CN105507330A - Foundation pit supporting structure and construction method thereof - Google Patents

Foundation pit supporting structure and construction method thereof Download PDF

Info

Publication number
CN105507330A
CN105507330A CN201510873293.9A CN201510873293A CN105507330A CN 105507330 A CN105507330 A CN 105507330A CN 201510873293 A CN201510873293 A CN 201510873293A CN 105507330 A CN105507330 A CN 105507330A
Authority
CN
China
Prior art keywords
shaped steel
mixing pile
soil
cement
cement mixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510873293.9A
Other languages
Chinese (zh)
Inventor
许四法
冯斌
严熙
王哲
许斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN201510873293.9A priority Critical patent/CN105507330A/en
Publication of CN105507330A publication Critical patent/CN105507330A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Abstract

The invention discloses a foundation pit supporting structure and a construction method thereof. The foundation pit supporting structure comprises a drill hole preset in advance according to a setting position; the drill hole is internally provided with a cement mixing pile for improving the strength of a foundation; the inner side of the cement mixing pile is close to a soil body of the cement mixing pile, and profile steel for improving the rigidity of the supporting structure is arranged at intervals along the width direction of the cement mixing pile; and the profile steel is interconnected by using reinforcing steel bars. According to the foundation pit supporting structure, the profile steel is placed in the soil body beside the cement mixing pile, so that the rigidity of the supporting structure is improved, and the profile steel can be more conveniently taken out and recycled; and the foundation pit supporting structure has a favorable supporting effect.

