CN106120807A - Permanent foundation pit enclosure soil cement rigid wall and construction method thereof - Google Patents
Permanent foundation pit enclosure soil cement rigid wall and construction method thereof Download PDFInfo
- Publication number
- CN106120807A CN106120807A CN201610598960.1A CN201610598960A CN106120807A CN 106120807 A CN106120807 A CN 106120807A CN 201610598960 A CN201610598960 A CN 201610598960A CN 106120807 A CN106120807 A CN 106120807A
- Authority
- CN
- China
- Prior art keywords
- vertical
- shaped steel
- foundation pit
- cement
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses a kind of permanent foundation pit enclosure soil cement rigid wall and construction method thereof, aim to provide a kind of can be on the premise of the intensity not affecting foundation pit enclosure and permanent construction foundation pit side-wall, effectively reduce construction procedure, shorten permanent foundation pit enclosure soil cement rigid wall and the construction method thereof in construction cycle.Permanent foundation pit enclosure soil cement rigid wall includes cement soil continuous wall and the shaped steel combination supporting construction being plugged in cement soil continuous wall, shaped steel combination supporting construction includes some vertical shaped steel being arranged in order distribution, is connected by eye-splice attachment structure between adjacent two vertical shaped steel.The construction method of permanent foundation pit enclosure soil cement rigid wall, comprises the following steps: first successively, the cement soil continuous wall of one section of preseting length of construction;Second, vertical shaped steel is inserted in cement soil continuous wall one by one, is connected by eye-splice attachment structure between adjacent two vertical shaped steel;3rd, return the first step and continue construction.
Description
Technical field
The present invention relates to foundation pit enclosure field, be specifically related to a kind of permanent foundation pit enclosure soil cement rigid wall and construction thereof
Method.
Background technology
Building or the foundation pit construction of structures, be usually and first carry out going along with sb. to guard him of foundation ditch, then excavate.Current foundation ditch encloses
Protect the mode combined with water-stop curtain frequently with colonnade formula stake, or (usual soil cement stirs to use the mode of cement mixing method
Mix the shaped steel that can insert some Disjunct distribution in stake);But the foundation pit enclosure of these forms is interim measure, for construction building or structure
Build the transitional arrangement that the foundation ditch of thing is taked.
When excavation of foundation pit on earth after, in addition it is also necessary to carrying out the construction of building foundation pit sidewall in foundation ditch, building foundation pit sidewall is adopted
Taking formwork and lay reinforcing bar, then pouring reinforcement concrete forms permanent building foundation pit sidewall (i.e. sidewall of basement), connects
Needs and fill out husky to eliminate gap between building foundation pit sidewall and foundation pit enclosure, finally, the shaped steel in foundation pit enclosure is extracted
Recycle.Although the form of construction work that the foundation pit enclosure of current this interim measure is combined with permanent building foundation pit sidewall
Ensure that the intensity of building foundation pit sidewall, but its construction procedure is complicated, extends the construction cycle.
Summary of the invention
The invention aims to overcome the deficiencies in the prior art, it is provided that one can be enclosed not affecting foundation ditch
Protect and on the premise of the intensity of permanent construction foundation pit side-wall, effectively reduce construction procedure, shorten the permanent of construction cycle
Property foundation pit enclosure soil cement rigid wall and construction method thereof.
The technical scheme is that
A kind of permanent foundation pit enclosure soil cement rigid wall, including cement soil continuous wall and the type that is plugged in cement soil continuous wall
Steel integral supporting structure, described shaped steel combination supporting construction includes that some length directions along cement soil continuous wall are arranged in order point
It is connected by eye-splice attachment structure between the vertical shaped steel of cloth, and adjacent two vertical shaped steel.
The foundation pit enclosure soil cement rigid wall of this programme acts not only as the foundation pit enclosure of construction building or structures,
During excavation pit, the pushing of collapsing in foundation ditch of the soil body stopped outside hole can be played, it is achieved the safe excavation of foundation ditch;And due to
The vertical shaped steel plugged in cement soil continuous wall, is connected by eye-splice attachment structure between adjacent two vertical shaped steel thus is formed
Continuous print shaped steel body of wall, thus terminate when excavation of foundation pit, it is also possible to take on the effect of permanent building foundation pit sidewall, can in order to avoid
Except the construction (i.e. sidewall of basement construction) of building foundation pit sidewall and fill out between building foundation pit sidewall and foundation pit enclosure husky with
Eliminate the construction procedure in gap.Thus this programme can not affect the intensity of foundation pit enclosure and permanent construction foundation pit side-wall
Under premise, effectively reduce construction procedure, shorten the construction cycle.
As preferably, eye-splice attachment structure is by the vertical slot being arranged on a vertical shaped steel and is arranged on another vertical type
The vertical plug-in unit matched on steel and with vertical slot.This programme connects adjacent two by vertical slot with vertical plug-in unit and erects
It is easy to practice of construction operation to shaped steel.
As preferably, vertical shaped steel is H profile steel, and the vertical slot of described eye-splice attachment structure is arranged on perpendicular with vertical plug-in unit
On the flange plate edge of shaped steel.
As preferably, between the web of adjacent two vertical shaped steel, form the receiving cavity of upper/lower terminal opening.This programme is tied
Full water earth will be filled in the receiving cavity of structure, so can improve the knot between vertical shaped steel and cement soil continuous wall further
Close intensity, and then improve stability and the intensity of permanent foundation pit enclosure soil cement rigid wall.
As preferably, vertical plug-in unit collectively forms T-shaped plug connector with the flange plate of vertical shaped steel.
As preferably, vertical plug-in unit is to be arranged on the flange plate edge of vertical shaped steel and perpendicular with flange plate vertical
Plate, and the width of vertical plate is more than the thickness of flange plate.
As preferably, vertical plug-in unit is the vertical inserted link being arranged on the flange plate edge of vertical shaped steel, and vertically inserted link
Internal diameter more than the thickness of flange plate.
As preferably, vertical slot is C-channel or T-slot or dovetail groove.
As preferably, the both ends open up and down of vertical slot.Due to the lower ending opening of vertical slot, so when vertical shaped steel
After inserting in cement soil continuous wall, soil cement will enter in vertical slot, and the pore filling in eye-splice attachment structure is full, work as water
Eye-splice attachment structure can be effectively improved after clay solidifying and connect the reliability and stability of adjacent two vertical shaped steel;And vertically insert
The upper end open of groove, so just can realize during second and follow-up vertical shaped steel insert in cement soil continuous wall
By eye-splice attachment structure, adjacent two vertical shaped steel are linked together, beneficially practice of construction operation.
The construction method of a kind of permanent foundation pit enclosure soil cement rigid wall, comprises the following steps successively:
First, along the cement soil continuous wall making one section of preseting length of wall direction construction in foundation soil;
Second, vertical shaped steel is inserted in cement soil continuous wall by length direction along cement soil continuous wall one by one, and when vertical
After shaped steel inserts in cement soil continuous wall, it is connected by eye-splice attachment structure between adjacent two vertical shaped steel, thus at cement
Continuous print shaped steel body of wall is formed in soil diaphragm wall;
3rd, return the first step and continue construction.
The invention has the beneficial effects as follows: can be before the intensity not affecting foundation pit enclosure and permanent construction foundation pit side-wall
Put, effectively reduce construction procedure, shorten the construction cycle.
Accompanying drawing explanation
Fig. 1 is the permanent foundation pit enclosure soil cement rigid wall top view of the present invention.
Fig. 2 is the partial enlarged drawing in Fig. 1 at A.
In figure: cement soil continuous wall 1;Shaped steel combination supporting construction 2, vertical shaped steel 21, web 211, flange plate 212, insert
Locking connection structure 22, vertical slot 221, vertical plug-in unit 222, receiving cavity 3.
Detailed description of the invention
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings:
Embodiment 1: as shown in Figure 1 and Figure 2, a kind of permanent foundation pit enclosure soil cement rigid wall includes cement soil continuous wall 1 and inserts
The shaped steel combination supporting construction 2 being located in cement soil continuous wall.
Shaped steel combination supporting construction includes that some length directions along cement soil continuous wall are arranged in order the vertical type of distribution
It is connected by eye-splice attachment structure 22 between steel 21, and adjacent two vertical shaped steel.Vertical shaped steel is H profile steel.Vertical shaped steel erects
Straight setting.The receiving cavity 3 of upper/lower terminal opening is formed between the web 211 of adjacent two vertical shaped steel.The surrounding of receiving cavity
Close.Full water earth is filled in receiving cavity.
Eye-splice attachment structure is by the vertical slot 221 being arranged on a vertical shaped steel and is arranged on another vertical shaped steel also
The vertical plug-in unit 222 matched with vertical slot.The vertically both ends open up and down of slot.Vertically slot be C-channel or T-slot or
Dovetail groove.The vertical slot of eye-splice attachment structure and vertical plug-in unit are arranged on the edge of flange plate 212 of vertical shaped steel.
Vertically plug-in unit collectively forms T-shaped plug connector with the flange plate of vertical shaped steel.
Vertically plug-in unit is to be arranged on the flange plate edge of vertical shaped steel and the vertical plate perpendicular with flange plate, and perpendicular
The width of straight cutting plate is more than the thickness of flange plate.
Vertically plug-in unit can also be for the vertical inserted link being arranged on the flange plate edge of vertical shaped steel, and vertical inserted link is interior
Footpath is more than the thickness of flange plate.
Embodiment 2, construction method (the permanent foundation ditch of the present embodiment of a kind of permanent foundation pit enclosure soil cement rigid wall
Go along with sb. to guard him the concrete structure of soil cement rigid wall with reference to embodiment 1), comprise the following steps successively:
First, along the cement soil continuous wall making one section of preseting length of wall direction construction in foundation soil.Cement in the present embodiment
The preseting length of soil diaphragm wall is 8-12 rice.
Second, vertical shaped steel is inserted in cement soil continuous wall by length direction along cement soil continuous wall one by one, and works as
After vertical shaped steel inserts in cement soil continuous wall, it is connected by eye-splice attachment structure between adjacent two vertical shaped steel, thus
Continuous print shaped steel body of wall is formed in cement soil continuous wall.
The Specific construction process of this step is as follows: first, inserts first vertical shaped steel at cement soil continuous wall;Then,
Second vertical shaped steel is inserted at cement soil continuous wall, during second vertical shaped steel inserts in cement soil continuous wall,
Vertical slot between second vertical shaped steel and first vertical shaped steel coordinates with vertical plug-in unit;Followed by, at soil cement even
Continuous wall inserts the 3rd vertical shaped steel, and during the 3rd vertical shaped steel inserts in cement soil continuous wall, the 3rd vertical
Vertical slot between shaped steel and second vertical shaped steel coordinates with vertical plug-in unit;So, along the length side of cement soil continuous wall
Insert in cement soil continuous wall one by one to by vertical shaped steel, and during vertical shaped steel inserts in cement soil continuous wall,
Vertical slot between this vertical shaped steel and adjacent vertical shaped steel coordinates with vertical plug-in unit.
3rd, return the first step and continue construction.
Claims (10)
1. a permanent foundation pit enclosure soil cement rigid wall, is characterized in that, including cement soil continuous wall and be plugged in soil cement
Shaped steel combination supporting construction in diaphragm wall, described shaped steel combination supporting construction includes some length sides along cement soil continuous wall
To being arranged in order the vertical shaped steel of distribution, and it is connected by eye-splice attachment structure between adjacent two vertical shaped steel.
One the most according to claim 1 permanent foundation pit enclosure soil cement rigid wall, is characterized in that, described eye-splice connects
Structure is by the vertical slot that is arranged on a vertical shaped steel and is arranged on another vertical shaped steel and matches with vertical slot
Vertically plug-in unit.
One the most according to claim 2 permanent foundation pit enclosure soil cement rigid wall, is characterized in that, described vertical shaped steel
For H profile steel, the vertical slot of described eye-splice attachment structure and vertical plug-in unit are arranged on the flange plate edge of vertical shaped steel.
One the most according to claim 3 permanent foundation pit enclosure soil cement rigid wall, is characterized in that, adjacent two vertical types
The receiving cavity of upper/lower terminal opening is formed between the web of steel.
5., according to the permanent foundation pit enclosure soil cement rigid wall of the one described in claim 3 or 4, it is characterized in that, described vertically
Plug-in unit collectively forms T-shaped plug connector with the flange plate of vertical shaped steel.
6., according to the permanent foundation pit enclosure soil cement rigid wall of the one described in claim 3 or 4, it is characterized in that, described vertically
Plug-in unit is to be arranged on the flange plate edge of vertical shaped steel and the vertical plate perpendicular with flange plate, and the width of vertical plate
Thickness more than flange plate.
7., according to the permanent foundation pit enclosure soil cement rigid wall of the one described in claim 3 or 4, it is characterized in that, described vertically
Plug-in unit is the vertical inserted link being arranged on the flange plate edge of vertical shaped steel, and the internal diameter of vertical inserted link is more than the thickness of flange plate
Degree.
