CN208039921U - A kind of bathroom integrally backfills structure - Google Patents
A kind of bathroom integrally backfills structure Download PDFInfo
- Publication number
- CN208039921U CN208039921U CN201820400988.4U CN201820400988U CN208039921U CN 208039921 U CN208039921 U CN 208039921U CN 201820400988 U CN201820400988 U CN 201820400988U CN 208039921 U CN208039921 U CN 208039921U
- Authority
- CN
- China
- Prior art keywords
- layer
- cement concrete
- waterproof
- foaming cement
- integrally
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims abstract description 60
- 239000004568 cement Substances 0.000 claims abstract description 59
- 238000005187 foaming Methods 0.000 claims abstract description 49
- 239000000919 ceramic Substances 0.000 claims abstract description 30
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 17
- 229910002114 biscuit porcelain Inorganic materials 0.000 claims abstract description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 9
- 230000004888 barrier function Effects 0.000 claims description 9
- 239000002699 waste material Substances 0.000 claims description 8
- 239000003973 paint Substances 0.000 claims description 5
- 239000011248 coating agent Substances 0.000 claims 1
- 238000000576 coating method Methods 0.000 claims 1
- 239000006260 foam Substances 0.000 claims 1
- 239000000049 pigment Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 13
- 239000000843 powder Substances 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 112
- 239000011247 coating layer Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Landscapes
- Floor Finish (AREA)
- Building Environments (AREA)
Abstract
The utility model belongs to bathroom building technology field,Structure is integrally backfilled more particularly to a kind of bathroom,Including reinforced concrete floor,It is set to the foaming cement concrete layer of reinforced concrete floor upper end,It is set to the first waterproof layer of foaming cement concrete layer upper end and is set to the ceramic tile layer of the first waterproof layer upper end,Drain header road and secondary drainage pipeline are provided in foaming cement concrete layer,One end of secondary drainage pipeline is connected to drain header road,The other end of secondary drainage pipeline runs through foaming cement concrete layer and ceramic tile layer,First waterproof layer is waterproof bisque,The utility model between foaming cement concrete layer and ceramic tile layer by being arranged the first waterproof layer,Effectively reduce the case where water drains to foaming cement concrete layer under between ceramic tile layer surface or gap,Set the first waterproof layer to waterproof bisque,When construction,Waterproof powder is directly spread across to the upper end of foaming cement concrete layer,Construction time and construction volume can be reduced,So as to shorten the entire duration.
Description
Technical field
The utility model belongs to bathroom building technology field, and in particular to a kind of bathroom integrally backfills structure.
Background technology
Bathroom backfill structure, which is commonly, at present first does waterproof layer, then uses haydite or building waste to fill, then filling out
It fills setting mortar levelling layer, last paving ceramic tile, but building waste or haydite water absorption rate height, corner angle on layer and is easily destroyed original too much
Some waterproof layers and drainage pipeline, to solve the problems, such as this, the Chinese patent of Patent No. CN205907766U discloses one kind and defends
Caisson integral waterproofing structure between life, this patent are directly poured into a mould with cement concrete layer, avoid building waste and haydite combines not
Close the case where being susceptible to ponding, while cement concrete layer globality is more preferable, also avoids building waste and haydite corner angle
The case where being easily destroyed original waterproof layer and drainage pipeline too much occurs, however the structure is straight on the top of cement concrete layer
Laying ceramic tile layer is connect, water is easy to drain to cement concrete layer under ceramic tile surface and gap so as to cause seepy question.
Utility model content
In order to overcome shortcoming and defect existing in the prior art, the purpose of this utility model is to provide a kind of bathrooms
Whole backfill structure, the bathroom integrally backfill convenient structure construction, good integrity and can effectively avoid water from ceramic tile surface and
Cement concrete layer is drained under gap.
The purpose of this utility model is achieved through the following technical solutions:A kind of bathroom integrally backfills structure, including reinforcing bar
Concrete building plate, the foaming cement concrete layer for being set to reinforced concrete floor upper end, be set to foaming cement concrete layer upper end
One waterproof layer and the ceramic tile layer for being set to the first waterproof layer upper end are provided with drain header in the foaming cement concrete layer
One end of road and secondary drainage pipeline, the secondary drainage pipeline is connected to drain header road, the secondary drainage pipeline it is another
Foaming cement concrete layer and ceramic tile layer are run through in one end, and first waterproof layer is waterproof bisque.
