CN203392680U - Self-elevating platform lifting mechanism for construction elevator - Google Patents
Self-elevating platform lifting mechanism for construction elevator Download PDFInfo
- Publication number
- CN203392680U CN203392680U CN201320526636.0U CN201320526636U CN203392680U CN 203392680 U CN203392680 U CN 203392680U CN 201320526636 U CN201320526636 U CN 201320526636U CN 203392680 U CN203392680 U CN 203392680U
- Authority
- CN
- China
- Prior art keywords
- pulley
- self
- jack
- drilling platform
- elevating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model belongs to the technical field of construction elevators, and particularly relates to a self-elevating platform lifting mechanism for a construction elevator. The mechanism comprises a top standard section and a self-elevating platform; the mechanism is characterized by also comprising a movable pulley bracket, a pulley, a winch, a fixed pulley and a steel wire rope, wherein the movable pulley bracket is movably arranged on the top standard section, the pulley is arranged on the movable pulley bracket, the winch and the fixed pulley are fixedly arranged on the self-elevating platform; the steel wire rope passes through and bypasses the pulley and the fixed pulley, one end of the steel wire rope is fixed on and wound around a rope wheel (7) of the winch, and the other end of the steel wire rope is tied on the self-elevating platform. According to the self-elevating platform lifting mechanism, the power does not depend on manpower, but comes from an electric driving mechanism; the manufacturing cost is low; and no part is temporarily assembled and installed in the self-elevating operation process, and therefore, the operation process is simple and safe.
Description
Technical field
The utility model belongs to building hoist technical field, is specifically related to a kind of building hoist jack up drilling platform lift system.
Background technology
Building hoist is widely used a kind of vertical transportation machinery in modern architecture construction, is mainly used in the transportation up and down of workmen, building materials and construction equipment.Building hoist has counterweight building hoist and counterweightless building hoist according to there being counterweightless to be divided into.Present stage has that the building hoist of counterweight is low because consuming energy, guide rail bracket reasonable stress, starting current are little, electrical network is impacted to the plurality of advantages such as little, and Occupation coefficient is higher.But it is loaded down with trivial details that the standard knot installation of its guide rail bracket, dismounting are compared with the building hoist of counterweightless, in operation, there are some potential safety hazards.Deficiency for existing, has much designed polytype jack up drilling platform with administrative staff now, has realized building hoist dependence self accessory device and has carried out Assembly &Disassembly.If announcement number in prior art is the patent " S type building hoist jack up drilling platform " of CN2878305Y, its vertical transport function of utilizing elevator basket connects standard knot to transport near jack up drilling platform from ground, do not need extra lifting appliance, safe, reliable, convenient, but its power from liter and lifting is from manual hoist, and workman need to stand on service platform around the work of upright post of elevator surrounding, need to consume human resources, also has potential safety hazard.Notification number is the patent " elevator frame for construction " of CN201228183Y, and it uses hydraulic gear to carry out the lifting of jack up drilling platform, and hydraulic gear exists cost high, to the high disadvantage that requires of installing.Notification number is the patent " construction elevator moves lifting stock " of CN200954969Y, and it exists the parts that have from lift operations process to need occasional combination to install, the disadvantage of operating process trouble.
Utility model content
The disadvantage existing for above-mentioned prior art, the purpose of this utility model is that a kind of building hoist jack up drilling platform lift system will be provided, its power is without relying on manpower, but comes from electric driving mechanism; Cheap; From lift operations process without there being again parts occasional combination to install, the simple and safety of operating process.
Above-mentioned goal of the invention is achieved through the following technical solutions, a kind of building hoist jack up drilling platform lift system, comprise top standard knot, jack up drilling platform, its main points are, it also comprise be movablely contained in the pulley that fills on movable pulley support on the standard knot of top, movable pulley support, be installed on winch on jack up drilling platform and fixed pulley, steel rope; Steel rope is worn and is walked around pulley, fixed pulley, and one end is fixed and is wound on the rope sheave of winch, and the other end fixedly ties up on jack up drilling platform.