8., according to the one permanent foundation pit enclosure soil cement rigid wall described in claim 1 or 2 or 3 or 4, it is characterized in that, institute
Stating vertical slot is C-channel or T-slot or dovetail groove.
9., according to the one permanent foundation pit enclosure soil cement rigid wall described in claim 1 or 2 or 3 or 4, it is characterized in that, institute
State the both ends open up and down of vertical slot.
10. a construction method for permanent foundation pit enclosure soil cement rigid wall, is characterized in that, comprise the following steps successively:
First, along the cement soil continuous wall making one section of preseting length of wall direction construction in foundation soil;
Second, vertical shaped steel is inserted in cement soil continuous wall by length direction along cement soil continuous wall one by one, and when vertical
After shaped steel inserts in cement soil continuous wall, it is connected by eye-splice attachment structure between adjacent two vertical shaped steel, thus at cement
Continuous print shaped steel body of wall is formed in soil diaphragm wall;
3rd, return the first step and continue construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610598960.1A CN106120807A (en) | 2016-07-27 | 2016-07-27 | Permanent foundation pit enclosure soil cement rigid wall and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610598960.1A CN106120807A (en) | 2016-07-27 | 2016-07-27 | Permanent foundation pit enclosure soil cement rigid wall and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106120807A true CN106120807A (en) | 2016-11-16 |
Family
ID=57289795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610598960.1A Pending CN106120807A (en) | 2016-07-27 | 2016-07-27 | Permanent foundation pit enclosure soil cement rigid wall and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120807A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638616A (en) * | 2016-11-30 | 2017-05-10 | 上海市机械施工集团有限公司 | Foundation pit engineering steel box cement-soil diaphragm wall and construction method thereof |
CN108018853A (en) * | 2017-12-18 | 2018-05-11 | 华东交通大学 | The design method of U-shaped steel negative and positive lock-type steel pipe pile enclosing structure |
CN108221957A (en) * | 2018-03-12 | 2018-06-29 | 中铁第四勘察设计院集团有限公司 | A kind of continuous underground wall structure |
CN108468339A (en) * | 2018-05-21 | 2018-08-31 | 江苏宁土工程技术有限公司 | A kind of skeleton pattern foundation pit supporting structure and outer wall of basement assembling structure and its construction method |
CN108951611A (en) * | 2018-07-20 | 2018-12-07 | 浙江吉通地空建筑科技有限公司 | Canal formula cuts assembled underground continuous wall and construction method |
CN109083128A (en) * | 2018-09-10 | 2018-12-25 | 浙江吉通地空建筑科技有限公司 | Fashioned iron column assembled underground continuous wall with high-bearing capacity |
CN109518696A (en) * | 2018-11-02 | 2019-03-26 | 东通岩土科技股份有限公司 | Assembled manomelia diaphram wall |
CN109537600A (en) * | 2018-10-29 | 2019-03-29 | 东通岩土科技股份有限公司 | Foundation pit enclosure wall assembled all steel crown beam |
CN118087702B (en) * | 2024-04-29 | 2024-06-28 | 河南宏建建设发展有限公司 | Prefabricated assembled beam column node connection structure and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030010407A (en) * | 2001-07-27 | 2003-02-05 | 정란 | A fiber reinforced earth retaining wall, a constructing method thereof, and a composite underground wall structure using thereof |
CN101666086A (en) * | 2009-08-11 | 2010-03-10 | 上海建工(集团)总公司 | Cement cast-in-situ pile of prefabricated part and construction method thereof |
CN105220696A (en) * | 2015-09-08 | 2016-01-06 | 上海市基础工程集团有限公司 | Rotating-milling formula deep-layer stirring construction method of enclosure structure |
CN105442614A (en) * | 2015-11-19 | 2016-03-30 | 浙江桐砚建筑规划设计有限公司 | Construction method for foundation pit support |
CN105507330A (en) * | 2015-12-02 | 2016-04-20 | 浙江工业大学 | Foundation pit supporting structure and construction method thereof |
-
2016
- 2016-07-27 CN CN201610598960.1A patent/CN106120807A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030010407A (en) * | 2001-07-27 | 2003-02-05 | 정란 | A fiber reinforced earth retaining wall, a constructing method thereof, and a composite underground wall structure using thereof |
CN101666086A (en) * | 2009-08-11 | 2010-03-10 | 上海建工(集团)总公司 | Cement cast-in-situ pile of prefabricated part and construction method thereof |
CN105220696A (en) * | 2015-09-08 | 2016-01-06 | 上海市基础工程集团有限公司 | Rotating-milling formula deep-layer stirring construction method of enclosure structure |
CN105442614A (en) * | 2015-11-19 | 2016-03-30 | 浙江桐砚建筑规划设计有限公司 | Construction method for foundation pit support |
CN105507330A (en) * | 2015-12-02 | 2016-04-20 | 浙江工业大学 | Foundation pit supporting structure and construction method thereof |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638616A (en) * | 2016-11-30 | 2017-05-10 | 上海市机械施工集团有限公司 | Foundation pit engineering steel box cement-soil diaphragm wall and construction method thereof |
CN108018853A (en) * | 2017-12-18 | 2018-05-11 | 华东交通大学 | The design method of U-shaped steel negative and positive lock-type steel pipe pile enclosing structure |
CN108221957A (en) * | 2018-03-12 | 2018-06-29 | 中铁第四勘察设计院集团有限公司 | A kind of continuous underground wall structure |
CN108468339A (en) * | 2018-05-21 | 2018-08-31 | 江苏宁土工程技术有限公司 | A kind of skeleton pattern foundation pit supporting structure and outer wall of basement assembling structure and its construction method |
CN108951611A (en) * | 2018-07-20 | 2018-12-07 | 浙江吉通地空建筑科技有限公司 | Canal formula cuts assembled underground continuous wall and construction method |
CN109083128A (en) * | 2018-09-10 | 2018-12-25 | 浙江吉通地空建筑科技有限公司 | Fashioned iron column assembled underground continuous wall with high-bearing capacity |
CN109537600A (en) * | 2018-10-29 | 2019-03-29 | 东通岩土科技股份有限公司 | Foundation pit enclosure wall assembled all steel crown beam |
CN109518696A (en) * | 2018-11-02 | 2019-03-26 | 东通岩土科技股份有限公司 | Assembled manomelia diaphram wall |
CN109518696B (en) * | 2018-11-02 | 2020-09-01 | 东通岩土科技股份有限公司 | Assembled short-limb underground continuous wall |
CN118087702B (en) * | 2024-04-29 | 2024-06-28 | 河南宏建建设发展有限公司 | Prefabricated assembled beam column node connection structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120807A (en) | Permanent foundation pit enclosure soil cement rigid wall and construction method thereof | |
CN106703814B (en) | Tunneling subway station hole pile construction method | |
CN107313431B (en) | Close on not contour foundation pit method for synchronously constructing | |
CN111411993A (en) | Large-section tunnel supporting system penetrating through huge karst cave hall and construction method | |
CN103806464B (en) | Large-scale high ferro station and subway cross top-down construction method up and down | |
CN103924987B (en) | A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof | |
CN110374134A (en) | A kind of combined member increased suitable for retaining wall and construction method | |
CN113550317B (en) | Permanent-temporary combined supporting structure and construction method for open excavation reverse construction foundation pit of large shield starting well | |
CN103485537A (en) | Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure | |
CN109518696A (en) | Assembled manomelia diaphram wall | |
CN111485901A (en) | Method for building side-span non-filling type long and narrow shallow bottom karst cave section tunnel | |
CN103758207B (en) | Semi-prefabricated semi-cast-in-place type frame structure of integrated building and construction method thereof | |
KR101038945B1 (en) | A filling structure of upper part of a tunnel and its procedure | |
CN103437779A (en) | Construction method for renovating tunnel lining water seeping damage | |
CN203796288U (en) | Water seepage prevention structure used for shield entrance door employing SMW piles | |
CN112681334A (en) | Deep foundation pit side wall concrete pouring construction structure and method | |
CN108104112B (en) | A kind of underground wall body construction method based on the slurrying of original soil original position | |
CN106193120A (en) | Basement is encorbelmented, and base plate is inverse makees structure and construction method | |
CN108086302B (en) | A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process | |
CN206034455U (en) | Soil cement rigid wall is gone along with sb. to guard him to foundation ditch | |
CN209293050U (en) | A kind of assembled manomelia diaphram wall | |
CN206220558U (en) | Old City Wall door opening ruggedized construction | |
CN202596173U (en) | Embedded part for cable bridge | |
CN206204929U (en) | A kind of lattice underground continuous wall connector structure | |
CN205152958U (en) | Novel combination steel sheet pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161116 |
|
RJ01 | Rejection of invention patent application after publication |