Description

A kind of foundation pit enclosure structure and construction method thereof
Technical field
The present invention relates to a kind of foundation pit enclosure structure and construction method thereof.
Background technology
Publication number is that the Chinese patent of CN102926382A discloses a kind of enclosing method, and it lifts by crane shaped steel at once after completing boring, slip casting, stirring by a SMW engineering method stake machine and it is accurately inserted the work in cement earth pile.This invention, by boring, slip casting and agitating procedure in soil, makes cement soil continuous wall jointly form with the shaped steel inserted wherein the structure having and resist bending and shear action.But it is more difficult shaped steel to be pulled out recycling.
Traditional SMW engineering method is a kind of employing stiffness Composite Enclosure Structure, in the layer of original place, the soil body is cut by special special superpower power, super large moment of torsion mixing pile machine rig, from chisel edge, cement paste hardening agent high pressure is injected the soil body simultaneously, carry out abundant strong stirring with the chopping soil body, between each construction cell, then take overlapping lapping construction to form the very high continuous sealing body of wall in cement-soil post vertical underground of water-resisting property; Shaped steel (conventional H steel, shaped steel or other material of putting more energy into) is inserted as its stress supporting material before cement grout not yet hardens, tie completely firmly to cement, just form the construction method of that there is some strength and rigidity together, continuous whole underground sealing retaining wall body.
Although said method simple structure, sealing performance is good, and the duration is short, and cost is low, and environment pollution is little, is particularly suitable for the deep-foundation pit engineering in city.But it will pull out the shaped steel inserted after hardening of cement, there is difficulty, larger on the recovery impact of shaped steel.
Summary of the invention
In order to overcome the defect that existing foundation pit enclosure structure Shaped Steel can not be recycled, the invention provides one and shaped steel can not only be pulled out recycling easily, and it is simple to have structure, cost is low, the foundation pit enclosure structure of the advantage that constructability is installed and construction method thereof.
The technical solution used in the present invention is:
Foundation pit enclosure structure, it is characterized in that: comprise the boring in advance preset according to desired location, be provided with the cement mixing pile for improving foundation strength in described boring, the inner side of described cement mixing pile is arranged at intervals with the shaped steel for improving space enclosing structure rigidity in the soil body of cement mixing pile and along the width of cement mixing pile; Be interconnected with reinforcing bar between described shaped steel.
Described shaped steel is H steel.
A construction method for foundation pit enclosure structure as described above, is characterized in that: described construction method comprises the steps:
(31), utilize mixing pile machine to complete boring, from chisel edge, cement paste hardening agent high pressure is injected the soil body simultaneously, cement paste hardening agent carries out abundant strong stirring with the chopping soil body, forms cement mixing pile, ties firmly completely to cement;
(32), multiple shaped steel is squeezed in the soil body on cement mixing pile side according to the spacing of setting respectively, shaped steel keeps off the function of native bending resistance and the dash water stopping function compound of agitation pile, improves the rigidity of cement mixing pile, increases the stability of whole bracing of foundation pit;
(33), by multiple shaped steel bar connecting together, integral rigidity is improved;
(34), shaped steel squeezes in the soil body, after completion, can be dug out by shaped steel easily from soil, recycling.
In the present invention, described cement mixing pile utilizes cement as the host of curing compound, is a kind of effective form for the treatment of of soft foundation, utilizes mixing pile machine cement jet to be entered the soil body and fully stir, make cement, with soil, series of physical chemical reaction occur, make weak soil harden and improve foundation strength.Described shaped steel, its position of putting is different from traditional, and it is mainly in order to ensure the rigidity of stake, is convenient to extract shaped steel recycling, improves the resistance to overturning of stake, has and well go along with sb. to guard him effect.
The present invention, by shaped steel is placed in the soil on cement mixing pile side, improves the rigidity gone along with sb. to guard him, and can more easily shaped steel be taken out, recycling, has good to go along with sb. to guard him effect.
Beneficial effect of the present invention is embodied in:
1, by shaped steel is placed in the soil on cement mixing pile side, improve the rigidity gone along with sb. to guard him, better shaped steel is taken out recycling, there is the advantage being convenient to processing and construction and installation;
2, shaped steel can not only be pulled out easily, recycling, and it is simple to have structure, cost is low, the advantage that constructability is installed.
Accompanying drawing explanation
Fig. 1 is overall structure top view of the present invention.
Fig. 2 is the sectional view of I-I in Fig. 1.
Detailed description of the invention
See figures.1.and.2, foundation pit enclosure structure, comprise the boring in advance preset according to desired location, be provided with the cement mixing pile 3 for improving foundation strength in described boring, the inner side of described cement mixing pile 3 is arranged at intervals with the shaped steel 2 for improving space enclosing structure rigidity in the soil body 1 of cement mixing pile and along the width of cement mixing pile; Be interconnected with reinforcing bar 4 between described shaped steel 2.
Described shaped steel 2 is H steel.
A construction method for foundation pit enclosure structure as described above, described construction method comprises the steps:
(31), utilize mixing pile machine to complete boring, from chisel edge, cement paste hardening agent high pressure is injected the soil body simultaneously, cement paste hardening agent carries out abundant strong stirring with the chopping soil body, forms cement mixing pile, ties firmly completely to cement;
(32), multiple shaped steel is squeezed in the soil body on cement mixing pile side according to the spacing of setting respectively, shaped steel keeps off the function of native bending resistance and the dash water stopping function compound of agitation pile, improves the rigidity of cement mixing pile, increases the stability of whole bracing of foundation pit;
(33), by multiple shaped steel bar connecting together, integral rigidity is improved;
(34), shaped steel squeezes in the soil body, after completion, can be dug out by shaped steel easily from soil, recycling.
In the present invention, described cement mixing pile utilizes cement as the host of curing compound, is a kind of effective form for the treatment of of soft foundation, utilizes mixing pile machine cement jet to be entered the soil body and fully stir, make cement, with soil, series of physical chemical reaction occur, make weak soil harden and improve foundation strength.Described shaped steel, its position of putting is different from traditional, and it is mainly in order to ensure the rigidity of stake, is convenient to extract shaped steel recycling, improves the resistance to overturning of stake, has and well go along with sb. to guard him effect.
Content described in this manual embodiment is only enumerating the way of realization of inventive concept; protection scope of the present invention should not be regarded as being only limitted to the concrete form that embodiment is stated, protection scope of the present invention also and conceive the equivalent technologies means that can expect according to the present invention in those skilled in the art.

