CN102733612A - Mounting method of electric hoist orbit - Google Patents

Mounting method of electric hoist orbit Download PDF

Info

Publication number
CN102733612A
CN102733612A CN201210137943XA CN201210137943A CN102733612A CN 102733612 A CN102733612 A CN 102733612A CN 201210137943X A CN201210137943X A CN 201210137943XA CN 201210137943 A CN201210137943 A CN 201210137943A CN 102733612 A CN102733612 A CN 102733612A
Authority
CN
China
Prior art keywords
electric block
track
concrete
construction
block track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210137943XA
Other languages
Chinese (zh)
Other versions
CN102733612B (en
Inventor
齐利涛
刘宝生
韩香宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN201210137943.XA priority Critical patent/CN102733612B/en
Publication of CN102733612A publication Critical patent/CN102733612A/en
Application granted granted Critical
Publication of CN102733612B publication Critical patent/CN102733612B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a mounting method of an electric hoist orbit. The method comprises the following steps of: (1) building a full scaffolding; (2) hoisting an electric hoist orbit to the full scaffolding which is built completely by a tower; (3) hanging a chain block at a flying ring preserved on a concrete floor which is constructed completely, hoisting the electric hoist orbit to a designated position by using the chain block, and connecting a plurality of connection plates on a concrete beam by a tensile bolt and fixedly connecting the lower parts of the plurality of connection plates with the electric hoist orbit through sheared bolts. By utilizing the method, a good construction platform is provided, an I-shaped steel is hoisted onto the scaffolding, and the built full scaffolding is a good construction platform, so that construction members can splice the I-shaped steel on the platform according to a drawing paper; and moreover, the mounting position of the platform distance is less than 1m, so that the construction is very convenient.

