CN206942764U - The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole - Google Patents

The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole Download PDF

Info

Publication number
CN206942764U
CN206942764U CN201720651757.6U CN201720651757U CN206942764U CN 206942764 U CN206942764 U CN 206942764U CN 201720651757 U CN201720651757 U CN 201720651757U CN 206942764 U CN206942764 U CN 206942764U
Authority
CN
China
Prior art keywords
bottom plate
hole
shield machine
supplementary structure
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720651757.6U
Other languages
Chinese (zh)
Inventor
赵晓勇
王飞
罗勇
王煦霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201720651757.6U priority Critical patent/CN206942764U/en
Application granted granted Critical
Publication of CN206942764U publication Critical patent/CN206942764U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

It the utility model is related to the supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole.Shield machine or TBM development machines need to be in tunnels(Hole)Assembled or disassembled in hole and transported, to ensure that equipment quickly, smoothly passes through in optimum stratum.Supplementary structure of the present utility model is flat stalk gateway opening type structure, includes bottom plate, the straight flange wall of bottom plate both sides and the arch camber of top;Described straight flange wall and the junction of arch camber set Reinforced Concrete Corbels, and Reinforced Concrete Corbels upper surface is provided with pre-buried bridge crane rail out of shape;Described bottom plate is arranged to flat, is provided with device bottom bearing on bottom plate, device bottom bearing is that steel bracket or concrete arc-shaped bottom surface backfill.The utility model compound with regular structure, reasonable stress, the self-bearing ability of country rock is given full play to, the assembling of equipment is completed in the limited cavern in space and is disassembled, has not only saved construction investment, and reduce construction risk and difficulty of construction.

Description

The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole
Technical field
It the utility model is related to tunnels and underground engineering construction technique field, and in particular to assembly and disassembly shield in a kind of hole The supplementary structure of structure machine or TBM development machines.
Background technology
With tunnel(Hole)Build the continuous improvement of technology, its construction level and construction requirements, it is increasing new technology, new Engineering method is applied.In the underground engineering constructions such as Long Traffic Tunnels, diversion tunnel, shield or TBM development machines have with it Quickly, the advantages that safe, civilized construction, gradually it is used widely.Set in view of geological adaptability, constructing tunnel tissue The factors such as meter, construction period, shield machine or TBM development machines need in tunnel in some cases(Hole)Barrel section assembled or Disassemble and transport, with ensure equipment in optimum stratum it is quick, smoothly by playing the advantage of mechanical execution, being advantageous to The construction of Tunnel Engineering, efficiency is improved, reduce difficulty of construction, shorten total lever factor.
The content of the invention
The purpose of this utility model is to provide the supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole, When can make in Tunnel using shield machine or TBM tunneler constructions, smoothly installation originates equipment, or receive disassemble after transport out Hole.
Technical scheme is used by the utility model:
The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole, it is characterised in that:
Described supplementary structure is flat stalk gateway opening type structure, includes bottom plate, the straight flange wall of bottom plate both sides and straight Arch camber above abutment wall;
Described straight flange wall and the junction of arch camber set Reinforced Concrete Corbels, and Reinforced Concrete Corbels upper surface is set There is pre-buried bridge crane rail out of shape;
It is arranged to flat at described bottom plate, device bottom bearing is provided with bottom plate, device bottom bearing is steel construction Bracket or the backfill of concrete arc-shaped bottom surface.
Described supplementary structure longitudinal length is 20~35m.
The overall structure tunneling boring that described bottom plate, straight flange wall, bracket and arch camber is formed uses composite lining form, For outer layer to set the preliminary bracing of bar-mat reinforcement, internal layer is the secondary form concrete lining cutting of reinforced concrete structure.
Described preliminary bracing thickness is 22cm ~ 30cm, sets anchor pole hole week, at bracket preliminary bracing nearby locally set Long anchor pole.
Described secondary lining thickness is 50cm ~ 100cm.
The utility model has advantages below:
1st, the utility model is used for shield machine or TBM development machines are assembled and disassembled in Tunnel, and auxiliary is completed driving and applied Work, construction paragraph is more flexible, enriches the engineering proposal that major long tunnel uses mechanical execution, is advantageous to the system engineering in tunnel Prepare.
2nd, the structure, which has, does not expand arch section, and arch section span has reduced, and structure is continuous, stress more adduction Reason, reduces construction risk.
3rd, after this cavern's infrastructure product shaping, permanent underground tunnel structure can be used as, because section is big compared with main tunnel, is made It can meet that realization of correlation function such as driving and maintenance etc. requires in hole with period.It is in traffic tunnel, hydraulic tunnel, integrated pipe There is larger application prospect in the fields such as corridor.
Brief description of the drawings
Fig. 1 is the utility model structure section figure.
Fig. 2 is the utility model structure bracket and bridge crane rail detail drawing.
In figure, 1- anchor poles, the long anchor poles of 2-, 3- arch wall preliminary bracings(Gunite concrete and bar-mat reinforcement), the secondary lining of 4- bottom plates Build form concrete, 5- straight flange wall secondary lining form concretes, 6- arch camber secondary lining form concretes, 7- armored concrete Bracket, the pre-buried bridge cranes of 8- rail out of shape, 9- device bottom bearings(Steel bracket or concrete arc-shaped backfill), 10- shield machines Or TBM driving machine equipment outlines.
For a- equipment outline apart from the safe distance of abutment wall, d- shield machines or TBM tunnel machine equipment outline diameter.
Embodiment
The utility model is described in detail with reference to embodiment.
The width of shield or TBM development machine assembly and disassembly cavern should be on the basis of the diameter of equipment, and both sides are reserved artificial Working space;Cavern's height should meet the requirement such as device diameters, bridge crane unit type, manual work space, safe distance;Cavern The combined factors such as supporting behind temporary storage space, part during length is considered as main frame length, equipment originates requirement, main frame assembles It is determined that;Because this cavern is big typically than tunnel normal section, while to consider bridge crane hoisting weight requirement, geology should be arranged on The preferable location of condition, structure should be strengthened during features as poor geologic condition.
The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole described in the utility model, longitudinal direction are long Spend for 20~35m, section excavation width is between 7~16m, section excavation height between 12~20m, design parameter can basis The Machine structural features of used shield machine or TBM development machine, related lifting, detaching equipment size, form of construction work and surrounding enviroment bar Part etc. is comprehensive to be determined, can use New Austrian Tunneling Method(Drilling and blasting method)Construction, features as poor geologic condition, section width are arranged when big using auxiliary method Apply, composite lining structure, designed by permanent structure.
The supplementary structure is that flat stalk plays arch form structure, includes the arch camber of bottom plate, both sides straight flange wall and top.Directly The junction of abutment wall and arch camber nearby sets Reinforced Concrete Corbels 7, and the upper surface of Reinforced Concrete Corbels 7 is provided with pre-buried bridge crane Rail 8 out of shape, using 38kg/m rail or 43Kg/m rail.It is arranged to flat at bottom plate, device bottom branch is provided with bottom plate Seat 9, device bottom bearing 9 are that steel bracket or concrete arc-shaped bottom surface backfill, and height adjustment should be first carried out before use.
The overall structure tunneling boring that bottom plate, straight flange wall, bracket and arch camber are formed uses composite lining form, and outer layer is The preliminary bracing of bar-mat reinforcement is set, and internal layer is the secondary form concrete lining cutting of reinforced concrete structure.Preliminary bracing thickness is 22cm ~ 30cm, sets anchor pole 1 hole week, 2.5 ~ 3.5m of length, at bracket preliminary bracing nearby long anchor pole 2 is locally set, length 5 ~ 8m;Secondary lining thickness is 50cm ~ 100cm, can be made the appropriate adjustments according to the requirement of engineering such as geological conditions and section size, but should Meet force-bearing of surrounding rock mass and equipment lifting force request simultaneously.
Meet assembling during constructing tunnel and hang the requirement torn open, and corresponding waterproof and drain measure should be performed, it is full during use Driving and the realization of function used in connection with etc. require in sufficient hole, while should meet the life requirement of tunnel structure.
It is 1.0~2.0m that described assembly and disassembly hole span width extends out width than shield machine or TBM development machines, during assembling Take large values, get the small value during dismounting.
The utility model can meet smoothly assembly and disassembly requirement in shield or TBM driving augers, complete originating for equipment After reception, it is aided with corresponding waterproof and drain measure, forms permanent underground structure.Or carry out secondary plain concrete backfill and be Normal paragraph tunnel-shaped, to meet to use functional requirement.
Content of the present utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and any equivalent conversion taken technical solutions of the utility model, are claim institute of the present utility model Cover.

Claims (4)

  1. A kind of 1. supplementary structure of assembly and disassembly shield machine or TBM development machines in hole, it is characterised in that:
    Described supplementary structure is flat stalk gateway opening type structure, includes bottom plate, the straight flange wall and straight flange wall of bottom plate both sides The arch camber of top;
    Described straight flange wall and the junction of arch camber set Reinforced Concrete Corbels(7), Reinforced Concrete Corbels(7)Upper surface is set It is equipped with pre-buried bridge crane rail out of shape(8);
    It is arranged to flat at described bottom plate, device bottom bearing is provided with bottom plate(9), device bottom bearing(9)For steel knot Structure bracket or the backfill of concrete arc-shaped bottom surface.
  2. 2. the supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole according to claim 1, its feature It is:
    Described supplementary structure longitudinal length is 20~35m.
  3. 3. the supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole according to claim 1, its feature It is:
    The overall structure tunneling boring that described bottom plate, straight flange wall, bracket and arch camber is formed uses composite lining form, outer layer To set the preliminary bracing of bar-mat reinforcement, internal layer is the secondary form concrete lining cutting of reinforced concrete structure.
  4. 4. the supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole according to claim 3, its feature It is:
    Described preliminary bracing thickness is 22cm ~ 30cm, sets anchor pole in hole week(1), at bracket preliminary bracing nearby locally set Long anchor pole(2);
    Described secondary form concrete lining thickness is 50cm ~ 100cm.
CN201720651757.6U 2017-06-07 2017-06-07 The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole Active CN206942764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720651757.6U CN206942764U (en) 2017-06-07 2017-06-07 The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720651757.6U CN206942764U (en) 2017-06-07 2017-06-07 The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole

Publications (1)

Publication Number Publication Date
CN206942764U true CN206942764U (en) 2018-01-30

Family

ID=61363828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720651757.6U Active CN206942764U (en) 2017-06-07 2017-06-07 The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole

Country Status (1)

Country Link
CN (1) CN206942764U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547625A (en) * 2018-03-22 2018-09-18 广东水电二局股份有限公司 TBM cutterhead method for dismounting in a kind of tunnel
CN108915714A (en) * 2018-07-09 2018-11-30 中铁隧道局集团有限公司 The double TBM installation methods in one hole
CN109404004A (en) * 2018-11-30 2019-03-01 中铁隧道集团二处有限公司 Cavern and its construction method for being assembled in push pipe auger
CN109707384A (en) * 2018-12-18 2019-05-03 山西宏厦第一建设有限责任公司 A kind of construction method of coal mine shield machine dismantling chamber
CN111472797A (en) * 2020-04-16 2020-07-31 中国水利水电第十工程局有限公司 Implementation method for detaching TBM in hole
CN111810177A (en) * 2020-06-30 2020-10-23 中铁第六勘察设计院集团有限公司 Underground TBM (tunnel boring machine) disassembling method based on double-line operation
CN113605905A (en) * 2021-08-31 2021-11-05 广东华隧建设集团股份有限公司 Construction method for disassembling tunnel boring machine without damage
CN113944483A (en) * 2021-09-27 2022-01-18 成都大学 Special-shaped structure, rack structure and connection cavern vault secondary lining construction method
CN114109415A (en) * 2021-11-30 2022-03-01 新疆额尔齐斯河流域开发工程建设管理局 Construction method for disassembling tunnel of shield machine of non-expanding excavation chamber

