CN203238939U - Template of preset pulling bar - Google Patents

Template of preset pulling bar Download PDF

Info

Publication number
CN203238939U
CN203238939U CN2013202562112U CN201320256211U CN203238939U CN 203238939 U CN203238939 U CN 203238939U CN 2013202562112 U CN2013202562112 U CN 2013202562112U CN 201320256211 U CN201320256211 U CN 201320256211U CN 203238939 U CN203238939 U CN 203238939U
Authority
CN
China
Prior art keywords
template
tension rib
pulling bar
bar
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202562112U
Other languages
Chinese (zh)
Inventor
刘光星
肖必建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN2013202562112U priority Critical patent/CN203238939U/en
Application granted granted Critical
Publication of CN203238939U publication Critical patent/CN203238939U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a template of a preset pulling bar. The template of the preset pulling bar comprises a template body, the pulling bar and saddle stitches, and the pulling bar is a bar piece which is composed of a hook section, a bending section and a straight bar section. The straight bar section of the pulling bar is attached to the face of the template, the number of the saddle stitches is multiple, and the saddle stitches cross the straight bar section of the pulling bar to be hammered into the template body to fix the pulling bar and the template body. The plane where the hook section of the pulling bar is placed and the face of the template body are not arranged in the same plane. According to the template of the preset pulling bar, the pulling bar is fixed on the template body in advance, after a wall body concrete structure is constructed, the template body is dismounted, and the pulling bar is reserved. The template of the preset pulling bar has the advantages of being simple in structure, convenient to operate, high in construction speed, accurate in position of the pulling bar and reliable in anchoring.

Description

A kind of template of default tension rib
Technical field
The vertical concrete structure tension rib that the utility model relates to technical field of building construction arranges technology, especially a kind of template of default tension rib.
Background technology
According to the masonry construction regulation and stipulation, concrete frame trestle and shear wall and partition wall, filled wall must arrange tension rib and socket, usually adopting diameter is the reinforcing bar of 6mm, simultaneously, job specfication also has clear and definite requirement to the layout of tension rib, the template that is provided with of prior art tension rib is worn muscle method and secondary bar planting method, the former, layout requirement by tension rib, hole in the position that template is corresponding, tension rib is passed hole on the template, and make the pre-buried part of tension rib be positioned at the template inboard, reserved part is positioned at the template outside, and the pre-buried part of tension rib is anchored in the concrete structure; The latter after the walls concrete structure construction is finished, before the construction of body of wall appearance, holes at wall body structure, implants in the body of wall tension rib secondary and bonding.The problem that exists is, the former, the form removable difficulty is large, the template loss is large, and construction efficiency is low; The latter, boring, the bar planting workload is large, and floating dust is difficult for thoroughly cleaning in the hole in, causes adhesive fastness not guarantee, and anchored force does not reach designing requirement, has hidden danger of quality, and is multiplex in the old building transformation, the secondary decoration.
The utility model content
The purpose of this utility model is the template of a kind of default tension rib of providing for the deficiencies in the prior art, this template is fixed on tension rib on the template in advance, after the walls concrete structure construction is finished, stripping is namely finished the reservation of tension rib, have simple in structure, easy to operate, speed of application is fast, and the tension rib position is accurate, the reliable advantage of anchoring.
The concrete technical scheme that realizes the utility model purpose is:
A kind of template of default tension rib, its characteristics comprise template, tension rib and staple, and described tension rib is rod member, and its rod member is comprised of crotch section, bending and straight bar section; The straight bar section of described tension rib is attached on the plate face of template, and staple is several, and the straight bar section that staple strides across tension rib hammers into template tension rib and template are fixed; The not coplanar setting of plate face of the face at the crotch section place of described tension rib and template.
The utility model is fixed on tension rib on the template in advance, and after the walls concrete structure construction was finished, stripping was namely finished the reservation of tension rib, have simple in structure, easy to operate, speed of application is fast, and the tension rib position is accurate, the reliable advantage of anchoring.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the lateral view of Fig. 1.
The specific embodiment
Consult Fig. 1, Fig. 2, the utility model comprises template 1, tension rib 2 and staple 3, and described tension rib 2 is rod member, and its rod member is comprised of crotch section 21, bending 22 and straight bar section 23; The straight bar section 23 of described tension rib 2 is attached on the plate face of template 1, and staple 3 is several, and it is fixing with template 1 with tension rib 2 that the straight bar section 23 that staple 3 strides across tension rib 2 hammers into template 1; The not coplanar setting of plate face of the face at crotch section 21 places of described tension rib 2 and template 1.
The utility model is to use like this:
Take the default tension rib of walls concrete structure as example, further specify as follows,
A), prefabricated tension rib
Make tension rib by designing requirement, make bending 22 in embedded section and the boundary position of reserving section of tension rib 2, embedded section is made crotch section 21 by designing requirement, reserve section and remain straight bar section 23.
B), configuration template
According to walls concrete structure configuration template 1, by the design pitch requirement of tension rib 2, on template 1 medial surface that has prepared, eject one by one the position line of default tension rib 2.
C), assemble tension rib in template
With bending 22 positions of several tension ribs 2 line that aims the place successively, and the straight bar section 23 that makes tension rib 2 is attached on the medial surface of template 1, stride across the straight bar section 23 of tension rib 2 with several staples 3, staple 3 is hammered into template 1, make tension rib 2 relative fixing with template 1, last, adjust crotch section 21 and rotate around straight bar section 23, make the face at crotch section 21 places of tension rib 2 vertical with the plate face of template 1, implement formwork.
D), the dismounting of template
After building final set, walls concrete gets final product stripping 1, dismounting with template 1, staple 3 is extracted in template 1, the crotch section 21 of tension rib 2 is embedded in the walls concrete, and straight bar section 23 is attached to the walls concrete surface and is reserved, before masonry construction, the straight bar section 23 that tension rib 2 is reserved plucks out from the walls concrete surface, by designing requirement straight bar section 23 is inserted the masonry position, and at the straight bar section 23 terminal crotches of making, can implement masonry construction.
E), the reparation of template
Use template 1 for repeatedly having enough to meet the need, guarantee the presentation quality of pouring concrete, staple 3 holes and the damaged location of leaving on the template 1 filled with putty, and use sandpapering, stand-by.