Claims (3)

1. a foundation pit enclosure structure, it is characterized in that: comprise the boring in advance preset according to desired location, be provided with the cement mixing pile for improving foundation strength in described boring, the inner side of described cement mixing pile is arranged at intervals with the shaped steel for improving space enclosing structure rigidity in the soil body of cement mixing pile and along the width of cement mixing pile; Be interconnected with reinforcing bar between described shaped steel.
2. a kind of foundation pit enclosure structure as claimed in claim 1, is characterized in that: described shaped steel is H steel.
3. a construction method for foundation pit enclosure structure as claimed in claim 2, is characterized in that: described construction method comprises the steps:
(31), utilize mixing pile machine to complete boring, from chisel edge, cement paste hardening agent high pressure is injected the soil body simultaneously, cement paste hardening agent carries out abundant strong stirring with the chopping soil body, forms cement mixing pile, ties firmly completely to cement;
(32), multiple shaped steel is squeezed in the soil body on cement mixing pile side according to the spacing of setting respectively, shaped steel keeps off the function of native bending resistance and the dash water stopping function compound of agitation pile, improves the rigidity of cement mixing pile, increases the stability of whole bracing of foundation pit;
(33), by multiple shaped steel bar connecting together, integral rigidity is improved;
(34), shaped steel squeezes in the soil body, after completion, can be dug out by shaped steel easily from soil, recycling.
CN201510873293.9A 2015-12-02 2015-12-02 Foundation pit supporting structure and construction method thereof Pending CN105507330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510873293.9A CN105507330A (en) 2015-12-02 2015-12-02 Foundation pit supporting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510873293.9A CN105507330A (en) 2015-12-02 2015-12-02 Foundation pit supporting structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN105507330A true CN105507330A (en) 2016-04-20

Family

ID=55715607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510873293.9A Pending CN105507330A (en) 2015-12-02 2015-12-02 Foundation pit supporting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN105507330A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049458A (en) * 2016-05-31 2016-10-26 余巍 Underground diaphragm wall structure and construction method thereof
CN106120807A (en) * 2016-07-27 2016-11-16 东通岩土科技(杭州)有限公司 Permanent foundation pit enclosure soil cement rigid wall and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100866162B1 (en) * 2008-08-14 2008-10-30 이재호 Chair-type self-supported earth retaining wall constructing method
CN102518135A (en) * 2011-12-29 2012-06-27 标力建设集团有限公司 Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN102912798A (en) * 2012-11-06 2013-02-06 山东兴华建设集团有限公司 Compound soil nail wall foundation pit supporting method
CN103074898A (en) * 2013-01-18 2013-05-01 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100866162B1 (en) * 2008-08-14 2008-10-30 이재호 Chair-type self-supported earth retaining wall constructing method
CN102518135A (en) * 2011-12-29 2012-06-27 标力建设集团有限公司 Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN102912798A (en) * 2012-11-06 2013-02-06 山东兴华建设集团有限公司 Compound soil nail wall foundation pit supporting method
CN103074898A (en) * 2013-01-18 2013-05-01 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶献忠: ""H型钢桩和水泥搅拌桩复合支护技术施工探讨"", 《中国科技信息》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049458A (en) * 2016-05-31 2016-10-26 余巍 Underground diaphragm wall structure and construction method thereof
CN106120807A (en) * 2016-07-27 2016-11-16 东通岩土科技(杭州)有限公司 Permanent foundation pit enclosure soil cement rigid wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN105507330A (en) Foundation pit supporting structure and construction method thereof
CN102650212B (en) Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel
CN102011405A (en) Deepwater cofferdam slot sinking construction method
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN101666085B (en) Prefabricated part composite cement soil wall and construction method thereof
CN202689009U (en) Steel sheet pile and tubular pile combined foundation pit supporting structure
CN102220764B (en) Construction method of deep foundation pit bracing system
CN202323958U (en) Deep-water foundation pit support and water-stop self-locking supporting pile structure
CN102926382B (en) A kind of construction method of SMW engineering method
CN201687480U (en) Vertical shaft penetrating thick soft soil layer integral butting steel protecting tube
CN101725147B (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN203487542U (en) Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls
CN203334288U (en) Novel vertical foundation pit space enclosing structure
CN105821887B (en) A kind of stand column pile installation method constructed in boulder bed
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN105421467A (en) Foundation pit support structure and construction method thereof
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN203924072U (en) The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large
CN204040042U (en) A kind of super large ultra-deep support with manually dug piles structure
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN107023017A (en) UH goes along with sb. to guard him water sealing structure and its construction method
CN207348320U (en) A kind of construction concrete cover cushion block
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
CN102776881B (en) Recyclable post-tensioned prestressing anchor cable pile and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160420