upwards, bottom Round-corner transition between extension and bottom waterproof layer.The height of bottom extension is approached with water bar upper end level.Bottom extends Section prevents occurring infiltration phenomenon on wall.
Preferably, bottom extension section surface has painted cement mortar successively paints internal layer, cement mortar rendering outer layer.Water Cement mortar, which paints internal layer, cement mortar rendering outer layer, makes bottom extension firmly be arranged on metope.
Preferably, top waterproof layer outward flange is provided with the top extension being applied on metope dug upwards, top The height of extension is 50-200cm.Extension carries out antiseepage drain process to wall, prevents wall from infiltration phenomenon occur.
Preferably, close to toilet, ornamentally surface side is provided with dash raised line, water bar upper surface on water bar upper surface Upper close shower house is ornamentally provided with the guide face tilted down in surface side.Dash raised line prevents the current stream on water bar upper surface Into toilet, guide face is drained into shower house to the current on water bar upper surface.
Preferably, leading portion within the walls is provided with reinforced frame, reinforced frame includes transverse steel and vertical reinforcement, vertical reinforcement lower end It is connected in floor.The setting of reinforced frame substantially increases the structural strength for leading wall.
Compared with prior art, the beneficial effects of the utility model are:Shower house water-blocking bank structure is steadily reliable, dash effect It is really good, for a long time using being not easy to Seepage occur, effectively prevent the water in shower house from flowing on accomodation ground, well Realize the separating dry space from moist space of toilet, and shower house good leak-proof effect.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present utility model;
In figure:1st, floor, 2, lead wall, 3, bottom waterproof layer, 4, thermal insulation mortar fish tail and waterproof layer, 5, backfill layer, 6, top Waterproof layer, 7, brick clay adhered layer, 8, lead wall waterproof layer, 9, water bar, 10, brick clay, 11, toilet decorative ground, 12, drench Bath room decorative ground, 13, bottom extension, 14, cement mortar paint internal layer, 15, cement mortar paint outer layer, 16, top prolongs Stretch section, 17, dash raised line, 18, guide face, 19, transverse steel, 20, vertical reinforcement.
Embodiment
Below by specific embodiment, and with reference to accompanying drawing, the technical solution of the utility model is made further specifically to retouch State:
Embodiment:A kind of shower house water-blocking bank structure(Referring to accompanying drawing 1), including be cast on floor 1 and lead wall 2, lead wall Inside is provided with reinforced frame, and reinforced frame includes transverse steel 19 and vertical reinforcement 20, and vertical reinforcement lower end is connected in floor.Lead wall Bottom waterproof layer 3, thermal insulation mortar fish tail and waterproof layer 4, backfill layer 5, brick clay are sequentially provided with the floor of both sides from lower to upper to paste Layer 7, leads and is equipped with toilet decorative ground 11 on the brick clay adhered layer of wall side, lead on the brick clay adhered layer of wall opposite side Shower house decorative ground 12 is equipped with, is laid anti-provided with top between the brick clay adhered layer of shower house decorative ground and backfill layer Water layer 6, leads wall two sides and upper surface is coated with and leads wall waterproof layer 8, leads wall waterproof layer two ends respectively with leading the bottoms of wall both sides Portion's waterproof layer links into an integrated entity, and leads wall waterproof layer and the rounded transition of bottom waterproof layer link position.Top waterproof layer end connects It is connected to and leads on wall waterproof layer, lead wall upper end and be covered with inverted U-shaped water bar 9, water bar and lead and be provided with brick clay 10 between wall, leads Wall upper end is higher than toilet decorative ground and shower house decorative ground.Bottom waterproof layer outward flange is provided with being applied to for digging upwards Bottom extension 13 on metope, round-corner transition between bottom extension and bottom waterproof layer.The height and gear of bottom extension Water bar upper end level is approached.Bottom extension section surface has painted cement mortar and has painted internal layer 14, cement mortar rendering outer layer successively 15.Top waterproof layer outward flange is provided with the top extension 16 being applied on metope dug upwards, the height of top extension For 50-200cm.Close to toilet, ornamentally surface side is provided with dash raised line 17 on water bar upper surface, and water bar is leaned on upper surface Ornamentally surface side is provided with the guide face 18 tilted down to nearly shower house.
Lead wall to isolate shower house, substantially increase dash effect, and water bar is arranged on and leads wall upper end, structure It is steady reliable, be conducive to improving the bearing capacity of water bar, it is to avoid occur deformation seepage after water bar long-time use.Shower house Interior setting bottom waterproof layer, top waterproof layer, are set by two layers of waterproof layer up and down, substantially increase antiseep effect.It is this Shower house water-blocking bank structure is steadily reliable, and dash effect is good, for a long time using being not easy to Seepage occur, effectively prevents shower Water in room is flowed on accomodation ground, and the separating dry space from moist space of toilet, and shower house good leak-proof effect are realized well.
Embodiment described above is a kind of preferably scheme of the present utility model, not makees any to the utility model Formal limitation, also has other variants and remodeling on the premise of without departing from the technical scheme described in claim.

