CN203782942U CN201420156358.9U CN201420156358U CN203782942U CN 203782942 U CN203782942 U CN 203782942U CN 201420156358 U CN201420156358 U CN 201420156358U CN 203782942 U CN203782942 U CN 203782942U
Authority
CN
China
Prior art keywords
section bar
keel
curtain wall
metal decking
mounting system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420156358.9U
Other languages
Chinese (zh)
Inventor
盛建华
夏宏雁
朱应斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Original Assignee
WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd filed Critical WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Priority to CN201420156358.9U priority Critical patent/CN203782942U/en
Application granted granted Critical
Publication of CN203782942U publication Critical patent/CN203782942U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a mounting system used for a multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall. The curtain wall mounting system includes a curtain wall face board and a lateral bracing keel. The curtain wall mounting system is characterized in that the lateral bracing keel has a round pipe structure; the bracing keel is provided with a keel mounting component; each metal face board is connected with the lateral bracing keel through at least two multi-dimensional-adjusting components; each multi-dimensional-adjusting component is composed of a socket-type section pedestal, an L-shaped socket section and a socket groove; each socket-type section pedestal is fixed on the lateral bracing keel; each L-shaped socket section and each socket groove are arranged on the upper part of the inner side of a lower one of two adjacent metal face boards and in the lower part of the inner side of the higher one of the two adjacent metal face boards respectively; a lateral inserting board of each L-shaped socket section is connected with the socket-type section pedestal through an adjusting bolt and the upper end of the L-shaped socket section is inserted in the corresponding socket groove. The curtain wall mounting system is substantially reduced in processing difficulty and cost. Design, processing and assembling difficulties and costs are reduced in the maximum degree. The mounting system is good in economic value and application value.

Description

Multidimensional regulates hyperboloid titanium plate curtain wall mounting system
Technical field
The utility model relates to building curtain wall field, and especially a kind of multidimensional regulates hyperboloid titanium plate curtain wall mounting system
Background technology
Along with scientific and technological development, digitizing technique utilization under construction, appearance of new material etc., the problem that non-linear, warp surface etc. is much difficult to calculate and analyze is all solved, space also needn't be subject to the constraint of body, make architect can indiscriminately ad. as one wishes design any type of shape and space, the stimulation of Tourism Economy simultaneously and the pursuit to urban landmark building, also played the effect of adding fuel to the flames to growing prosperity of irregular building.And in various irregular buildings, the particularly architect's favor of three-dimensional irregular curved surface curtain wall, but can increase undoubtedly much according to its cost of the irregular curved surface curtain wall of the three-dimensional of existing routine implementation method, the waste of material, the increase of difficulty of construction causes the continuous increase of cost of labor, and the problem such as duration delay.Particularly for some high-grade materials as titanium plate, it is more difficult that itself makes curved slab, and also unusual height of cost, but due to titanium plate material, to compare aluminium sheet well a lot, its brightness is also higher, durable in use, a lot of high-grade buildings meeting choice for use titanium plates, as curtain wall slab, are therefore developed high, practical, the safe hyperboloid multidimensional of a set of integrated level and are regulated curtain wall system particularly important.
Summary of the invention
The utility model is according to the deficiencies in the prior art, provide a kind of multidimensional to regulate hyperboloid titanium plate curtain wall mounting system, the utility model utilizes the metal sheet characteristic of clod wash within the specific limits, adopt titanium plate to replace three dimensional panel, realizing multidimensional by aluminium alloys adaptor regulates, adopt adaptor to coordinate with horizontal keel and realize multi-angle adjusting, to realize the installation system of the irregular titanium plate surface fitting of complicated three-dimensional.
The technical solution adopted in the utility model is: described a kind of multidimensional regulates hyperboloid titanium plate curtain wall mounting system to comprise curtain wall slab and cross binding keel, described curtain wall slab is to be spliced by polylith metal decking, every metal decking inner side is provided with cross binding keel, it is characterized in that: described cross binding keel are round tubular structure, are provided with keel installation member on support keel, every metal decking is connected with cross binding keel by least two multidimensional adjustment means, multiple multidimensional adjustment means are arranged on two neighbouring metal decking junctions, and each multidimensional adjustment means is by grafting profile base, L-type grafting section bar and inserting groove composition, described grafting profile base is fixed on cross binding keel, described L-type grafting section bar is arranged on the downside metal decking inside upper part in two adjacent metal deckings, and offer adjustment hole on its horizontal plate, described inserting groove correspondence is arranged on the upside metal decking lower inside in two adjacent metal deckings, the horizontal plate of L-type grafting section bar is connected with grafting profile base by adjusting bolt, the vertical plate of L-type grafting section bar is fixed on corresponding metal decking inner side, peg graft with corresponding inserting groove in its upper end.
Further program of the utility model: described cross binding keel are curved circular tubulose keel.
The utility model is technical scheme preferably: described keel installation member is made up of circular base and fixture section bar, circular base is set on cross binding keel, and fix by screw, the tail end of fixture section bar is fixedly connected with by fastening bolt with circular base, and fixture section bar clamps by its bare terminal end and metal Roof panel.
The utility model is technical scheme preferably: described metal decking adopts titanium flat board, longitudinally be provided with many reinforcing rib section bars at the back side of metal decking, every reinforcing rib section bar is fixing by the flanging laminating of switching groove aluminium and double-sided tape and metal decking, in gap between reinforcing rib section bar and metal decking, be filled with structure glue, described L-type grafting section bar and inserting groove are bolted on respectively on the reinforcing rib section bar of corresponding metal decking.
The utility model is technical scheme preferably: be provided with junction plate in grafting profile base and L-type grafting section bar junction, the horizontal plate of L-type grafting section bar is placed in junction plate below, and be connected by adjusting bolt with junction plate, between the horizontal plate of L-type grafting section bar and junction plate, be provided with tooth pad.
The utility model is technical scheme preferably: the circular base that described grafting profile base and circular base are all made up of two and half arcuate base, two and half arcuate base are set on cross binding keel, and are bolted spacing.
The utility model is technical scheme preferably: be strip adjustment hole at adjustment hole, have one or morely, all with laterally plate is parallel for each strip adjustment hole, in each adjustment hole, is provided with adjusting bolt.
The utility model regulates location by multidimensional, the horizontal keel of panel are accurately installed, then after installation panel, utilize the metal sheet characteristic of clod wash within the specific limits, adopt the dull and stereotyped three dimensional panel that replaces, realizing multidimensional by aluminium alloys adaptor regulates, adopt adaptor to coordinate with horizontal keel and realize multi-angle adjusting, to realize the irregular titanium plate surface fitting of complicated three-dimensional.
The beneficial effects of the utility model:
1. the utility model is simple in structure, and installation substep is carried out, and has simplified on-the-spot material category and installation steps, has reduced on-the-spot erecting tools, has improved efficiency of construction, installs more conveniently, and structure is safer;
2. adaptable, can adapt to the curved surface of arbitrary shape, by regulating aluminium alloys adaptor can reach perfect fitting surface effect;
The utility model uses the dull and stereotyped curved slab that replaces, after installation, realize curved surface by three-dimensional regulating mechanism, compare with direct making curved surface panel, its cost reduces greatly, difficulty of processing and expense reduce greatly, farthest simplify and reduced design, processing, assembling difficulty and expense, there is good economic worth and using value, also can be applicable to can not realizing self bending material of making curved surface panel as titanium plate etc.
Brief description of the drawings
Fig. 1 is the structural representation of this Shi Xin Xing Transverse to section;
Fig. 2 is the structural representation of the utility model vertical cross section;
Fig. 3 is the transverse sectional view of the utility model metal decking and support keel junction;
Fig. 4, Fig. 5 are the longitudinal sectional views of metal decking and support keel junction in the utility model;
Number in the figure represents: 1-upside metal decking, 2-switching groove aluminium, 3-reinforcing rib section bar, 4-keel installation member, 4-1-circular base, 4-2-fixture section bar, 5-multidimensional adjustment means, 5-1-grafting profile base, 5-2-L-type grafting section bar, 5-3-inserting groove, 6-structure glue, 7-adjusting bolt, 8-adjustment hole, 9-cross binding keel, 10-downside metal decking, 11-junction plate, 12-tooth pad, 13-metal Roof panel.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.As Fig. 1, shown in Fig. 2, described multidimensional regulates hyperboloid titanium plate curtain wall mounting system to comprise curtain wall slab and cross binding keel, described curtain wall slab is to be spliced by polylith metal decking, every metal decking inner side is provided with cross binding keel, it is characterized in that: described cross binding keel 9 are round tubular structure, the length of every cross binding keel 9 is several times of metal decking length, the length of a general metal decking is 2m left and right, and the length of a support keel 9 is 6-7m, every keel can be installed the metal decking of three left and right, in installation process, guarantee that the joint location of two panels and the joint location of two keel stagger, cross binding keel 9 are arc, can directly be processed into drag keel, also can be on-the-spot bending, its radian calculates according to the curved surface radian of job site.On each support keel 9, be provided with keel installation member 4, every metal decking 1 is connected with cross binding keel 9 by least two multidimensional adjustment means 5, multiple multidimensional adjustment means 5 are arranged on two neighbouring metal decking junctions, two neighbouring metal deckings can be connected, and facilitate metal decking multidimensional to regulate.
As shown in Figure 3, Figure 4, described keel installation member is made up of circular base 4-1 and fixture section bar 4-2, circular base 4-1 is made up of two and half arcuate base, two and half arcuate base are set on cross binding keel 9, and fixing spacing by multiple bolts, the tail end of fixture section bar 4-2 is fixedly connected with by fastening bolt with circular base 4-1, and fixture section bar 4-2 bare terminal end and metal Roof panel 13 clamp, by keel installation to metal Roof panel 13.
As Fig. 3, shown in Fig. 5, described multidimensional adjustment means 5 is by grafting profile base 5-1, L-type grafting section bar 5-2 and inserting groove 5-3 composition, described grafting profile base 5-1 is also made up of two and half arcuate base, two and half arcuate base are set on cross binding keel 9, and fixing spacing by multiple bolts, be provided with junction plate 11 at grafting profile base 5-1 and L-type grafting section bar 5-2 junction, the horizontal plate of L-type grafting section bar 5-2 is placed in junction plate 11 belows, and be connected by adjusting bolt with junction plate, between the horizontal plate of L-type grafting section bar 5-2 and junction plate 11, be provided with tooth pad 12, tooth pad can be directly installed on the horizontal plate upper surface of L-type grafting section bar 5-2, convenient adjusting.Described L-type grafting section bar 5-2 is arranged on downside metal decking 10 inside upper part in two adjacent metal deckings, and offer adjustment hole 8 on its horizontal plate, as shown in Figure 3, on the horizontal plate of each L-type grafting section bar, offer multiple adjustment holes 8, ordinary circumstance 2-3 is better, each adjustment hole is strip, laterally be opened on the horizontal plate of L-type grafting section bar, and parallel with horizontal plate, in each adjustment hole 8, be provided with adjusting bolt 7, the horizontal plate of L-type grafting section bar is connected with the junction plate 11 of grafting profile base 5-1 by multiple adjusting bolts 7, and each adjusting bolt 7 can be in the interior movement of adjustment hole 8.
As shown in Figure 3, described metal decking adopts titanium plate, longitudinally be provided with many reinforcing rib section bars 3 at the back side of metal decking, every reinforcing rib section bar 3 is fixing by the flanging laminating of switching groove aluminium 2 and double-sided tape and metal decking, in gap between reinforcing rib section bar 3 and metal decking, be filled with structure glue 6, described L-type grafting section bar 5-2 and inserting groove 5-3 are bolted on respectively on the reinforcing rib section bar 3 of corresponding metal decking.As shown in Figure 4, Figure 5, described inserting groove 5-3 correspondence is arranged on upside metal decking 1 lower inside in two adjacent metal deckings, the base plate of inserting groove 5-3 is fixed by screws on the reinforcing rib section bar 3 of corresponding metal decking, its notch down, the vertical plate of L-type grafting section bar 5 is fixed by screws on the reinforcing rib section bar 3 of corresponding metal decking, and its upper end is corresponding inserts in inserting groove 5-3.
Panel of the present utility model is to adopt titanium plate directly in processing plant, to complete, panel cutting, channeling flanging complete by professional Digit Control Machine Tool, after flanging completes, reinforcing rib section bar 3 is fixing by transfer groove aluminium 2 and double-sided tape and panel 1 flanging laminating, gap between reinforcing rib section bar 3 and panel 1 is tamped by structure glue 6, then L-type grafting section bar 5-2 is installed in the upper end of each metal decking, and lower end correspondence position is provided with inserting groove 5-3.
When concrete installation: first metal Roof panel 14 is installed, arranging undetected looking into confirms without getting final product sectional fixture section bar 4-2 and circular base 4-1 after leak source, the bolt group of fixture section bar 4-2 and circular base 4-1 does not need to tighten, when cross binding keel 9 are located by total powerstation, after the angle of alignment jig section bar 4-1 upper-lower position, circular base 4-1 and cross binding keel 9 are worked good, then bolt group is tightened it is fixed, after 9 installations of cross binding keel, the metal decking of making just can be installed, metal decking directly adopts titanium flat board, downside metal decking 10 in two adjacent metal deckings is first installed, upside metal decking 10 is fixed on cross binding keel 9 by grafting profile base 5-1 by its top L-type grafting section bar 5-2, until metal decking through location after, upside metal decking 1 is installed again, upside metal decking 1 is also fixed on cross binding keel 9 by grafting profile base 5-1 by its top L-type grafting section bar 5-2, until metal decking through location after, the inserting groove 5-3 on base just can dock with the L-type grafting section bar 5-2 of mounted upside metal decking 1 before, after regulating the position, left and right of grafting profile base 5-1 and vertical plane internal rotation angle degree according to panel reinforcing rib section bar 3, grafting profile base 5-1 is fixed, reinforcing rib section bar 3 is fixed on L-type grafting section bar 5-2, so far, an erecting of panel completes, after installation, regulate the turnover relation of L-type grafting section bar 5-2 and grafting profile base 5-1 by adjusting bolt 7, make overall curved surface round and smooth.