Description

The electric block pwoer track installing method
Technical field
The present invention relates to a kind of pwoer track installing method, relate in particular to the electric block pwoer track installing method.
Background technology
Electric block is called for short electric hoist, is a kind of small-sized crane gear.Most electric blocks use button to follow manipulation on ground by the people, or also can in drivers' cab, handle or adopt wired (wireless) far distance controlled.Electric block is used in the middle of industrial construction very widely.It also is unit in charge of construction's one of requisite construction content in construction that the electric block track is installed.At present after general mounting method in the middle of the industrial construction is earlier the concrete frame construction to be accomplished; Adopt mobile crane that " worker " word steel is winched on the concrete slab; On with concrete slab, set up scaffold, slinging " worker " word steel from concrete slab then, at last fixed installation.But there are a lot of drawbacks in the method, wastes very much such as the use of mobile crane, and the secondary of scaffold is set up and removed, and makes cost increase claim for eot." worker " word steel is sling from concrete slab, and slinging is excessive height, and safety factor is low.
Summary of the invention
The objective of the invention is to overcome the deficiency of prior art, a kind of cost that greatly reduces be provided, install very fast, the electric block pwoer track installing method very easily of constructing.
Electric block pwoer track installing method of the present invention, it may further comprise the steps:
(1) sets up full hall scaffold;
(2) will hang by the electric block track that i iron is processed on the full hall scaffold of setting up after the completion with tower crane; Assembly unit electric block track in advance on described full hall scaffold is put well below position to be installed then, waits for that laying template and the fluid concrete accomplishing concrete floor and is connected fixing concrete beam with the electric block track construct;
(3) the suspension ring place that on the concrete floor that construction is accomplished, reserves hangs up jack; Adopt jack that the electric block track is hung assigned address then, on concrete beam, connect a plurality of junction plates then through tension bolt and with the bottom of described a plurality of junction plates respectively through being cut bolt and the electric block track is fixedly linked.
The invention has the beneficial effects as follows: 1. good operation platform is arranged, and is that " worker " word steel is hung on the scaffold in this construction, and the full hall scaffold of setting up is a good operation platform, and the constructor can be according to drawing assembly unit on platform good " worker " word steel.Platform is apart from one meter of installation site less than, and it is very convenient to construct.2. need not secondary and set up cripple and mobile crane lifting, the scaffold when this method is directly utilized the reinforced concrete frame structure construction is platform, does not need secondary to set up cripple during installation; Directly utilize the tower crane in reinforced concrete frame when construction before topping out, to carry out slinger's word rail road, need not rental car and hang and wait other lifting devices, time saving and energy saving, safety factor is high.3. it is workable to construct, and does not need secondary to set up cripple and other equipment, can save that steel pipe uses and the expense of lifting machine, greatly reduces cost, installs very soon, guarantee is provided to the duration.In the middle of industrial construction, obtained using widely.
Description of drawings
Accompanying drawing is an electric block pwoer track installing method scheme of installation of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is specified:
Electric block pwoer track installing method shown in accompanying drawing, it may further comprise the steps: full hall scaffold is set up in (1); (2) will hang by the electric block track 2 that i iron is processed on the full hall scaffold of setting up after the completion 1 with tower crane; Assembly unit electric block track in advance on described full hall scaffold is put well below position to be installed then, waits for that laying template and the fluid concrete accomplishing concrete floor and is connected fixing concrete beam with the electric block track construct; (3) the suspension ring place that on the concrete floor that construction is accomplished, reserves hangs up jack; Adopt jack that the electric block track is hung assigned address then, on concrete beam, connect a plurality of junction plates 5 then and also the bottom of described a plurality of junction plates is fixedly linked with the electric block track through cutting bolt 4 respectively through tension bolt 3.
Preferably after accomplishing described step (3),, between described electric block track and junction plate, be connected with diagonal brace when the distance of electric block rail top face to concrete beam bottom surface during greater than 6000mm.Can guarantee like this that track does not produce and rock.
The installation of electric block track meets the examination of " code for acceptance of construction quality of steel structures ", " universal industrial mill construction component standard atlas " (ANALYSIS FOR STEEL CRANE GIRDERS) G-426 () check crane girder and each item regulation of design document.
Embodiment 1
(1) sets up full hall scaffold; (2) will hang by the electric block track that " worker " word steel is processed on the full hall scaffold of setting up after the completion with tower crane; Assembly unit electric block track in advance on described full hall scaffold is put well below position to be installed then, waits for that laying template and the fluid concrete accomplishing concrete floor and is connected fixing concrete beam with the electric block track construct; (3) the suspension ring place that on the concrete floor that construction is accomplished, reserves hangs up jack; Adopt jack that the electric block track is hung assigned address then, on concrete beam, connect a plurality of junction plates then through tension bolt and with the bottom of described a plurality of junction plates respectively through being cut bolt and the electric block track is fixedly linked.
Adopt this method easy construction, duration to compare with conventional method and accelerated the duration; Reduced operating expenses, and the installation of electric block track meets the examination of " code for acceptance of construction quality of steel structures ", " universal industrial mill construction component standard atlas " (ANALYSIS FOR STEEL CRANE GIRDERS) G-426 () check crane girder and each item regulation of design document.
Embodiment 2
(1) sets up full hall scaffold; (2) will hang by the electric block track that " worker " word steel is processed on the full hall scaffold of setting up after the completion with tower crane; Assembly unit electric block track in advance on described full hall scaffold is put well below position to be installed then, waits for that laying template and the fluid concrete accomplishing concrete floor and is connected fixing concrete beam with the electric block track construct; (3) the suspension ring place that on the concrete floor that construction is accomplished, reserves hangs up jack; Adopt jack that the electric block track is hung assigned address then, on concrete beam, connect a plurality of junction plates then through tension bolt and with the bottom of described a plurality of junction plates respectively through being cut bolt and the electric block track is fixedly linked.(4) electric block rail top face to the distance of concrete beam bottom surface connects diagonal brace greater than 6000mm4 between described electric block track and junction plate.
Adopt this method easy construction, duration to compare with conventional method and accelerated the duration; Reduced operating expenses, and the installation of electric block track meets the examination of " code for acceptance of construction quality of steel structures ", " universal industrial mill construction component standard atlas " (ANALYSIS FOR STEEL CRANE GIRDERS) G-426 () check crane girder and each item regulation of design document.