Claims (2)

1. the template of a default tension rib is characterized in that it comprises template (1), tension rib (2) and staple (3), and described tension rib (2) is rod member, and its rod member is comprised of crotch section (21), bending (22) and straight bar section (23); The straight bar section (23) of tension rib (2) is attached on the plate face of template (1), and staple (3) is several, and it is fixing with tension rib (2) and template (1) that the straight bar section (23) that staple (3) strides across tension rib (2) hammers into template (1).
2. the template of default tension rib according to claim 1 is characterized in that the plate face of the face at crotch section (21) place of tension rib (2) and template (1) is not coplanar.
CN2013202562112U 2013-05-13 2013-05-13 Template of preset pulling bar Expired - Fee Related CN203238939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202562112U CN203238939U (en) 2013-05-13 2013-05-13 Template of preset pulling bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202562112U CN203238939U (en) 2013-05-13 2013-05-13 Template of preset pulling bar

Publications (1)

Publication Number Publication Date
CN203238939U true CN203238939U (en) 2013-10-16

Family

ID=49316249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202562112U Expired - Fee Related CN203238939U (en) 2013-05-13 2013-05-13 Template of preset pulling bar

Country Status (1)

Country Link
CN (1) CN203238939U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150103A (en) * 2015-04-10 2016-11-23 刘子刚 A kind of pre-buried technology of tie wall bar bending
CN109736543A (en) * 2019-02-25 2019-05-10 美好建筑装配科技有限公司 The prefabricated molding of overlapped shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150103A (en) * 2015-04-10 2016-11-23 刘子刚 A kind of pre-buried technology of tie wall bar bending
CN109736543A (en) * 2019-02-25 2019-05-10 美好建筑装配科技有限公司 The prefabricated molding of overlapped shear wall

Similar Documents

Publication Publication Date Title
CN103485537B (en) Super High horizontal secondary structure embedded bar construction method and structure thereof
CN102003069A (en) Construction method and pouring device for framework masonry infill wall structure
CN104264883A (en) Concrete slab reserved hole structure and construction method thereof
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN205713146U (en) A kind of quick location and installation attachment structure of PC prefabricated panel
CN105019651B (en) Hollow brick fills wall into the efficient installation engineering method of winding box
CN105569333B (en) A kind of construction formwork and construction method of overhang layer exterior wall preformed hole
CN203238939U (en) Template of preset pulling bar
CN203769274U (en) Horizontal floor tile laying positioning device
CN102352690B (en) Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube
CN204059953U (en) Hang mould prefab form
CN208337097U (en) Suit wears reinforcing bar wire box
CN108086623A (en) Bright frame wall brick system and its construction method in a kind of assembled room
CN209989959U (en) Concrete post-cast plate reinforcing steel bar reservation device
CN203429798U (en) Embedded bar structure for horizontal secondary structure of super high-rise
CN208293976U (en) Bright frame wall brick system in a kind of assembled room
CN106760297A (en) Exterior wall surface decorative device
CN103306487A (en) Multi-row beam steel bar PVC pipe reserved bar planting process
CN207419714U (en) A kind of new fixed steel tie bar embedded part steel plate structure
CN114150795A (en) Light cast-in-place high-strength formwork disassembly-free wall and construction method thereof
CN209538423U (en) Exterior wall pours heat insulation formwork
CN204645641U (en) Construction formwork is to drawing device
CN106639229A (en) Rigid board construction method
CN204139604U (en) Construction formwork is to drawing device
CN207700692U (en) A kind of floor cave entrance reservation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20180513