Claims (7)

1. a multidimensional regulates hyperboloid titanium plate curtain wall mounting system, comprise curtain wall slab and cross binding keel, described curtain wall slab is to be spliced by polylith metal decking, every metal decking inner side is provided with cross binding keel, it is characterized in that: described cross binding keel (9) are round tubular structure, are provided with keel installation member (4) on support keel (9); every metal decking is connected with cross binding keel (9) by least two multidimensional adjustment means (5), multiple multidimensional adjustment means (5) are arranged on two neighbouring metal decking junctions, and each multidimensional adjustment means (5) is by grafting profile base (5-1), L-type grafting section bar (5-2) and inserting groove (5-3) composition, described grafting profile base (5-1) is fixed on cross binding keel (9), described L-type grafting section bar (5-2) is arranged on downside metal decking (10) inside upper part in two adjacent metal deckings, and on its horizontal plate, offer adjustment hole (8), described inserting groove (5-3) correspondence is arranged on upside metal decking (1) lower inside in two adjacent metal deckings, the horizontal plate of L-type grafting section bar (5-2) is connected with grafting profile base (5-1) by adjusting bolt (7), the vertical plate of L-type grafting section bar (5) is fixed on corresponding metal decking inner side, peg graft with corresponding inserting groove (5-3) in its upper end.
2. multidimensional according to claim 1 regulates hyperboloid titanium plate curtain wall mounting system, it is characterized in that: described cross binding keel (9) are curved circular tubulose keel.
3. multidimensional according to claim 1 and 2 regulates hyperboloid titanium plate curtain wall mounting system, it is characterized in that: described keel installation member is made up of circular base (4-1) and fixture section bar (4-2), circular base (4-1) is set on cross binding keel (9), and fix by screw, the tail end of fixture section bar (4-2) is fixedly connected with by fastening bolt with circular base (4-1), and fixture section bar (4-2) clamps by its bare terminal end and metal Roof panel (13).
4. multidimensional according to claim 1 and 2 regulates hyperboloid titanium plate curtain wall mounting system, it is characterized in that: described metal decking adopts titanium flat board, longitudinally be provided with many reinforcing rib section bars (3) at the back side of metal decking, every reinforcing rib section bar (3) is fixing by the flanging laminating of switching groove aluminium (2) and double-sided tape and metal decking, in gap between reinforcing rib section bar (3) and metal decking, be filled with structure glue (6), described L-type grafting section bar (5-2) and inserting groove (5-3) are bolted on respectively on the reinforcing rib section bar (3) of corresponding metal decking.
5. multidimensional according to claim 1 and 2 regulates hyperboloid titanium plate curtain wall mounting system, it is characterized in that: be provided with junction plate (11) in grafting profile base (5-1) and L-type grafting section bar (5-2) junction, the horizontal plate of L-type grafting section bar (5-2) is placed in junction plate (11) below, and be connected by adjusting bolt with junction plate (11), between the horizontal plate of L-type grafting section bar (5-2) and junction plate (11), be provided with tooth pad (12).
6. multidimensional according to claim 1 and 2 regulates hyperboloid titanium plate curtain wall mounting system, it is characterized in that: the circular base that described grafting profile base (5-1) and circular base (4-1) are all made up of two and half arcuate base, it is upper that two and half arcuate base are set in cross binding keel (9), and be bolted spacing.
7. multidimensional according to claim 1 and 2 regulates hyperboloid titanium plate curtain wall mounting system, it is characterized in that: be strip adjustment hole at adjustment hole (8), have one or more, all with laterally plate is parallel for each strip adjustment hole (8), is provided with adjusting bolt (7) in each adjustment hole (8).
CN201420156358.9U 2014-04-01 2014-04-01 Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall Expired - Fee Related CN203782942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420156358.9U CN203782942U (en) 2014-04-01 2014-04-01 Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420156358.9U CN203782942U (en) 2014-04-01 2014-04-01 Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall

Publications (1)

Publication Number Publication Date
CN203782942U true CN203782942U (en) 2014-08-20