As preferably, two pulleys are equipped with at the described movable pulley support two ends that make progress, and two ends can be inserted in respectively in the hole of column of top standard knot and fix downwards.
As preferably, described movable pulley support upwards one side is equipped with a pulley, and one side can be inserted in the hole of column of top standard knot and fix downwards.
The utility model compared with prior art tool has the following advantages: when supernumerary segment or dismounting, steel rope is worn and walked around pulley, fixed pulley, and one end is fixed and is wound on the rope sheave of winch, and the other end fixedly ties up on jack up drilling platform.Start winch, can realize the lifting of jack up drilling platform, the peace that completes standard knot by the suspender on jack up drilling platform is torn operation open; This kind of jack up drilling platform lift system is simple in structure, and dependable performance is safe; Winch is driven by motor, does not need to use artificial manual hoist; From lift operations process, without there being parts occasional combination to install, operating process is simple and efficiency is high again; Also have its low cost of manufacture, easily promote.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model
Fig. 2 is the birds-eye view of Fig. 1
Fig. 3 is the left view of Fig. 1
Fig. 4 is the structural representation that the utility model is implemented on building hoist
Number in the figure is: 1-movable pulley support ,2-top standard knot, 3-steel rope, 4-fixed pulley, 5-jack up drilling platform, 6-winch, 7-rope sheave, 8-pulley, 9-building hoist, 10-support body, 11-suspender, 12-standard knot, 13-cage, 14-counterweight, cage at the bottom of 15-
The specific embodiment
Below in conjunction with all embodiment that show of accompanying drawing 1-4, the utility model is further described:
It comprises top standard knot 2, jack up drilling platform 5, it also comprises movable two movable pulley supports 1 that are contained on top standard knot 2, each movable pulley support 1 is upwards equipped with two pulleys 8 in two ends, downwards two ends can be inserted in respectively in the hole of column of top standard knot 2 and fix, and it also comprises the winch 6 that is installed on jack up drilling platform 5 and two fixed pulleys 4, steel rope 3; Steel rope 3 one end are fixed and are wound on the rope sheave 7 of winch 6, then wear two pulleys 8 on a movable pulley support 1 walking around a side wherein, wear again two fixed pulleys 4 walking around on jack up drilling platform 5, wear again two pulleys 8 on a movable pulley support 1 walking around opposite side wherein, finally steel rope 3 other ends are fixedly tied up to jack up drilling platform 5.
Above-described embodiment is contained on building hoist 9, and building hoist 9 also comprises support body 10, the standard knot 12 of suspender 11, top standard knot below 2, cage 13, counterweight 14, end cage 15.
When supernumerary segment or dismounting, first the downward two ends of two movable pulley supports 1 are inserted in respectively in the hole of column of top standard knot 2 fixing, then unclamp the steel rope 3 on rope sheave 7, steel rope 3 is worn successively walk around two pulleys 8 on a movable pulley support 1 of a side wherein, wear again two fixed pulleys 4 walking around on jack up drilling platform 5, wear again two pulleys 8 on a movable pulley support 1 walking around opposite side wherein, finally steel rope 3 other ends are fixedly tied up to jack up drilling platform 5.Start winch 6, jack up drilling platform 5 is risen to from the support body 10 about 1m in top, height is added about 30Cm safety distance and is as the criterion with suspension rod 1 standard knot of slinging, then with cage 13, liter being saved to standard knot is transported to from ground from jack up drilling platform 5 positions, about 1m left and right, bottom and stops, now can start the suspender 11 on jack up drilling platform 5, standard knot is winched to top standard knot 2 tops, after aiming at bolt mounting holes, slowly put down, put on standard knot 12 attachment bolts, pad and nut are also fastening, and 12 liters of joints of such standard knot complete.Repeat above step, can complete the operation of 12 liters of joints of standard knot; By rising joint operation reverse operating, can realize standard knot 12 field-strips.
