CN203429798U - Embedded bar structure for horizontal secondary structure of super high-rise - Google Patents
Embedded bar structure for horizontal secondary structure of super high-rise Download PDFInfo
- Publication number
- CN203429798U CN203429798U CN201320424260.2U CN201320424260U CN203429798U CN 203429798 U CN203429798 U CN 203429798U CN 201320424260 U CN201320424260 U CN 201320424260U CN 203429798 U CN203429798 U CN 203429798U
- Authority
- CN
- China
- Prior art keywords
- embedded
- embedded bar
- super high
- horizontal secondary
- wire casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides an embedded bar structure for a horizontal secondary structure of a super high-rise. The embedded bar structure comprises an embedded slot and an embedded bar, wherein the embedded slot is formed in the intersecting position of the horizontal secondary structure and a core tube vertical wall body structure of the super high-rise, the embedded bar is bent to form an anchoring section and a pre-embedded section, the embedded section is folded into the embedded slot, and the anchoring section penetrates out of the embedded slot. According to the technical scheme, the embedded bar structure for the horizontal secondary structure of the super high-rise can ensure accuracy of the embedded bar, ensure quality of the embedded bar, reduce damage to a core tube caused by post stage chiseling and save cost and construction time. Rubbish and debris which are produced in the chiseling process can be avoided by the adoption of an embedded body made of a PVC material.
Description
Technical field
The utility model relates to embedded bar structure in Construction of Civil Engineering process, relates in particular to the horizontal secondary structure embedded bar of a kind of Super High structure.
Background technology
The current form of structure of steel structure frame-concrete core cylinder super highrise building multiselect for, the Core Walls Structure of this form of structure and outside framework graded crossing are constructed, and first carry out the construction of vertical Core Walls Structure, then carry out level to the construction of plate.Due to the construction of Core Walls Structure vertical structure and plate level structure staggered floor, and Core Walls Structure adopts punching block system more, certainly will cause horizontal secondary structure and vertical core wall structure reinforcing bar connectivity problem.How to carry out horizontal secondary structure reinforcing bar and be connected with Core Walls Structure embedded bar, become a difficult problem in the method real world applications.Traditional structure to be adopted direct pre-buried or uses the methods such as cystosepiment filling to solve this difficult problem, but uses said method often to take time and effort, and has the pre-buried deviation of reinforcing bar, beats the inconvenient easy deficiencies such as pollution that produce of cutter.
Summary of the invention
For overcoming the existing defect of prior art, now provide the horizontal secondary structure embedded bar of a kind of Super High structure.This structure can guarantee accuracy and the quality of embedded bar, and reduces the later stage and play the damage of cutter to Core Walls Structure.
The utility model provides the horizontal secondary structure embedded bar of a kind of Super High structure, and it comprises pre-buried wire casing, and described pre-buried wire casing is arranged on horizontal secondary structure and the vertical wall body structure of Super High Core Walls Structure junction; And embedded bar, described embedded bar is bent to form an anchoring section and an embedded section, and described embedded section is folded in described pre-buried wire casing, and described anchoring section wears out described pre-buried wire casing.
Further improvement of the utility model is: the first side of pre-buried wire casing is formed with embedded bar installing hole.
Further improvement of the utility model is: the second side of pre-buried wire casing is formed with opening, when concreting, by a dismountable wiring duct cover is installed, seals.
The technical scheme that adopts the utility model to provide is carried out the accuracy that the horizontal secondary structure embedded bar construction of Super High can be guaranteed embedded bar, guarantees the quality of embedded bar, and reduce the later stage and play the damage of cutter to Core Walls Structure, and cost saving and engineering time.By adopting the embedded body of PVC material, can also avoid beating the rubbish fragment producing in cutter process.