Claims (8)

1. a kind of shower house water-blocking bank structure, it is characterized in that, including be cast on floor and lead wall, lead on the floor of wall both sides under Bottom waterproof layer, thermal insulation mortar fish tail and waterproof layer, backfill layer, brick clay adhered layer are up sequentially provided with, the brick glue of wall side is led Toilet decorative ground is equipped with mud adhered layer, leads and is equipped with shower house ornamentally on the brick clay adhered layer of wall opposite side Face, lay shower house decorative ground brick clay adhered layer and backfill layer between be provided with top waterproof layer, lead wall two sides and Upper surface, which is coated with, leads wall waterproof layer, leads wall waterproof layer two ends and is linked into an integrated entity respectively with leading the bottom waterproof layer of wall both sides, top Portion waterproof layer end, which is connected to, is led on wall waterproof layer, leads wall upper end and is covered with inverted U-shaped water bar, and water bar and leading is set between wall There is brick clay, lead wall upper end higher than toilet decorative ground and shower house decorative ground.
2. shower house water-blocking bank structure according to claim 1, it is characterized in that, lead wall waterproof layer and be connected with bottom waterproof layer The rounded transition in position.
3. shower house water-blocking bank structure according to claim 1, it is characterized in that, bottom waterproof layer outward flange is provided with and turned over upwards The bottom extension being applied on metope risen, round-corner transition between bottom extension and bottom waterproof layer.
4. shower house water-blocking bank structure according to claim 3, it is characterized in that, in the height and water bar of bottom extension End height is close.
5. shower house water-blocking bank structure according to claim 3, it is characterized in that, bottom extension section surface has painted water successively Cement mortar paints internal layer, cement mortar and paints outer layer.
6. the shower house water-blocking bank structure according to claim 1 to 5 any one, it is characterized in that, outside the waterproof layer of top Edge is provided with the top extension being applied on metope dug upwards, and the height of top extension is 50-200cm.
7. the shower house water-blocking bank structure according to claim 1 to 5 any one, it is characterized in that, on water bar upper surface Close to toilet, ornamentally surface side is provided with dash raised line, on water bar upper surface close to shower house ornamentally surface side provided with dipping down Oblique guide face.
8. the shower house water-blocking bank structure according to claim 1 to 5 any one, it is characterized in that, the portion within the walls that leads is provided with steel Ledges, reinforced frame includes transverse steel and vertical reinforcement, and vertical reinforcement lower end is connected in floor.
CN201720180276.1U 2017-02-27 2017-02-27 Shower house water-blocking bank structure Expired - Fee Related CN206607692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720180276.1U CN206607692U (en) 2017-02-27 2017-02-27 Shower house water-blocking bank structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720180276.1U CN206607692U (en) 2017-02-27 2017-02-27 Shower house water-blocking bank structure

Publications (1)

Publication Number Publication Date
CN206607692U true CN206607692U (en) 2017-11-03

Family

ID=60169766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720180276.1U Expired - Fee Related CN206607692U (en) 2017-02-27 2017-02-27 Shower house water-blocking bank structure

Country Status (1)

Country Link
CN (1) CN206607692U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281357A (en) * 2018-08-30 2019-01-29 上海聚通装饰集团有限公司 A kind of concealed flowing water hole construction method of shower house dash side
CN110200531A (en) * 2019-06-17 2019-09-06 北京港源建筑装饰工程有限公司 A kind of shower partition waterproof system and its construction method
CN112081493A (en) * 2020-09-15 2020-12-15 燕山大学 Water-stopping anti-ridge component of bathroom shower room and construction method thereof
CN113323397A (en) * 2021-06-30 2021-08-31 况磊 Construction method of concrete water blocking belt for toilet
CN113914487A (en) * 2021-10-20 2022-01-11 安徽四建控股集团有限公司 Construction method for cast-in-place reinforced concrete water bar of shower room

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281357A (en) * 2018-08-30 2019-01-29 上海聚通装饰集团有限公司 A kind of concealed flowing water hole construction method of shower house dash side
CN110200531A (en) * 2019-06-17 2019-09-06 北京港源建筑装饰工程有限公司 A kind of shower partition waterproof system and its construction method
CN112081493A (en) * 2020-09-15 2020-12-15 燕山大学 Water-stopping anti-ridge component of bathroom shower room and construction method thereof
CN113323397A (en) * 2021-06-30 2021-08-31 况磊 Construction method of concrete water blocking belt for toilet
CN113914487A (en) * 2021-10-20 2022-01-11 安徽四建控股集团有限公司 Construction method for cast-in-place reinforced concrete water bar of shower room

Similar Documents

Publication Publication Date Title
CN206607692U (en) Shower house water-blocking bank structure
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN204418426U (en) Precast wall panel seam syndeton
CN203256774U (en) Underground cable trench construction structure for electric engineering
CN110159006A (en) A kind of structure, pipeline, heat preservation, decoration integrated assembled toilet
CN103437556A (en) Waterproof and heat-preservation construction method for building water supply and drainage and heating engineering
CN203270818U (en) Water-seepage preventing structure of outer window opening of outer insulating building
CN209397632U (en) A kind of anti-white-out construction of basement
CN210508097U (en) Novel roof deformation joint structure
CN204663004U (en) Fragment of brick immersion device
CN208039921U (en) A kind of bathroom integrally backfills structure
CN206189906U (en) Bathroom room
CN206625262U (en) A kind of concrete water-proof structure for basement bottom board
CN104088407A (en) Anti-leakage prefabricated component
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN205135245U (en) Waterproof structure of window board
CN2928987Y (en) Floor drain without water logging
CN204225393U (en) Lightgage steel joist balcony breast board structure for building
CN208965683U (en) A kind of balcony drainage outlet node waterproof structure
CN209025252U (en) A kind of external wall waterproof structure of prefabrication
CN102561884A (en) Leak-proof window frame and construction method thereof
CN101812846A (en) Drainage structure of upstream wall of shore type hydropower station workshop and construction method thereof
CN217601529U (en) Basement lateral wall post-cast strip seepage prevention structure
CN206205200U (en) Post-pouring belt of outer wall structure
CN206189914U (en) Bathroom room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103

Termination date: 20210227

CF01 Termination of patent right due to non-payment of annual fee