Further, the second waterproof layer is provided between the reinforced concrete floor and foaming cement concrete layer.
Further, second waterproof layer is waterproof bisque.
Further, second waterproof layer is waterproof coating layer.
Further, further include filled layer, the foaming cement concrete layer includes being set to reinforced concrete floor upper end
Bottom foaming cement concrete layer and the top layer foaming cement concrete layer for being set to ceramic tile layer lower end, the filled layer are located at
Between bottom foaming cement concrete layer and top layer foaming cement concrete layer.
Further, the filled layer is one kind in haydite layer or building waste layer.
Further, the outer surface of the secondary drainage pipeline is coated with anticorrosive paint layer.
Further, the upper surface of the ceramic tile layer is provided with impervious barrier.
Further, the impervious barrier is antiseepage clear coat.
The beneficial effects of the utility model are:The utility model passes through between foaming cement concrete layer and ceramic tile layer
First waterproof layer is set, the case where water drains to foaming cement concrete layer under between ceramic tile layer surface or gap is effectively reduced,
The utility model sets the first waterproof layer to waterproof bisque, and when construction, waterproof powder is directly spread across foaming cement concrete layer
Upper end after form the first waterproof layer, construction time and construction volume can be reduced, so as to shorten the entire duration.
Description of the drawings
Fig. 1 is the dimensional structure diagram of embodiment 1;
Fig. 2 is the dimensional structure diagram of embodiment 1.
Reference numeral is:
1- reinforced concrete floors;2- foaming cement concrete layers;The first waterproof layers of 3-;
4- ceramic tile layers;5- drain headers road;6- secondary drainage pipelines;
The second waterproof layers of 7-;8- filled layers;9- impervious barriers;
21- bottom foaming cement concrete layers;22- top layer foaming cement concrete layers.
Specific implementation mode
For the ease of the understanding of those skilled in the art, with reference to embodiment and attached drawing 1-2 to the utility model make into
The explanation of one step, the content that embodiment refers to not are the restriction to the utility model.
Embodiment 1
Please refer to attached drawing 1, a kind of bathroom integrally backfills structure, including reinforced concrete floor 1, is set to reinforced concrete floor 1
The foaming cement concrete layer 2 of upper end, the first waterproof layer 3 for being set to 2 upper end of foaming cement concrete layer and it is set to
The ceramic tile layer 4 of one waterproof layer, 3 upper end is provided with drain header road 5 and secondary drainage pipeline in the foaming cement concrete layer 2
6, one end of the secondary drainage pipeline 6 is connected to drain header road 5, the other end of the secondary drainage pipeline 6 with through hair
Cement concrete layer 2 and ceramic tile layer 4 are steeped, first waterproof layer 2 is waterproof bisque.
The utility model is effectively subtracted by the way that the first waterproof layer 3 is arranged between foaming cement concrete layer 2 and ceramic tile layer 4
The case where few water drains to foaming cement concrete layer 2 under between 4 surface of ceramic tile layer or gap, the utility model is by the first waterproof
Layer 3 is set as waterproof bisque, and when construction, the upper end that waterproof powder is directly spread across to foaming cement concrete layer 2 forms the first waterproof
Layer 3, can reduce construction time and construction volume, so as to shorten the entire duration.
Further, the second waterproof layer 7 is provided between the reinforced concrete floor 1 and foaming cement concrete layer 2.
The utility model between reinforced concrete floor 1 and foaming cement concrete layer 2 by being arranged the second waterproof layer 7, energy
Effectively ponding is avoided to leak into reinforced concrete floor 1.
Further, second waterproof layer 7 is waterproof bisque.
The utility model is by setting the second waterproof layer 7 to waterproof bisque, and when construction, waterproof powder is directly spread across reinforcing bar
The upper end of concrete building plate 1 can reduce construction time and construction volume, so as to shorten the entire duration.
Further, second waterproof layer 7 is waterproof coating layer.
The utility model is by setting the second waterproof layer 7 to waterproof coating layer so that the second waterproof layer 7 can preferably cover
Lid reinforced concrete floor 1.
Further, the outer surface of the secondary drainage pipeline 6 is coated with anticorrosive paint layer.
The utility model avoids cement, haydite layer by being coated with anticorrosive paint layer in the outer surface of secondary drainage pipeline 6
Or corrosion of the corrosive deposit in building waste layer to secondary drainage pipeline 6, the service life of secondary drainage pipeline 6 is extended, is reduced
The chance that secondary drainage pipeline 6 is broken.
Further, the upper end of the ceramic tile layer 4 is provided with impervious barrier 9.
Impervious barrier 9 is arranged in the upper end of ceramic tile layer 4 in the utility model, avoids water under ceramic tile surface or ceramic tile slit source,
Seepy question is avoided from source.
Further, the impervious barrier 9 is antiseepage clear coat.
The utility model neither influences the appearance of anti-ceramic tile, and can guarantee by the way that impervious barrier 9 is set as antiseepage clear coat
The good water resistance of ceramic tile.
Embodiment 2
Please refer to attached drawing 2, this example difference from example 1 is that:
In the present embodiment, it further includes filled layer 8 that the bathroom, which integrally backfills structure, the foaming cement concrete layer 2
Including the top layer foaming for being set to the bottom foaming cement concrete layer 21 of 1 upper end of reinforced concrete floor, being set to 4 lower end of ceramic tile layer
Cement concrete layer 22, the filled layer 8 are located at bottom foaming cement concrete layer 21 and top layer foaming cement concrete layer 22
Between.
The utility model is by setting foaming cement concrete layer 2 to bottom foaming cement concrete layer 21 and top layer hair
Cement concrete layer 22 is steeped, filling is set between bottom foaming cement concrete layer 21 and top layer foaming cement concrete layer 22
Layer 8, the gap between filled layer 8 can be filled when pouring into a mould top layer foaming cement concrete layer 22, so that filled layer 8 combines
It is even closer, and then ensure also save building cost while leakproof.
Further, the filled layer 8 is haydite layer or building waste layer.
Above-described embodiment is the preferable implementation of the utility model, and in addition to this, the utility model can be with other sides
Formula realizes that any obvious replacement is in the protection model of the utility model without departing from the concept of the premise utility
Within enclosing.
Claims (9)
1. a kind of bathroom integrally backfills structure, it is characterised in that:Including reinforced concrete floor, it is set to reinforced concrete floor upper end
It foaming cement concrete layer, the first waterproof layer for being set to foaming cement concrete layer upper end and is set on the first waterproof layer
The ceramic tile layer at end is provided with drain header road and secondary drainage pipeline, the secondary drainage in the foaming cement concrete layer
One end of pipeline is connected to drain header road, and the other end of the secondary drainage pipeline runs through foaming cement concrete layer and ceramic tile
Layer, first waterproof layer are waterproof bisque.
2. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:The reinforced concrete floor and hair
It is provided with the second waterproof layer between bubble cement concrete layer.
3. a kind of bathroom according to claim 2 integrally backfills structure, it is characterised in that:Second waterproof layer is anti-
Pigment layer.
4. a kind of bathroom according to claim 2 integrally backfills structure, it is characterised in that:Second waterproof layer is anti-
Water paint layer.
5. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:Further include filled layer, it is described
Foaming cement concrete layer includes being set to the bottom foaming cement concrete layer of reinforced concrete floor upper end and being set to ceramic tile
The top layer foaming cement concrete layer of layer lower end, the filled layer are located at bottom foaming cement concrete layer and top layer foam cement
Between concrete layer.
6. a kind of bathroom according to claim 5 integrally backfills structure, it is characterised in that:The filled layer is haydite layer
Or one kind in building waste layer.
7. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:The secondary drainage pipeline
Outer surface is coated with anticorrosive paint layer.
8. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:The upper surface of the ceramic tile layer
It is provided with impervious barrier.