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547625B (en) * 2018-03-22 2019-07-26 广东水电二局股份有限公司 TBM cutterhead method for dismounting in a kind of tunnel
CN108547625A (en) * 2018-03-22 2018-09-18 广东水电二局股份有限公司 TBM cutterhead method for dismounting in a kind of tunnel
CN108915714A (en) * 2018-07-09 2018-11-30 中铁隧道局集团有限公司 The double TBM installation methods in one hole
CN108915714B (en) * 2018-07-09 2020-02-14 中铁隧道局集团有限公司 One-hole double-TBM (tunnel boring machine) installing method
CN109404004B (en) * 2018-11-30 2024-02-20 中铁隧道集团二处有限公司 Cave for assembling in tunnel of pipe jacking machine and construction method of cave
CN109404004A (en) * 2018-11-30 2019-03-01 中铁隧道集团二处有限公司 Cavern and its construction method for being assembled in push pipe auger
CN109707384A (en) * 2018-12-18 2019-05-03 山西宏厦第一建设有限责任公司 A kind of construction method of coal mine shield machine dismantling chamber
CN111472797A (en) * 2020-04-16 2020-07-31 中国水利水电第十工程局有限公司 Implementation method for detaching TBM in hole
CN111472797B (en) * 2020-04-16 2021-09-28 中国水利水电第十工程局有限公司 Implementation method for detaching TBM in hole
CN111810177B (en) * 2020-06-30 2022-04-08 中铁第六勘察设计院集团有限公司 Underground TBM (tunnel boring machine) disassembling method based on double-line operation
CN111810177A (en) * 2020-06-30 2020-10-23 中铁第六勘察设计院集团有限公司 Underground TBM (tunnel boring machine) disassembling method based on double-line operation
CN113605905A (en) * 2021-08-31 2021-11-05 广东华隧建设集团股份有限公司 Construction method for disassembling tunnel boring machine without damage
CN113605905B (en) * 2021-08-31 2023-12-26 广东华隧建设集团股份有限公司 Construction method for nondestructive disassembly of shield machine in tunnel
CN113944483A (en) * 2021-09-27 2022-01-18 成都大学 Special-shaped structure, rack structure and connection cavern vault secondary lining construction method
CN114109415A (en) * 2021-11-30 2022-03-01 新疆额尔齐斯河流域开发工程建设管理局 Construction method for disassembling tunnel of shield machine of non-expanding excavation chamber

Similar Documents

Publication Publication Date Title
CN206942764U (en) The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole
CN105926669B (en) A kind of Construction Method of Metro Station
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN106930777B (en) The construction method that Bored Section of Metro main track assembled two serves as a contrast
CN108678775A (en) A kind of anti-horizontal ovalizing deflection shield tunnel ruggedized construction of pre-embedded steel slab and construction method
CN201412163Y (en) Circular tunnel lining structure for construction of open-type tunnel boring machine
CN205662947U (en) Coincide assembled underground pipe gallery system
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN107091101B (en) Superimposed joint structure of middle mine shield junction tunnel in sea area and construction method
CN102996133A (en) Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel
CN107725068A (en) A kind of assembled supporting construction and its construction method based on outside steel arch-shelf and inner side concrete slab
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN101614125A (en) V level surrounding rock tunnel job practices
CN208702421U (en) The tunnel support structure of existing pile foundation building is worn under a kind of
CN105332710A (en) Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition
CN201407053Y (en) Support and waterproof structure for metro tunnel of tunnel boring machine construction
CN208669320U (en) The anti-horizontal ovalizing deflection shield tunnel ruggedized construction of pre-embedded steel slab
CN102287207B (en) Assembling jacking method in relation to serious collapse of small-section tunnel
CN204851266U (en) Secretly dig shaft structure directly over station
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN102619521B (en) Construction method for vertical shaft bedrock section wall structure
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
WO2024027772A1 (en) Composite support structure combining bag-based backfill grouting and high-strength support frame, and construction method
CN202851008U (en) Tunnel boring machine in-tunnel dismounting device