CN205713146U - A kind of quick location and installation attachment structure of PC prefabricated panel - Google Patents
A kind of quick location and installation attachment structure of PC prefabricated panel Download PDFInfo
- Publication number
- CN205713146U CN205713146U CN201620379144.7U CN201620379144U CN205713146U CN 205713146 U CN205713146 U CN 205713146U CN 201620379144 U CN201620379144 U CN 201620379144U CN 205713146 U CN205713146 U CN 205713146U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- prefabricated wall
- foundation
- positioning
- steel bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种PC预制墙板的快速定位安装连接结构,其包括定位板、上PC预制墙板、下PC预制墙板或基础;定位板的下半部为长方体、上半部为四棱台,整体与上PC预制墙板预留的插接孔完全匹配,其在与下PC预制墙板或基础探出的钢筋相对应的位置开有能正好容纳钢筋的孔;安装时,首先将定位板通过其上的孔对位插接在下PC预制墙板或基础的钢筋上,再将上PC预制墙板预留的插接孔对位插接在定位板上。采用本实用新型的结构,上PC预制墙板能够与下PC预制墙板或基础快速、精准地安装在一起,节省人工,只要两个人安装即可,提高生产效率,节省人工;且由于易于定位,容易调整墙面的平齐度。
The utility model discloses a fast positioning, installation and connection structure of PC prefabricated wall panels, which comprises a positioning board, an upper PC prefabricated wall board, a lower PC prefabricated wall board or a foundation; the lower half of the positioning board is a cuboid, and the upper half is a The four-sided platform, as a whole, fully matches the socket holes reserved for the upper PC prefabricated wall panel, and has a hole that can just accommodate the steel bar at the position corresponding to the steel bar protruding from the lower PC prefabricated wall panel or foundation; when installing, First, insert the positioning plate into the lower PC prefabricated wallboard or the steel bar of the foundation through the holes on it, and then insert the reserved insertion holes of the upper PC prefabricated wallboard into the positioning plate. With the structure of the utility model, the upper PC prefabricated wallboard can be quickly and accurately installed together with the lower PC prefabricated wallboard or foundation, saving labor, as long as two people install it, improving production efficiency and saving labor; and because it is easy to locate , easy to adjust the flatness of the wall.
Description
技术领域 technical field
本实用新型涉及一种PC预制墙板的快速定位安装连接结构。 The utility model relates to a fast positioning, installation and connection structure of PC prefabricated wall boards.
背景技术 Background technique
随着建筑墙体改革的快速发展,各种墙板日益增多。预制墙板通过工厂化生产,产品自身质量得到有效控制,力学性能优异,生产效率高,在建筑中被广泛应用。但在实际的施工中,由于拼接缝过多,且墙板拼缝处有许多钢筋探出,现有的拼接方法是将钢筋一一插接在预制墙板底部开有的钢筋孔内,需要多人施工,不但费时费力,生产效率低,且不容易对位;墙板拼接后需采用二次调整使墙面平齐,墙体表面平整度难于把握,施工进度缓慢,施工质量差。所以,预制墙板如何快速、高效、精准的定位安装成为了最大的难题。 With the rapid development of building wall reform, various wall panels are increasing. Prefabricated wall panels are produced in a factory, the quality of the product itself is effectively controlled, the mechanical properties are excellent, and the production efficiency is high, so it is widely used in construction. However, in actual construction, due to too many splicing joints and many steel bars protruding from the joints of the wall panels, the existing splicing method is to insert the steel bars one by one into the steel bar holes at the bottom of the prefabricated wall panels. Many people are required for construction, which is time-consuming, labor-intensive, low in production efficiency, and not easy to align. After splicing the wall panels, secondary adjustments are required to make the walls even. Therefore, how to quickly, efficiently and accurately position and install prefabricated wall panels has become the biggest problem.
发明内容 Contents of the invention
本实用新型的目的就是解决现有技术中存在的上述问题,提供一种安装快速、精准的PC预制墙板的快速定位安装连接结构。 The purpose of this utility model is to solve the above-mentioned problems existing in the prior art, and to provide a fast and accurate PC prefabricated wall board fast positioning installation connection structure.