9. a kind of bathroom according to claim 8 integrally backfills structure, it is characterised in that:The impervious barrier is impermeable
Bright enamelled coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820400988.4U CN208039921U (en) | 2018-03-22 | 2018-03-22 | A kind of bathroom integrally backfills structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820400988.4U CN208039921U (en) | 2018-03-22 | 2018-03-22 | A kind of bathroom integrally backfills structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208039921U true CN208039921U (en) | 2018-11-02 |
Family
ID=63948062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820400988.4U Active CN208039921U (en) | 2018-03-22 | 2018-03-22 | A kind of bathroom integrally backfills structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208039921U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112012385A (en) * | 2020-07-29 | 2020-12-01 | 绍兴文理学院 | Waterproof laminated slab and construction method thereof |
CN112012384A (en) * | 2020-07-29 | 2020-12-01 | 绍兴文理学院 | One-way laminated slab without ribs at end of close-spliced connecting plate and construction method thereof |
-
2018
- 2018-03-22 CN CN201820400988.4U patent/CN208039921U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112012385A (en) * | 2020-07-29 | 2020-12-01 | 绍兴文理学院 | Waterproof laminated slab and construction method thereof |
CN112012384A (en) * | 2020-07-29 | 2020-12-01 | 绍兴文理学院 | One-way laminated slab without ribs at end of close-spliced connecting plate and construction method thereof |
CN112012385B (en) * | 2020-07-29 | 2022-02-11 | 绍兴文理学院 | Waterproof laminated slab and construction method thereof |
CN112012384B (en) * | 2020-07-29 | 2022-02-11 | 绍兴文理学院 | One-way laminated slab without ribs at end of close-spliced connecting plate and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202745335U (en) | Sunken type toilet water-resistant deodorization settling basin structure | |
CN209457166U (en) | A kind of subsided rest room caisson entirety overhead type waterproof construction | |
CN208039921U (en) | A kind of bathroom integrally backfills structure | |
CN208777468U (en) | A kind of kitchen and bath's water-proofing anticracking structure | |
CN208501802U (en) | A kind of bathroom caisson internal drainage construction | |
CN214246017U (en) | Secondary drainage structure of toilet | |
CN212926506U (en) | Bathroom threshold stone waterproof construction | |
CN212129250U (en) | Construction structure for additionally arranging collecting groove on post-cast strip of high-water-level foundation | |
CN208668952U (en) | A kind of kitchen drainage standpipe through-flooring structure | |
CN208380085U (en) | The draining pipe-through floor slab structure of a kind of ground leak | |
CN210508097U (en) | Novel roof deformation joint structure | |
CN102900144A (en) | Undermining floor drain automatic drainage structure capable of preventing leakage of toilet | |
CN207847399U (en) | A kind of window construction of house | |
CN207646973U (en) | A kind of vacation wall heel row formula co-layer draining waterproof system and the building including the system | |
CN202882098U (en) | In-pit floor drain automatic drainage structure capable of preventing toilet from leaking | |
CN205804419U (en) | The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall | |
CN212926756U (en) | Waterproof joint structure of flue root | |
CN208518393U (en) | A kind of caisson of toilet with Bars In Poured Concrete Slab | |
CN211548589U (en) | Dampproofing structure in bathroom | |
CN207295866U (en) | Caisson of toilet secondary drainage system | |
CN211313129U (en) | Inclined parapet internal corner waterproof node structure | |
CN207846692U (en) | A kind of water proof structure of floor and steel pipe column intersection | |
CN209227915U (en) | A kind of vertical water pipe of roofing falls the waterproof construction of mouth | |
CN207499072U (en) | toilet | |
CN208473213U (en) | A kind of ground waterproof structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210622 Address after: Room b701, 7th floor, Jiahe New Times Plaza, 380 Helong 1st Road, Helong street, Baiyun District, Guangzhou, Guangdong 510000 Patentee after: Guangzhou sharing Building Materials Technology Co.,Ltd. Address before: 523000 4th floor, building a, Gaolong Science Park, Xiaoyong village, Gaopo Town, Dongguan City, Guangdong Province Patentee before: Chen Yizhou |