It is apparent to one skilled in the art that the utility model can be changed into various ways, and such change is not thought and departed from scope of the present utility model.All such to the apparent modification of described those skilled in the art by within being included in the scope of this claim.
Claims (3)
1. a building hoist jack up drilling platform lift system, comprise top standard knot, jack up drilling platform, it is characterized in that, it also comprise be movablely contained in the pulley that fills on movable pulley support on the standard knot of top, movable pulley support, be installed on winch on jack up drilling platform and fixed pulley, steel rope; Steel rope is worn and is walked around pulley, fixed pulley, and one end is fixed and is wound on the rope sheave of winch, and the other end fixedly ties up on jack up drilling platform.
2. according to a kind of building hoist jack up drilling platform lift system of claim 1 art, it is characterized in that the described movable pulley support two ends that make progress are equipped with two pulleys, two ends can be inserted in respectively in the hole of column of top standard knot and fix downwards.
3. according to a kind of building hoist jack up drilling platform lift system of claim 1 art, it is characterized in that described movable pulley support upwards one side a pulley is housed, one side can be inserted in the hole of column of top standard knot and fix downwards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320526636.0U CN203392680U (en) | 2013-08-27 | 2013-08-27 | Self-elevating platform lifting mechanism for construction elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320526636.0U CN203392680U (en) | 2013-08-27 | 2013-08-27 | Self-elevating platform lifting mechanism for construction elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203392680U true CN203392680U (en) | 2014-01-15 |
Family
ID=49904227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320526636.0U Expired - Fee Related CN203392680U (en) | 2013-08-27 | 2013-08-27 | Self-elevating platform lifting mechanism for construction elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203392680U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112623981A (en) * | 2020-12-09 | 2021-04-09 | 日立电梯(中国)有限公司 | Mounting method of hoisting equipment |
-
2013
- 2013-08-27 CN CN201320526636.0U patent/CN203392680U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112623981A (en) * | 2020-12-09 | 2021-04-09 | 日立电梯(中国)有限公司 | Mounting method of hoisting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101863422A (en) | Rubber-tyred gantry crane with suspension crane and construction method thereof | |
CN205591111U (en) | Portable type bridge of cantilever type bottom is repaired and is used platform device | |
CN203699606U (en) | Lifter and iron tower | |
CN104477736A (en) | Shaft elevator installation method | |
CN216341336U (en) | Adjustable inverted frame structure of 750 x 750mm cross-section holding rod system | |
CN205387439U (en) | Mast hoisting accessory | |
CN203392680U (en) | Self-elevating platform lifting mechanism for construction elevator | |
CN106245984B (en) | Jack up Multifunctional creeping gin pole | |
CN203382467U (en) | Hanging operation vehicle | |
JP2007261720A (en) | Removing device for steel tower elevator rail and rail removing method by use of it | |
CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
CN2926179Y (en) | Horizontal liftable platform | |
CN203461720U (en) | Simple cantilever hoisting machine | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN106012854B (en) | The transporting equipment of prefabricated assembled overpass bridge plate | |
CN205275061U (en) | Semi -portal crane | |
CN201292509Y (en) | Suspension bridge main girder construction segment conveying facilities | |
CN202787930U (en) | Hanging basket for high-place operations | |
CN201801267U (en) | Simple passenger carrying device for large-sized hoisting facility | |
CN203319620U (en) | Portable jack | |
CN202766210U (en) | Cable cover plate lifting device | |
CN202808252U (en) | Small-sized light hoisting equipment | |
CN201857225U (en) | Hoisting device for bridge crane frame | |
CN102733612A (en) | Mounting method of electric hoist orbit | |
CN2244546Y (en) | Self-lifting guide support adding device for construction elevator cage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140115 Termination date: 20150827 |
|
EXPY | Termination of patent right or utility model |