CN103680288B - A kind of tunnel micro-benching tunnelling method technique teaching simulation body - Google Patents

A kind of tunnel micro-benching tunnelling method technique teaching simulation body Download PDF

Info

Publication number
CN103680288B
CN103680288B CN201310537225.6A CN201310537225A CN103680288B CN 103680288 B CN103680288 B CN 103680288B CN 201310537225 A CN201310537225 A CN 201310537225A CN 103680288 B CN103680288 B CN 103680288B
Authority
CN
China
Prior art keywords
section
tunnel
handcraft
micro
show
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310537225.6A
Other languages
Chinese (zh)
Other versions
CN103680288A (en
Inventor
梁斌
刘吉福
郭程方
谭敏
熊辉
冯春盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHA PENGYANG TEACHING EQUIPMENT CO., LTD.
Original Assignee
Liuzhou Railway Vocational Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Railway Vocational Technical College filed Critical Liuzhou Railway Vocational Technical College
Priority to CN201310537225.6A priority Critical patent/CN103680288B/en
Publication of CN103680288A publication Critical patent/CN103680288A/en
Application granted granted Critical
Publication of CN103680288B publication Critical patent/CN103680288B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of tunnel micro-benching tunnelling method technique teaching simulation body, comprise on it and open cunicular emulation body and the formal railway line be arranged in emulation body tunnel, 4 handcraft show sections of showing the micro-benching tunnelling method technological process of railway tunnel are provided with in described emulation body tunnel, formal tunnel cross-section shows that section (15) and tunnel portal show section (16), 4 handcraft show Duan Zhong 1 handcraft show sections are excavation section (11), 2nd handcraft show section is preliminary bracing section (12), 3rd handcraft show section is arch wall and splash guard, framework of steel reinforcement, template segment (13), 4th handcraft show section is that formwork erection completes, cast wall body, vault concrete and vault slip casting section (14).Adopt the present invention can the round-the-clock teaching carrying out railway tunnel in indoor, both ensure that the authenticity of teaching, and ensured carrying out smoothly of teaching again, there is high economy simultaneously.