Accompanying drawing explanation
Fig. 1 is a lateral view of the embedded bar of the horizontal secondary structure embedded bar of the utility model Super High job practices;
Fig. 2 is the lateral plan of the pre-buried wire casing of the horizontal secondary structure embedded bar of the utility model Super High job practices;
Fig. 3 is the view that the pre-buried wire casing of the horizontal secondary structure embedded bar of the utility model Super High job practices is provided with wiring duct cover one side;
Fig. 4 is that in the horizontal secondary structure embedded bar of the utility model Super High job practices, the embedded bar of embedded bar after packing into packs the cross sectional view after pre-buried wire casing into;
Fig. 5 is lateral view during installation form outside pre-buried wire casing in the horizontal secondary structure embedded bar of the utility model Super High job practices;
Fig. 6 is that in the horizontal secondary structure embedded bar of the utility model Super High job practices, the vertical walls concrete of Super High Core Walls Structure has been built lateral plan afterwards;
Fig. 7 is lateral view during embedded bar installation in the horizontal secondary structure embedded bar of the utility model Super High job practices.
The specific embodiment
As shown in Figure 1, the embedded bar 10 using in the utility model is formed by a reinforcing bar bending, and after bending, embedded bar 10 is divided into two sections: anchoring section 11 and embedded section 12.In concreting process, anchoring section 11 colligations are in the vertical wall body structure 31 of Super High Core Walls Structure to be built, and embedded section 12 is fixed in pre-buried wire casing 20.
As shown in Figure 2 or Figure 3, pre-buried wire casing 20 is hollow box body of the four sides closure that processed by PVC plate, and the first side of pre-buried wire casing 20 arranges embedded bar installing hole 21, and the second side of pre-buried wire casing 20 is provided with a dismountable wiring duct cover 22.
With reference to figure 3~Fig. 7, the utility model provides the horizontal secondary structure embedded bar of a kind of Super High structure, and its job practices comprises the following steps: 1) processing embedded bar 10, is bent to form an anchoring section 11 and an embedded section 12 to embedded bar 10; 2) 12 foldings of the embedded section of embedded bar are entered to pre-buried wire casing 20, and make anchoring section 11 wear out pre-buried wire casing 20; 3) the pre-buried wire casing 20 that embedded bar 10 is housed is arranged on to horizontal secondary structure and the vertical wall body structure of Super High Core Walls Structure junction, by anchoring section 11 colligations in the vertical wall body structure 31 of Super High Core Walls Structure to be built; 4) installation form 30, build the vertical wall body structure of Super High Core Walls Structure; 5) stripping 30, open pre-buried wire casing 20, the embedded section 12 of straightening embedded bar.
Below the present embodiment is described further:
Make embedded bar 10 as shown in Figure 1 and pre-buried wire casing 20 as shown in Figure 2.The length of the anchoring section 11 of embedded bar 10 will reach the requirement of anchoring body of wall length.Pre-buried wire casing 20 adopts PVC plate as material, make a hollow box body, on pre-buried wire casing 20 first sides, according to factors such as the bar diameter size of standard and design drawing requirement, embedded board muscle spacing, thicknesss of slab, get out embedded bar installing hole 21 afterwards, a dismountable wiring duct cover 22 is installed in the second side of pre-buried wire casing 20.
As shown in Figure 4, the wiring duct cover of pre-buried wire casing 20 22 is opened, the embedded bar 10 that blanking is good is embedded in built-in line groove 20 in advance along opening embedded bar installing hole 21, then wiring duct cover 22 is closed.Finally by the wire casing 20 that installs embedded ribs according to design drawing requirement, be placed on level board and the vertical body of wall of Super High Core Walls Structure junction, then anchoring section 11 is inserted and colligation in the vertical wall body structure 31 of Super High Core Walls Structure to be built, then in the outside of the vertical body of wall of Super High Core Walls Structure, mixed template 30 is installed, the sectional view of the vertical body of wall of Core Walls Structure after installation form 30 as shown in Figure 5.
Claims (3)
1. the horizontal secondary structure embedded bar of a Super High structure, is characterized in that comprising:
Pre-buried wire casing, described pre-buried wire casing is arranged on horizontal secondary structure and the vertical wall body structure of Super High Core Walls Structure junction;
And embedded bar, described embedded bar is bent to form an anchoring section and an embedded section, and described embedded section is folded in described pre-buried wire casing, and described anchoring section wears out described pre-buried wire casing.
2. the horizontal secondary structure embedded bar of Super High as claimed in claim 1 structure, is characterized in that the first side of described pre-buried wire casing is formed with embedded bar installing hole.
3. the horizontal secondary structure embedded bar of Super High as claimed in claim 1 structure, is characterized in that the second side of described pre-buried wire casing is formed with opening, when concreting, by a dismountable wiring duct cover is installed, seals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320424260.2U CN203429798U (en) | 2013-07-16 | 2013-07-16 | Embedded bar structure for horizontal secondary structure of super high-rise |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320424260.2U CN203429798U (en) | 2013-07-16 | 2013-07-16 | Embedded bar structure for horizontal secondary structure of super high-rise |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203429798U true CN203429798U (en) | 2014-02-12 |
Family
ID=50058846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320424260.2U Expired - Fee Related CN203429798U (en) | 2013-07-16 | 2013-07-16 | Embedded bar structure for horizontal secondary structure of super high-rise |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203429798U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485537A (en) * | 2013-07-16 | 2014-01-01 | 中国建筑第八工程局有限公司 | Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure |
CN109680804A (en) * | 2017-10-18 | 2019-04-26 | 五冶集团上海有限公司 | Secondary structure reinforcing bar exempts from pore reinforced construction method |
CN112096072A (en) * | 2020-08-21 | 2020-12-18 | 上海欧跃建筑安装工程有限公司 | Beam slab lagging wall column same-layer synchronous concrete pouring method for building machine |
-
2013
- 2013-07-16 CN CN201320424260.2U patent/CN203429798U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485537A (en) * | 2013-07-16 | 2014-01-01 | 中国建筑第八工程局有限公司 | Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure |
CN103485537B (en) * | 2013-07-16 | 2016-01-20 | 中国建筑第八工程局有限公司 | Super High horizontal secondary structure embedded bar construction method and structure thereof |
CN109680804A (en) * | 2017-10-18 | 2019-04-26 | 五冶集团上海有限公司 | Secondary structure reinforcing bar exempts from pore reinforced construction method |
CN112096072A (en) * | 2020-08-21 | 2020-12-18 | 上海欧跃建筑安装工程有限公司 | Beam slab lagging wall column same-layer synchronous concrete pouring method for building machine |
CN112096072B (en) * | 2020-08-21 | 2022-06-07 | 上海欧跃建筑安装工程有限公司 | Beam slab lagging wall column same-layer synchronous concrete pouring method for building machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103485537B (en) | Super High horizontal secondary structure embedded bar construction method and structure thereof | |
CN106088148B (en) | Pipe gallery template and its application | |
CN102691415A (en) | Bridge embedded part and method for mounting bridge using bridge embedded part | |
CN205400043U (en) | Constructional column is funnel combination tool for concreting | |
CN103556819B (en) | A kind of construction method of reserved constructional column hole on beam slab | |
CN104264883A (en) | Concrete slab reserved hole structure and construction method thereof | |
CN106120807A (en) | Permanent foundation pit enclosure soil cement rigid wall and construction method thereof | |
CN203429798U (en) | Embedded bar structure for horizontal secondary structure of super high-rise | |
CN102373713B (en) | Construction method and device for preserved hole of equipment foundation bolt | |
CN105019651B (en) | Hollow brick fills wall into the efficient installation engineering method of winding box | |
CN206888506U (en) | The cast-in-place system of formwork structure and shear wall of shear wall angle node | |
CN103590599B (en) | From compacted clamping apparatus and using method | |
CN204059953U (en) | Hang mould prefab form | |
CN102352690B (en) | Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube | |
CN204098489U (en) | A kind of mould making concrete floorslab preformed hole | |
CN202596173U (en) | Embedded part for cable bridge | |
CN209163138U (en) | A kind of reservation device of the floor reserved steel bar for climbing formwork for construction | |
CN203924102U (en) | Building implements foundation bolt preformed hole construction mould | |
CN106567543A (en) | Slab-bottom structural concrete column reserved hole construction method | |
CN103680288B (en) | A kind of tunnel micro-benching tunnelling method technique teaching simulation body | |
CN203411992U (en) | Reserved hole template of deep hole in mass concrete | |
CN210947733U (en) | Splicing reservation device for square opening of civil and electrical wiring duct of building | |
CN208337097U (en) | Suit wears reinforcing bar wire box | |
CN203238939U (en) | Template of preset pulling bar | |
CN209633318U (en) | A kind of split-type small-sized prefabricated member steam curing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140212 Termination date: 20190716 |
|
CF01 | Termination of patent right due to non-payment of annual fee |