CN208039921U CN201820400988.4U CN201820400988U CN208039921U CN 208039921 U CN208039921 U CN 208039921U CN 201820400988 U CN201820400988 U CN 201820400988U CN 208039921 U CN208039921 U CN 208039921U
Authority
CN
China
Prior art keywords
layer
cement concrete
waterproof
foaming cement
integrally
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820400988.4U
Other languages
Chinese (zh)
Inventor
陈艺州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Sharing Building Materials Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820400988.4U priority Critical patent/CN208039921U/en
Application granted granted Critical
Publication of CN208039921U publication Critical patent/CN208039921U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)
  • Building Environments (AREA)

Abstract

The utility model belongs to bathroom building technology field,Structure is integrally backfilled more particularly to a kind of bathroom,Including reinforced concrete floor,It is set to the foaming cement concrete layer of reinforced concrete floor upper end,It is set to the first waterproof layer of foaming cement concrete layer upper end and is set to the ceramic tile layer of the first waterproof layer upper end,Drain header road and secondary drainage pipeline are provided in foaming cement concrete layer,One end of secondary drainage pipeline is connected to drain header road,The other end of secondary drainage pipeline runs through foaming cement concrete layer and ceramic tile layer,First waterproof layer is waterproof bisque,The utility model between foaming cement concrete layer and ceramic tile layer by being arranged the first waterproof layer,Effectively reduce the case where water drains to foaming cement concrete layer under between ceramic tile layer surface or gap,Set the first waterproof layer to waterproof bisque,When construction,Waterproof powder is directly spread across to the upper end of foaming cement concrete layer,Construction time and construction volume can be reduced,So as to shorten the entire duration.