Description

A kind of tunnel micro-benching tunnelling method technique teaching simulation body
Technical field
The present invention relates to a kind of teaching emulation body, the particularly micro-benching tunnelling method technique in a kind of tunnel teaching simulation body.
Background technology
Due to the singularity in tunnel, at present, the practical teaching of railway tunnel is generally by realizing to site visit.But to many restrictions such as the condition that site visit is subject to visit arrangement on opportunity, scene accepts visit, safety management and traffic, the time and efforts often wanting expensive of once imparting knowledge to students is being prepared and tissue.Not only increase the workload of organizing preparation, improve instruction cost, and owing to being field teaching, also can be subject to the impact of the factors such as weather.In addition, carry out teaching to tunnel construction site, also there is certain potential safety hazard and management difficulty.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of can the round-the-clock teaching carrying out railway tunnel in indoor, both ensure that the authenticity of teaching, ensure carrying out smoothly of teaching again, there is tunnel micro-benching tunnelling method technique teaching simulation body of high economy simultaneously, to solve above-mentioned problems of the prior art.
The technical scheme solved the problems of the technologies described above is: a kind of tunnel micro-benching tunnelling method technique teaching simulation body, comprise on it and open cunicular emulation body and the formal railway line be arranged in emulation body tunnel, in described emulation body tunnel, be provided with the handcraft show section of showing the micro-benching tunnelling method technological process of railway tunnel.
Described handcraft show section comprises 4 handcraft show sections, 4 handcraft show Duan Zhong 1 handcraft show sections are excavation section, 2nd handcraft show section is preliminary bracing section, 3rd handcraft show section is arch wall and splash guard, framework of steel reinforcement, template segment, 4th handcraft show section is that formwork erection completes, cast wall body, vault concrete and vault slip casting section, also be provided with formal tunnel cross-section in described emulation body tunnel and show that section and tunnel portal show section, after formal tunnel cross-section shows that section is arranged on the 4th handcraft show section, after tunnel portal shows that section is arranged on formal tunnel cross-section displaying section, in described emulation body tunnel, excavation section is provided with face and micro-step, described micro-step extends in the 2nd handcraft show section, namely micro-step is positioned in the 1st handcraft show section and the 2nd handcraft show section.
The length that described formal railway line extends in emulation body tunnel is no less than 10m.
The rail of described formal railway line and sleeper adopt organic glass or PVC material to make.
Tunnel micro-benching tunnelling method technique teaching simulation body of the present invention, it is a kind of new solution proposed for current constructing tunnel teaching presence deficiency, choose most typical construction method in constructing tunnel---micro-benching tunnelling method, makes outer section by the main flow of its technique and shows.The present invention has following beneficial effect:
1, adopt the present invention to carry out tunnel teaching to carry out in indoor, namely ensure that the authenticity of teaching, avoid again the high cost and the site visit expense that apply true tunnel, decrease organizing preparation's work of site visit simultaneously, not only reduce workload, and effectively reduce instruction cost, there is high economy.
2, owing to can impart knowledge to students in indoor, avoid the drawback of the cause influence field teachings such as weather, carrying out smoothly of teaching can be ensured.
3, eliminate the potential safety hazard needing site visit teaching presence, effectively guarantee the safety of teaching.
Below, in conjunction with the accompanying drawings and embodiments the technical characteristic of a kind of tunnel micro-benching tunnelling method technique teaching simulation body of the present invention is further described.
Accompanying drawing explanation
Fig. 1: a kind of tunnel micro-benching tunnelling method technique teaching simulation body front elevation of the present invention.
The A portion enlarged drawing of Fig. 2: Fig. 1.
Fig. 3: a kind of tunnel micro-benching tunnelling method technique teaching simulation body segmentation exploded view of the present invention.
In figure: 1-emulates body, 11-excavation section, 12-preliminary bracing section, 13-arch wall and splash guard, framework of steel reinforcement, template segment, 14-formwork erection completes, pour into a mould wall body, vault concrete and vault slip casting section, the formal tunnel cross-section of 15-shows section, and 16-tunnel portal shows section, 17-face and micro-step, the formal railway line of 2-, 21-rail, 22-sleeper, 3-tunnel.
Embodiment
Embodiment 1: a kind of tunnel micro-benching tunnelling method technique teaching simulation body, as shown in Figure 1-Figure 3, comprise on it and open cunicular emulation body 1 and the formal railway line 2 of two-wire be arranged in emulation body tunnel, the handcraft show section (namely showing the main technique of each technological process according to the segmentation of railway tunnel micro-benching tunnelling method) of showing the technological process of railway tunnel micro-benching tunnelling method is provided with in described emulation body tunnel, described handcraft show section comprises 4 handcraft show sections, in 4 handcraft show sections, one section, forefront i.e. the 1st handcraft show section is excavation section 11, be provided with excavation face and micro-step, the original soil layer in face excavation simulation face and advanced conduit, anchor pole, steel tube shed etc., 2nd handcraft show section is preliminary bracing section 12, comprises the supporting of reinforcing bar grid bow member, the supporting of joist steel bow member, bolt supporting, conduit and combined bolting and shotcrete etc., 3rd handcraft show section is arch wall and splash guard, framework of steel reinforcement, template segment 13, 4th handcraft show section is that formwork erection completes, cast wall body, vault concrete and vault slip casting section 14, also be provided with formal tunnel cross-section in described emulation body tunnel and show that section (comprises two linings, ditch, cable duct, contact net and refuge chamber etc.) and tunnel portal displaying section, after formal tunnel cross-section shows that section 15 is arranged on the 4th handcraft show section, after tunnel portal shows that section 16 is arranged on formal tunnel cross-section displaying section, described micro-step 17 extends in the 2nd handcraft show section, namely micro-step is positioned in the 1st handcraft show section and the 2nd handcraft show section.The length that described formal railway line 2 extends in emulation body tunnel is no less than 10m.
Soil section, concrete adopt the form of light material simulation, and internal structure material adopts authentic material to make.The reconstruct such as the rail 21 of described formal railway line and sleeper 22 part adopts organic glass or high-strength PVC material to make, and button accessory then adopts authentic rail material, strengthens the authenticity of real training.
One as the present embodiment converts, and as place allows, then tunnel can be done as far as possible long, show more multiple process routes, be more beneficial to teaching; As certain limited due to place, can do shorter by tunnel, technological process is compacter.
As another conversion of the present embodiment, the length that described formal railway line extends in emulation body tunnel can increase according to actual conditions or reduce.

Claims (3)

1. tunnel micro-benching tunnelling method technique teaching simulation body, it is characterized in that: comprise the formal railway line (2) it opened cunicular emulation body (1) and be arranged in emulation body tunnel, in described emulation body tunnel, be provided with the handcraft show section of showing the micro-benching tunnelling method technological process of railway tunnel, described handcraft show section comprises 4 handcraft show sections, 4 handcraft show Duan Zhong 1 handcraft show sections are excavation section (11), 2nd handcraft show section is preliminary bracing section (12), 3rd handcraft show section is arch wall and splash guard, framework of steel reinforcement, template segment (13), 4th handcraft show section is that formwork erection completes, cast wall body, vault concrete and vault slip casting section (14), also be provided with formal tunnel cross-section in described emulation body tunnel and show that section (15) and tunnel portal show section (16), after formal tunnel cross-section shows that section (15) is arranged on the 4th handcraft show section, after tunnel portal shows that section (16) is arranged on formal tunnel cross-section displaying section, in described emulation body tunnel, excavation section (11) is provided with face and micro-step (17), described micro-step extends in the 2nd handcraft show section, namely micro-step is positioned in the 1st handcraft show section and the 2nd handcraft show section.
2. a kind of tunnel according to claim 1 micro-benching tunnelling method technique teaching simulation body, is characterized in that: the length that described formal railway line (2) extends in emulation body tunnel is no less than 10m.
3. a kind of tunnel according to claim 2 micro-benching tunnelling method technique teaching simulation body, is characterized in that: the rail (21) of described formal railway line and sleeper (22) adopt organic glass or PVC material to make.
CN201310537225.6A 2013-06-09 2013-11-04 A kind of tunnel micro-benching tunnelling method technique teaching simulation body Active CN103680288B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310537225.6A CN103680288B (en) 2013-06-09 2013-11-04 A kind of tunnel micro-benching tunnelling method technique teaching simulation body

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201320332742.5 2013-06-09
CN201320332742 2013-06-09
CN2013203327425 2013-06-09
CN201310537225.6A CN103680288B (en) 2013-06-09 2013-11-04 A kind of tunnel micro-benching tunnelling method technique teaching simulation body

Publications (2)

Publication Number Publication Date
CN103680288A CN103680288A (en) 2014-03-26
CN103680288B true CN103680288B (en) 2015-08-05

Family

ID=50317690

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201320688651.5U Withdrawn - After Issue CN203689815U (en) 2013-06-09 2013-11-04 Teaching simulation body for tunnel micro-step method technology
CN201310537225.6A Active CN103680288B (en) 2013-06-09 2013-11-04 A kind of tunnel micro-benching tunnelling method technique teaching simulation body

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201320688651.5U Withdrawn - After Issue CN203689815U (en) 2013-06-09 2013-11-04 Teaching simulation body for tunnel micro-step method technology

Country Status (1)

Country Link
CN (2) CN203689815U (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203689815U (en) * 2013-06-09 2014-07-02 柳州铁道职业技术学院 Teaching simulation body for tunnel micro-step method technology
CN106023778A (en) * 2016-06-13 2016-10-12 江苏建筑职业技术学院 Earth and rock engineering dangerous source identification and experience area and construction method for the same
CN107991081A (en) * 2017-12-07 2018-05-04 山东大学 Benching tunnelling method construction tunnel country rock and supporting construction mechanical characteristic experimental system and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3642423B2 (en) * 2001-12-11 2005-04-27 財団法人鉄道総合技術研究所 Model experiment method of tunnel pressure wave
CN102235942A (en) * 2010-04-27 2011-11-09 同济大学 Multifunctional model test system for tunnel and underground engineering
CN102507347A (en) * 2011-10-19 2012-06-20 宁波交通工程建设集团有限公司 Load-carrying capacity test device of tunnel secondary-lining concrete structure
CN102568292A (en) * 2011-12-29 2012-07-11 上海市机械施工有限公司 Indoor practical training system for shield tunnel construction measurement technology
CN102562075A (en) * 2012-03-09 2012-07-11 中交第二公路工程局有限公司 Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN102606162A (en) * 2012-02-08 2012-07-25 中铁四局集团第二工程有限公司 Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN202677708U (en) * 2012-05-19 2013-01-16 湖南高铁时代数字化科技有限公司 Simulation teaching sand table for subway station operation control system
CN203689815U (en) * 2013-06-09 2014-07-02 柳州铁道职业技术学院 Teaching simulation body for tunnel micro-step method technology

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3642423B2 (en) * 2001-12-11 2005-04-27 財団法人鉄道総合技術研究所 Model experiment method of tunnel pressure wave
CN102235942A (en) * 2010-04-27 2011-11-09 同济大学 Multifunctional model test system for tunnel and underground engineering
CN102507347A (en) * 2011-10-19 2012-06-20 宁波交通工程建设集团有限公司 Load-carrying capacity test device of tunnel secondary-lining concrete structure
CN102568292A (en) * 2011-12-29 2012-07-11 上海市机械施工有限公司 Indoor practical training system for shield tunnel construction measurement technology
CN102606162A (en) * 2012-02-08 2012-07-25 中铁四局集团第二工程有限公司 Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN102562075A (en) * 2012-03-09 2012-07-11 中交第二公路工程局有限公司 Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN202677708U (en) * 2012-05-19 2013-01-16 湖南高铁时代数字化科技有限公司 Simulation teaching sand table for subway station operation control system
CN203689815U (en) * 2013-06-09 2014-07-02 柳州铁道职业技术学院 Teaching simulation body for tunnel micro-step method technology

Also Published As

Publication number Publication date
CN103680288A (en) 2014-03-26
CN203689815U (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN104612713B (en) Construction method of tunnel in ultra-shallow buried section
CN101769154A (en) Excavation supporting method for tunnel construction
CN206942764U (en) The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole
CN203603930U (en) Device for preventing tunnel secondary lining vault from disengaging
CN201560780U (en) Ultra-small clear distance tunnel rock pillar pre-stress opposite-pull anchor rod structure
CN105041349A (en) Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN103953366B (en) Mid-board top former lining cutting cavity backfill construction method when single hole tunnel changes arcading into
CN102383806A (en) Construction technology for allowing tunnel to pass through ultra-large karst cave
CN105781595B (en) A kind of rectangle or class rectangle cross-section underground engineering machinery branch tunneling method of construction
CN208073481U (en) Mountainous City Underground Subway Station vented construction
CN103680288B (en) A kind of tunnel micro-benching tunnelling method technique teaching simulation body
CN103362513A (en) Transformation and construction method for existing cavity in underground excavation region
CN208518680U (en) A kind of spray concrete plug structure for vcehicular tunnel corrugated steel preliminary bracing
CN103578346B (en) A kind of simply supported girder bridge teaching simulation structure
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN206816278U (en) Novel recoverable supporting steel arch frame for excavating transverse channel
CN109083660A (en) Soft Rock Roadway (tunnel) road pucking based on armored concrete bottom beam administers supporting construction and method
CN108166395A (en) A kind of construction method that beam bridge is built across Business Line
CN204282378U (en) A kind of prefabricated box prestressed slip-resisting pile
CN206607705U (en) Assembly concrete shear wall structure
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN205445125U (en) Execute i -shaped assembled enclosure fast
CN212642195U (en) Foundation ditch canopy that prevents dust
CN209100054U (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
CN108035380A (en) A kind of suspension and support fastener inserts and its pre-buried construction method of installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190709

Address after: 410000 Building 102, A2A3, Jiahai Industrial Park, 1318 Qingqing Road, Kaifu District, Changsha City, Hunan Province

Patentee after: CHANGSHA PENGYANG TEACHING EQUIPMENT CO., LTD.

Address before: 545007 139 Heping Road, Liuzhou, the Guangxi Zhuang Autonomous Region

Patentee before: Liuzhou Railway Vocational Technical College