Claims (2)

1. electric block pwoer track installing method is characterized in that it may further comprise the steps:
(1) sets up full hall scaffold;
(2) will hang by the electric block track that i iron is processed on the full hall scaffold of setting up after the completion with tower crane; Assembly unit electric block track in advance on described full hall scaffold is put well below position to be installed then, waits for that laying template and the fluid concrete accomplishing concrete floor and is connected fixing concrete beam with the electric block track construct;
(3) the suspension ring place that on the concrete floor that construction is accomplished, reserves hangs up jack; Adopt jack that the electric block track is hung assigned address then, on concrete beam, connect a plurality of junction plates then through tension bolt and with the bottom of described a plurality of junction plates respectively through being cut bolt and the electric block track is fixedly linked.
2. electric block pwoer track installing method according to claim 1; It is characterized in that: after accomplishing described step (3); When the distance of electric block rail top face to concrete beam bottom surface during, between described electric block track and junction plate, be connected with diagonal brace greater than 6000mm.
CN201210137943.XA 2012-05-04 2012-05-04 Mounting method of electric hoist orbit Active CN102733612B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210137943.XA CN102733612B (en) 2012-05-04 2012-05-04 Mounting method of electric hoist orbit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210137943.XA CN102733612B (en) 2012-05-04 2012-05-04 Mounting method of electric hoist orbit

Publications (2)

Publication Number Publication Date
CN102733612A true CN102733612A (en) 2012-10-17
CN102733612B CN102733612B (en) 2014-10-29

Family

ID=46989857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210137943.XA Active CN102733612B (en) 2012-05-04 2012-05-04 Mounting method of electric hoist orbit

Country Status (1)

Country Link
CN (1) CN102733612B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821362A (en) * 2014-03-07 2014-05-28 中化二建集团有限公司 Synchronous construction method for constructing suspended rail beam and roof
CN113062579A (en) * 2021-03-05 2021-07-02 上海建工一建集团有限公司 Construction method for reforming existing large-space structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1024574A1 (en) * 1982-03-23 1983-06-23 Проектный и научно-исследовательский институт "Донецкий ПромстройНИИпроект" Horizontally sliding forms
CN2248212Y (en) * 1994-10-19 1997-02-26 万文革 Rail-lifting scaffold
JP2000274069A (en) * 1999-03-26 2000-10-03 Osamu Okuda Lift for scaffold component member
DE202008010192U1 (en) * 2008-07-30 2009-03-12 Innosteel Kytzia Gmbh Storage device for heavy components
CN201288019Y (en) * 2008-09-20 2009-08-12 朱长安 Double-track single-main girder of electric block type crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1024574A1 (en) * 1982-03-23 1983-06-23 Проектный и научно-исследовательский институт "Донецкий ПромстройНИИпроект" Horizontally sliding forms
CN2248212Y (en) * 1994-10-19 1997-02-26 万文革 Rail-lifting scaffold
JP2000274069A (en) * 1999-03-26 2000-10-03 Osamu Okuda Lift for scaffold component member
DE202008010192U1 (en) * 2008-07-30 2009-03-12 Innosteel Kytzia Gmbh Storage device for heavy components
CN201288019Y (en) * 2008-09-20 2009-08-12 朱长安 Double-track single-main girder of electric block type crane

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴祥生等: "起重机轨道安装", 《起重运输机械》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821362A (en) * 2014-03-07 2014-05-28 中化二建集团有限公司 Synchronous construction method for constructing suspended rail beam and roof
CN103821362B (en) * 2014-03-07 2015-10-28 中化二建集团有限公司 Outstanding beam-and-rail and roofing construction method for synchronously constructing
CN113062579A (en) * 2021-03-05 2021-07-02 上海建工一建集团有限公司 Construction method for reforming existing large-space structure

Also Published As

Publication number Publication date
CN102733612B (en) 2014-10-29

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN106193618A (en) A kind of Long span aerial steel structure truss construction
CN104477736A (en) Shaft elevator installation method
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN201417657Y (en) Installation device of indoor transformer
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN103912128A (en) Construction method of high-altitude one-piece steel truss
CN202945798U (en) Overhanging type scaffold corner device
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN204626930U (en) Integrated lifting frame operating platform
CN103061514A (en) Long-span steel structure corridor construction method
CN102733612B (en) Mounting method of electric hoist orbit
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN104404888A (en) Large hoisting system allowing gradient to be adjusted in air and application
CN102372228B (en) Translational installation method for large-span crane beam
CN105040592B (en) Horizontal pull rope bridge and erection method thereof
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN203613464U (en) Slip form construction cargo transportation device
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 300301 Dongli District, flawless Street Jintang Highway Bridge No. ten

Patentee after: MCC TIANGONG GROUP TIANJIN CO., LTD.

Address before: 300301, No. ten bridge, Tianjin, Dongli

Patentee before: Tianjin MCC20 Construction Co., Ltd.