Family

ID=51319144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420156358.9U Expired - Fee Related CN203782942U (en) 2014-04-01 2014-04-01 Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall

Country Status (1)

Country Link
CN (1) CN203782942U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089244A (en) * 2015-09-14 2015-11-25 苏州金螳螂建筑装饰股份有限公司 Dry-hanging system for decoration material with curved surface adjustable
CN105298143A (en) * 2015-05-12 2016-02-03 江苏南通六建建设集团有限公司 Construction method of multi-lateral double-curved-face open-type titanium composite board curtain wall
CN106930544A (en) * 2017-03-13 2017-07-07 河北卓秋实业有限公司 A kind of wall installation and guide device
CN110453835A (en) * 2019-08-16 2019-11-15 浙江省一建建设集团有限公司 A kind of modular aluminum facade mounting structure and its mounting process
CN111058560A (en) * 2019-12-18 2020-04-24 山西四建集团有限公司 Construction method of multi-curved-surface special-shaped combined curtain wall system
CN112049286A (en) * 2020-07-22 2020-12-08 中建二局装饰工程有限公司 Large-span special-shaped hyperboloid aluminum plate curtain wall system and construction method thereof
CN114592630A (en) * 2022-03-14 2022-06-07 中建八局第二建设有限公司 Plug board curtain wall structure and construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298143A (en) * 2015-05-12 2016-02-03 江苏南通六建建设集团有限公司 Construction method of multi-lateral double-curved-face open-type titanium composite board curtain wall
CN105298143B (en) * 2015-05-12 2019-06-21 江苏南通六建建设集团有限公司 Polygon hyperboloid open type titanium composite plate curtain wall construction method
CN105089244A (en) * 2015-09-14 2015-11-25 苏州金螳螂建筑装饰股份有限公司 Dry-hanging system for decoration material with curved surface adjustable
CN106930544A (en) * 2017-03-13 2017-07-07 河北卓秋实业有限公司 A kind of wall installation and guide device
CN110453835A (en) * 2019-08-16 2019-11-15 浙江省一建建设集团有限公司 A kind of modular aluminum facade mounting structure and its mounting process
CN111058560A (en) * 2019-12-18 2020-04-24 山西四建集团有限公司 Construction method of multi-curved-surface special-shaped combined curtain wall system
CN111058560B (en) * 2019-12-18 2021-09-21 山西四建集团有限公司 Construction method of multi-curved-surface special-shaped combined curtain wall system
CN112049286A (en) * 2020-07-22 2020-12-08 中建二局装饰工程有限公司 Large-span special-shaped hyperboloid aluminum plate curtain wall system and construction method thereof
CN114592630A (en) * 2022-03-14 2022-06-07 中建八局第二建设有限公司 Plug board curtain wall structure and construction method

Similar Documents

Publication Publication Date Title
CN203782942U (en) Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall
CN205713146U (en) A kind of quick location and installation attachment structure of PC prefabricated panel
CN107338887A (en) Only have the connection method of flat out of plane constraint and upper connecting node at the top of out-hung panel
CN212026786U (en) Fastener device suitable for detachable steel bar truss building carrier plate
CN205394052U (en) Drilling fixture of steel -structure connecting plate
CN102312540A (en) Vertical dry-hanging mounting structure of stone
CN103669663A (en) Back-bolt type dry-hang curtain wall system
CN202324501U (en) Full clamping piece connecting member for mounting low carbon board on building outer brim
CN202380694U (en) Plastering board dedicated to splits
WO2014135059A1 (en) Panel-type light steel beam irregularly-shaped dropped ceiling structure
CN203977672U (en) A kind of roof suspended ceiling integrated member
CN202148664U (en) Stone material dry-hang mounting structure of vertical surface
CN204983341U (en) Wall crown face curved surface hanger plate mounting structure
CN211143454U (en) Suspended ceiling board fixing structure
CN211850805U (en) Novel concrete embedded bolt mechanism
CN209538717U (en) A kind of precast concrete assembly auxiliary device
CN202164779U (en) Dry-hanging installation structure for vertical faces of stone materials
CN211714196U (en) Adjustable purlin holds in palm
CN202914109U (en) Integral type lining system of light-section cable tunnel
CN107965145B (en) Horizontal convex concrete construction joint hanging die supporting device
CN207484800U (en) Flat-top furred ceiling transverse and longitudinal keel connecting structure
CN208916587U (en) A kind of combined type lifting tooling for PC wallboard
CN211037416U (en) Assembled shear force wall sealing device that is in milk
CN204475844U (en) A kind of platform mould holder connector
CN204899034U (en) Prefabricated wall post

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820