为实现上述目的,本实用新型的技术解决方案是:一种PC预制墙板的快速定位安装连接结构,其包括定位板、上PC预制墙板、下PC预制墙板或基础;定位板的下半部为长方体、上半部为四棱台,整体与上PC预制墙板预留的插接孔完全匹配,其在与下PC预制墙板或基础探出的钢筋相对应的位置开有能正好容纳钢筋的孔;安装时,首先将定位板通过其上的孔对位插接在下PC预制墙板或基础的钢筋上,再将上PC预制墙板预留的插接孔对位插接在定位板上。 In order to achieve the above purpose, the technical solution of the present utility model is: a fast positioning, installation and connection structure of PC prefabricated wall panels, which includes a positioning board, an upper PC prefabricated wall board, a lower PC prefabricated wall board or a foundation; the lower part of the positioning board The half part is a cuboid, and the upper part is a four-sided platform. The whole is completely matched with the socket hole reserved for the upper PC prefabricated wall panel. The hole that just accommodates the steel bar; when installing, first insert the positioning plate into the lower PC prefabricated wall panel or the steel bar of the foundation through the hole on it, and then insert the reserved insertion hole of the upper PC prefabricated wall panel in position on the positioning board.
上述所述的定位板的上端面探出有多个凸起,凸起的形状优选为四棱台。使灌浆后各部件固定更牢靠。 A plurality of protrusions protrude from the upper end surface of the above-mentioned positioning plate, and the shape of the protrusions is preferably a square truss. After grouting, the components are fixed more firmly.
采用本实用新型的结构,上PC预制墙板能够与下PC预制墙板或基础快速、精准地安装在一起,节省人工,只要两个人安装即可,提高生产效率,节省人工;且由于易于定位,容易调整墙面的平齐度。 With the structure of the utility model, the upper PC prefabricated wallboard can be quickly and accurately installed with the lower PC prefabricated wallboard or the foundation, saving labor, as long as two people install it, improving production efficiency and saving labor; and because it is easy to locate , easy to adjust the flatness of the wall.
附图说明 Description of drawings
图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;
图2为本实用新型的分解结构示意图; Fig. 2 is a schematic diagram of the decomposition structure of the utility model;
图3为本实用新型中定位板的主视图; Fig. 3 is the front view of positioning plate in the utility model;
图4为本实用新型中定位板的俯视图; Fig. 4 is the top view of positioning plate in the utility model;
图5为本实用新型中定位板的右视图。 Fig. 5 is a right view of the positioning plate in the utility model.
具体实施方式 detailed description
下面结合附图和具体实施例对本实用新型做进一步的描述。 Below in conjunction with accompanying drawing and specific embodiment the utility model is described further.
如图1、图2、图3、图4和图5所示,本实施例包括定位板3、上PC预制墙板1、基础2(也可是下PC预制墙板)。定位板3的下半部为长方体、上半部为四棱台,整体与上PC预制墙板1预留的插接孔8完全匹配,其在基础2(也可是下PC预制墙板)探出的钢筋9相对应的位置开有能正好容纳钢筋的孔7。安装时,首先将定位板3通过其上的孔7对位插接在基础2(也可是下PC预制墙板)的钢筋上,再将上PC预制墙板1预留的插接孔8对位插接在定位板3上。进一步优选地,定位板的上端面探出有多个凸起6,凸起6的形状优选为四棱台,使灌浆后各部件固定更牢靠。 As shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, this embodiment includes a positioning board 3, an upper PC prefabricated wallboard 1, and a foundation 2 (it may also be a lower PC prefabricated wallboard). The lower half of the positioning board 3 is a cuboid, and the upper half is a four-sided platform. The whole is completely matched with the socket hole 8 reserved for the upper PC prefabricated wallboard 1. The corresponding position of the steel bar 9 that goes out has the hole 7 that can just accommodate the steel bar. When installing, first insert the positioning plate 3 into the steel bars of the foundation 2 (or the lower PC prefabricated wall panel) through the holes 7 on it, and then insert the 8 pairs of insertion holes reserved for the upper PC prefabricated wall panel 1. The bit is plugged on the positioning board 3. Further preferably, a plurality of protrusions 6 protrude from the upper end surface of the positioning plate, and the shape of the protrusions 6 is preferably a square truss, so that the components can be fixed more firmly after grouting.