Description

A kind of bathroom integrally backfills structure
Technical field
The utility model belongs to bathroom building technology field, and in particular to a kind of bathroom integrally backfills structure.
Background technology
Bathroom backfill structure, which is commonly, at present first does waterproof layer, then uses haydite or building waste to fill, then filling out It fills setting mortar levelling layer, last paving ceramic tile, but building waste or haydite water absorption rate height, corner angle on layer and is easily destroyed original too much Some waterproof layers and drainage pipeline, to solve the problems, such as this, the Chinese patent of Patent No. CN205907766U discloses one kind and defends Caisson integral waterproofing structure between life, this patent are directly poured into a mould with cement concrete layer, avoid building waste and haydite combines not Close the case where being susceptible to ponding, while cement concrete layer globality is more preferable, also avoids building waste and haydite corner angle The case where being easily destroyed original waterproof layer and drainage pipeline too much occurs, however the structure is straight on the top of cement concrete layer Laying ceramic tile layer is connect, water is easy to drain to cement concrete layer under ceramic tile surface and gap so as to cause seepy question.
Utility model content
In order to overcome shortcoming and defect existing in the prior art, the purpose of this utility model is to provide a kind of bathrooms Whole backfill structure, the bathroom integrally backfill convenient structure construction, good integrity and can effectively avoid water from ceramic tile surface and Cement concrete layer is drained under gap.
The purpose of this utility model is achieved through the following technical solutions:A kind of bathroom integrally backfills structure, including reinforcing bar Concrete building plate, the foaming cement concrete layer for being set to reinforced concrete floor upper end, be set to foaming cement concrete layer upper end One waterproof layer and the ceramic tile layer for being set to the first waterproof layer upper end are provided with drain header in the foaming cement concrete layer One end of road and secondary drainage pipeline, the secondary drainage pipeline is connected to drain header road, the secondary drainage pipeline it is another Foaming cement concrete layer and ceramic tile layer are run through in one end, and first waterproof layer is waterproof bisque.
Further, the second waterproof layer is provided between the reinforced concrete floor and foaming cement concrete layer.
Further, second waterproof layer is waterproof bisque.
Further, second waterproof layer is waterproof coating layer.
Further, further include filled layer, the foaming cement concrete layer includes being set to reinforced concrete floor upper end Bottom foaming cement concrete layer and the top layer foaming cement concrete layer for being set to ceramic tile layer lower end, the filled layer are located at Between bottom foaming cement concrete layer and top layer foaming cement concrete layer.
Further, the filled layer is one kind in haydite layer or building waste layer.
Further, the outer surface of the secondary drainage pipeline is coated with anticorrosive paint layer.
Further, the upper surface of the ceramic tile layer is provided with impervious barrier.
Further, the impervious barrier is antiseepage clear coat.
The beneficial effects of the utility model are:The utility model passes through between foaming cement concrete layer and ceramic tile layer First waterproof layer is set, the case where water drains to foaming cement concrete layer under between ceramic tile layer surface or gap is effectively reduced, The utility model sets the first waterproof layer to waterproof bisque, and when construction, waterproof powder is directly spread across foaming cement concrete layer Upper end after form the first waterproof layer, construction time and construction volume can be reduced, so as to shorten the entire duration.
Description of the drawings
Fig. 1 is the dimensional structure diagram of embodiment 1;
Fig. 2 is the dimensional structure diagram of embodiment 1.
Reference numeral is:
1- reinforced concrete floors;2- foaming cement concrete layers;The first waterproof layers of 3-;
4- ceramic tile layers;5- drain headers road;6- secondary drainage pipelines;
The second waterproof layers of 7-;8- filled layers;9- impervious barriers;
21- bottom foaming cement concrete layers;22- top layer foaming cement concrete layers.
Specific implementation mode
For the ease of the understanding of those skilled in the art, with reference to embodiment and attached drawing 1-2 to the utility model make into The explanation of one step, the content that embodiment refers to not are the restriction to the utility model.
Embodiment 1
Please refer to attached drawing 1, a kind of bathroom integrally backfills structure, including reinforced concrete floor 1, is set to reinforced concrete floor 1 The foaming cement concrete layer 2 of upper end, the first waterproof layer 3 for being set to 2 upper end of foaming cement concrete layer and it is set to The ceramic tile layer 4 of one waterproof layer, 3 upper end is provided with drain header road 5 and secondary drainage pipeline in the foaming cement concrete layer 2 6, one end of the secondary drainage pipeline 6 is connected to drain header road 5, the other end of the secondary drainage pipeline 6 with through hair Cement concrete layer 2 and ceramic tile layer 4 are steeped, first waterproof layer 2 is waterproof bisque.
The utility model is effectively subtracted by the way that the first waterproof layer 3 is arranged between foaming cement concrete layer 2 and ceramic tile layer 4 The case where few water drains to foaming cement concrete layer 2 under between 4 surface of ceramic tile layer or gap, the utility model is by the first waterproof Layer 3 is set as waterproof bisque, and when construction, the upper end that waterproof powder is directly spread across to foaming cement concrete layer 2 forms the first waterproof Layer 3, can reduce construction time and construction volume, so as to shorten the entire duration.
Further, the second waterproof layer 7 is provided between the reinforced concrete floor 1 and foaming cement concrete layer 2.
The utility model between reinforced concrete floor 1 and foaming cement concrete layer 2 by being arranged the second waterproof layer 7, energy Effectively ponding is avoided to leak into reinforced concrete floor 1.
Further, second waterproof layer 7 is waterproof bisque.
The utility model is by setting the second waterproof layer 7 to waterproof bisque, and when construction, waterproof powder is directly spread across reinforcing bar The upper end of concrete building plate 1 can reduce construction time and construction volume, so as to shorten the entire duration.
Further, second waterproof layer 7 is waterproof coating layer.
The utility model is by setting the second waterproof layer 7 to waterproof coating layer so that the second waterproof layer 7 can preferably cover Lid reinforced concrete floor 1.
Further, the outer surface of the secondary drainage pipeline 6 is coated with anticorrosive paint layer.
The utility model avoids cement, haydite layer by being coated with anticorrosive paint layer in the outer surface of secondary drainage pipeline 6 Or corrosion of the corrosive deposit in building waste layer to secondary drainage pipeline 6, the service life of secondary drainage pipeline 6 is extended, is reduced The chance that secondary drainage pipeline 6 is broken.
Further, the upper end of the ceramic tile layer 4 is provided with impervious barrier 9.
Impervious barrier 9 is arranged in the upper end of ceramic tile layer 4 in the utility model, avoids water under ceramic tile surface or ceramic tile slit source, Seepy question is avoided from source.
Further, the impervious barrier 9 is antiseepage clear coat.
The utility model neither influences the appearance of anti-ceramic tile, and can guarantee by the way that impervious barrier 9 is set as antiseepage clear coat The good water resistance of ceramic tile.
Embodiment 2
Please refer to attached drawing 2, this example difference from example 1 is that:
In the present embodiment, it further includes filled layer 8 that the bathroom, which integrally backfills structure, the foaming cement concrete layer 2 Including the top layer foaming for being set to the bottom foaming cement concrete layer 21 of 1 upper end of reinforced concrete floor, being set to 4 lower end of ceramic tile layer Cement concrete layer 22, the filled layer 8 are located at bottom foaming cement concrete layer 21 and top layer foaming cement concrete layer 22 Between.
The utility model is by setting foaming cement concrete layer 2 to bottom foaming cement concrete layer 21 and top layer hair Cement concrete layer 22 is steeped, filling is set between bottom foaming cement concrete layer 21 and top layer foaming cement concrete layer 22 Layer 8, the gap between filled layer 8 can be filled when pouring into a mould top layer foaming cement concrete layer 22, so that filled layer 8 combines It is even closer, and then ensure also save building cost while leakproof.
Further, the filled layer 8 is haydite layer or building waste layer.
Above-described embodiment is the preferable implementation of the utility model, and in addition to this, the utility model can be with other sides Formula realizes that any obvious replacement is in the protection model of the utility model without departing from the concept of the premise utility Within enclosing.

Claims (9)

1. a kind of bathroom integrally backfills structure, it is characterised in that:Including reinforced concrete floor, it is set to reinforced concrete floor upper end It foaming cement concrete layer, the first waterproof layer for being set to foaming cement concrete layer upper end and is set on the first waterproof layer The ceramic tile layer at end is provided with drain header road and secondary drainage pipeline, the secondary drainage in the foaming cement concrete layer One end of pipeline is connected to drain header road, and the other end of the secondary drainage pipeline runs through foaming cement concrete layer and ceramic tile Layer, first waterproof layer are waterproof bisque.
2. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:The reinforced concrete floor and hair It is provided with the second waterproof layer between bubble cement concrete layer.
3. a kind of bathroom according to claim 2 integrally backfills structure, it is characterised in that:Second waterproof layer is anti- Pigment layer.
4. a kind of bathroom according to claim 2 integrally backfills structure, it is characterised in that:Second waterproof layer is anti- Water paint layer.
5. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:Further include filled layer, it is described Foaming cement concrete layer includes being set to the bottom foaming cement concrete layer of reinforced concrete floor upper end and being set to ceramic tile The top layer foaming cement concrete layer of layer lower end, the filled layer are located at bottom foaming cement concrete layer and top layer foam cement Between concrete layer.
6. a kind of bathroom according to claim 5 integrally backfills structure, it is characterised in that:The filled layer is haydite layer Or one kind in building waste layer.
7. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:The secondary drainage pipeline Outer surface is coated with anticorrosive paint layer.
8. a kind of bathroom according to claim 1 integrally backfills structure, it is characterised in that:The upper surface of the ceramic tile layer It is provided with impervious barrier.
9. a kind of bathroom according to claim 8 integrally backfills structure, it is characterised in that:The impervious barrier is impermeable Bright enamelled coating.
CN201820400988.4U 2018-03-22 2018-03-22 A kind of bathroom integrally backfills structure Active CN208039921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820400988.4U CN208039921U (en) 2018-03-22 2018-03-22 A kind of bathroom integrally backfills structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820400988.4U CN208039921U (en) 2018-03-22 2018-03-22 A kind of bathroom integrally backfills structure

Publications (1)

Publication Number Publication Date
CN208039921U true CN208039921U (en) 2018-11-02

Family

ID=63948062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820400988.4U Active CN208039921U (en) 2018-03-22 2018-03-22 A kind of bathroom integrally backfills structure

Country Status (1)

Country Link
CN (1) CN208039921U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012385A (en) * 2020-07-29 2020-12-01 绍兴文理学院 Waterproof laminated slab and construction method thereof
CN112012384A (en) * 2020-07-29 2020-12-01 绍兴文理学院 One-way laminated slab without ribs at end of close-spliced connecting plate and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012385A (en) * 2020-07-29 2020-12-01 绍兴文理学院 Waterproof laminated slab and construction method thereof
CN112012384A (en) * 2020-07-29 2020-12-01 绍兴文理学院 One-way laminated slab without ribs at end of close-spliced connecting plate and construction method thereof
CN112012385B (en) * 2020-07-29 2022-02-11 绍兴文理学院 Waterproof laminated slab and construction method thereof
CN112012384B (en) * 2020-07-29 2022-02-11 绍兴文理学院 One-way laminated slab without ribs at end of close-spliced connecting plate and construction method thereof

Similar Documents

Publication Publication Date Title
CN202745335U (en) Sunken type toilet water-resistant deodorization settling basin structure
CN209457166U (en) A kind of subsided rest room caisson entirety overhead type waterproof construction
CN208039921U (en) A kind of bathroom integrally backfills structure
CN208777468U (en) A kind of kitchen and bath's water-proofing anticracking structure
CN208501802U (en) A kind of bathroom caisson internal drainage construction
CN214246017U (en) Secondary drainage structure of toilet
CN212926506U (en) Bathroom threshold stone waterproof construction
CN212129250U (en) Construction structure for additionally arranging collecting groove on post-cast strip of high-water-level foundation
CN208668952U (en) A kind of kitchen drainage standpipe through-flooring structure
CN208380085U (en) The draining pipe-through floor slab structure of a kind of ground leak
CN210508097U (en) Novel roof deformation joint structure
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN207847399U (en) A kind of window construction of house
CN207646973U (en) A kind of vacation wall heel row formula co-layer draining waterproof system and the building including the system
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall
CN212926756U (en) Waterproof joint structure of flue root
CN208518393U (en) A kind of caisson of toilet with Bars In Poured Concrete Slab
CN211548589U (en) Dampproofing structure in bathroom
CN207295866U (en) Caisson of toilet secondary drainage system
CN211313129U (en) Inclined parapet internal corner waterproof node structure
CN207846692U (en) A kind of water proof structure of floor and steel pipe column intersection
CN209227915U (en) A kind of vertical water pipe of roofing falls the waterproof construction of mouth
CN207499072U (en) toilet
CN208473213U (en) A kind of ground waterproof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210622

Address after: Room b701, 7th floor, Jiahe New Times Plaza, 380 Helong 1st Road, Helong street, Baiyun District, Guangzhou, Guangdong 510000

Patentee after: Guangzhou sharing Building Materials Technology Co.,Ltd.

Address before: 523000 4th floor, building a, Gaolong Science Park, Xiaoyong village, Gaopo Town, Dongguan City, Guangdong Province

Patentee before: Chen Yizhou