上述实施例仅是优选的和示例性的,本领域技术人员还可以根据本专利的描述,选择使用其它等同技术,这些都由本专利的保护范围所覆盖。 The above-mentioned embodiments are only preferred and exemplary, and those skilled in the art may choose to use other equivalent technologies according to the description of this patent, and these are covered by the protection scope of this patent.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620379144.7U CN205713146U (en) | 2016-05-01 | 2016-05-01 | A kind of quick location and installation attachment structure of PC prefabricated panel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620379144.7U CN205713146U (en) | 2016-05-01 | 2016-05-01 | A kind of quick location and installation attachment structure of PC prefabricated panel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205713146U true CN205713146U (en) | 2016-11-23 |
Family
ID=57292956
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620379144.7U Expired - Fee Related CN205713146U (en) | 2016-05-01 | 2016-05-01 | A kind of quick location and installation attachment structure of PC prefabricated panel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205713146U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106759939A (en) * | 2016-12-29 | 2017-05-31 | 上海建工五建集团有限公司 | The attachment structure and method of vertical precast concrete |
| CN107654073A (en) * | 2017-10-31 | 2018-02-02 | 中建四局第六建筑工程有限公司 | One kind guiding assembled architecture wall lifting positioner and hanging method |
| CN108661329A (en) * | 2018-04-25 | 2018-10-16 | 李藏柱 | The mounting bracket of prefabricated components, precast wall body and its installation method containing the holder |
| CN112227744A (en) * | 2020-10-12 | 2021-01-15 | 衢州学院 | Assembled building hoisting positioning device and positioning method |
| CN113026562A (en) * | 2021-03-15 | 2021-06-25 | 中铁大桥局上海工程有限公司 | Rapid positioning device and method for prefabricated capping beam and prefabricated stand column |
| CN114837491A (en) * | 2022-05-20 | 2022-08-02 | 山西建投远大建筑工业股份有限公司 | Prefabricated enclosure of assembled |
-
2016
- 2016-05-01 CN CN201620379144.7U patent/CN205713146U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106759939A (en) * | 2016-12-29 | 2017-05-31 | 上海建工五建集团有限公司 | The attachment structure and method of vertical precast concrete |
| CN107654073A (en) * | 2017-10-31 | 2018-02-02 | 中建四局第六建筑工程有限公司 | One kind guiding assembled architecture wall lifting positioner and hanging method |
| CN108661329A (en) * | 2018-04-25 | 2018-10-16 | 李藏柱 | The mounting bracket of prefabricated components, precast wall body and its installation method containing the holder |
| CN112227744A (en) * | 2020-10-12 | 2021-01-15 | 衢州学院 | Assembled building hoisting positioning device and positioning method |
| CN113026562A (en) * | 2021-03-15 | 2021-06-25 | 中铁大桥局上海工程有限公司 | Rapid positioning device and method for prefabricated capping beam and prefabricated stand column |
| CN114837491A (en) * | 2022-05-20 | 2022-08-02 | 山西建投远大建筑工业股份有限公司 | Prefabricated enclosure of assembled |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205713146U (en) | A kind of quick location and installation attachment structure of PC prefabricated panel | |
| CN106481880B (en) | One kind is based on BIM and aluminum alloy mould plate correct embedment water supply and drainage casing and construction method | |
| CN105781057B (en) | A kind of skeleton recycling ceramic tile metope | |
| CN110056094B (en) | A plate plug-in edge structure, plug-in components and assembly method | |
| CN107060151A (en) | A kind of assembling type partition wall | |
| CN108824648A (en) | Space module house | |
| CN209954908U (en) | A formwork for prefabricated concrete wall panels | |
| CN207700438U (en) | A kind of fabricated shear wall cross connected structure | |
| CN204435646U (en) | A kind of ceiling structure with ruggedized construction | |
| CN206859467U (en) | A kind of assembling type partition wall | |
| CN203701341U (en) | Special-shaped keel used for partition system | |
| CN105970995A (en) | Bearing platform mold | |
| CN205116417U (en) | Box -shaped fast -assembling house | |
| CN205604629U (en) | Framework can recycle ceramic tile wall surface | |
| CN207582871U (en) | Outdoor heat-preserving decorative wall board mounting structure | |
| CN203701348U (en) | U-shaped groove body used for partition system | |
| CN217353856U (en) | A prefabricated concrete enclosure | |
| CN206971483U (en) | A kind of top fixed structure of assembled wall | |
| CN206971485U (en) | A kind of assembled wall fixture | |
| CN105256923A (en) | Light gauge steel partition wall keel fixed connector | |
| CN204983259U (en) | Screw rod centre keel is taken to modular walling body | |
| CN206070890U (en) | Partitioning slot molding external member | |
| CN209443712U (en) | A kind of integrated modular ground-heating heat-insulating layer | |
| CN113982169A (en) | Be applicable to assembled PEC roof beam and superimposed sheet electric wire pipeline structure | |
| CN204475844U (en) | A kind of platform mould holder connector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 071051 Hebei city in Baoding province where the district 54 West Road No. 329 Co-patentee after: Hebei construction group Limited by Share Ltd Patentee after: Hebei Confucian software Polytron Technologies Inc Address before: 071051 Hebei city in Baoding province where the district 54 West Road No. 329 Co-patentee before: Heibei Construction Group Co., Ltd. Patentee before: Hebei Confucian software Polytron Technologies Inc |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20210501 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |