CN203321583U - Vertical sedimentation sand silo - Google Patents

Vertical sedimentation sand silo Download PDF

Info

Publication number
CN203321583U
CN203321583U CN2013202791060U CN201320279106U CN203321583U CN 203321583 U CN203321583 U CN 203321583U CN 2013202791060 U CN2013202791060 U CN 2013202791060U CN 201320279106 U CN201320279106 U CN 201320279106U CN 203321583 U CN203321583 U CN 203321583U
Authority
CN
China
Prior art keywords
pipe
overflow
sand
sand silo
bleed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202791060U
Other languages
Chinese (zh)
Inventor
王兴铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baiyin Nonferrous Group Co Ltd
Original Assignee
Baiyin Nonferrous Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baiyin Nonferrous Group Co Ltd filed Critical Baiyin Nonferrous Group Co Ltd
Priority to CN2013202791060U priority Critical patent/CN203321583U/en
Application granted granted Critical
Publication of CN203321583U publication Critical patent/CN203321583U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a vertical sedimentation sand silo which comprises sand silo bodies and a feeding pipe arranged on the sand silo bodies. An overflow groove is formed in the upper portion inside each sand silo body, feeding ports of the feeding pipe are horn-shaped ports, a reflective plate is arranged at each horn-shaped port, and a siphoning overflow pipe is arranged in each overflow groove. The two sand silo bodies are communicated through a communicating pipe, and the communicating pipe is located below the overflow grooves. According to the vertical sedimentation sand silo, the siphoning overflow pipes can achieve the siphoning function and are swift and violent in flow and large in discharge capacity in the process of work, the siphoning function is damaged automatically and flow cutoff is fast when the amount of liquid flowing into the overflow grooves is small, and therefore the problem that the overflow pipes are frozen and blocked by a small flow of overflow water is solved; besides, the two sand silo bodies are connected in series to work, therefore, the sedimentation area is enlarged, sedimentation time is prolonged, corresponding surface loads are reduced, and sedimentation efficiency is greatly improved.

Description

A kind of vertical precipitation sand storehouse
Technical field
The utility model belongs to the mining technique field, relates to a kind of vertical precipitation sand storehouse.
Background technology
At present, many vertical sand warehouses that use in tailing fill method mainly exist two large class technical barriers:
The one, the bleed off pipe in sand storehouse all adopts common submerged to go out stream; Winter spillway discharge hour, the frozen block problem can occur in bleed off pipe frequently.Although taked certain measure: 1) the bleed off pipe tube head is replaced by flexible pipe, flow hour is manually mentioned, and when flow is large, manually puts down; 2) electric heating thermal insulation band helical form is wrapped on bleed off pipe, by electric heating thermal insulation, brings bleed off pipe heating, prevent from being frozen to block, but fail all the time fundamentally to solve the difficult problem of vertical sand warehouse bleed off pipe frozen block in winter.
The 2nd, the tailings slurry deposition efficiency be transported in the sand storehouse is low, and many fine grained tailings even part coarse granule tailings are also drained with overflow water, not only reduced the utilization rate of tailings but also caused environment pollution.
The utility model content
The purpose of this utility model is the problem existed for prior art, and a kind of vertical precipitation sand storehouse is provided.
A kind of vertical precipitation sand of the present utility model storehouse, comprise the sand storehouse and on feed pipe, sand storehouse internal upper part is provided with bypass channel, the charging aperture of described feed pipe is horn mouth, and is provided with reflecting plate at the horn mouth place; Be provided with the siphon bleed off pipe in described bypass channel.
In order better to control the generation of siphon overflow, described siphon bleed off pipe top is provided with by-pass valve control.
In order to increase desilting area, extend the sedimentation time, set up two sand storehouses that are communicated with by communicating pipe, and be positioned at the below of bypass channel communicating pipe.
In order effectively to control the connection in two sand storehouses, described communicating pipe is provided with valve.
The relative prior art of the utility model has the following advantages:
1, the utility model adopts the siphon bleed off pipe, during work, siphon bleed off pipe flow is swift and violent, discharge capacity is large, the amount of liquid that flows into bypass channel hour, siphon destroys automatically, cutout fast, has prevented the difficult problem of low discharge overflow water frozen block bleed off pipe, has effectively improved the mobility of slurry in the sand storehouse simultaneously.
2, horn mouth of the present utility model and reflecting plate can make the tailings slurry be uniformly distributed to surrounding, make the precipitation of tailings slurry more effective.
3, the utility model adopts the working method of two sand storehouse series connection, has increased desilting area, has extended the sedimentation time, has reduced corresponding surface loading, and deposition efficiency improves greatly.
The accompanying drawing explanation
Fig. 1 is the structural representation of existing vertical sand warehouse;
Fig. 2 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated.
The structural representation of existing vertical sand warehouse as shown in Figure 1, the vertical sand warehouse 1 that comprises vertical setting, feed pipe 4 is equipped with on the top in sand storehouse 1, sand storehouse 1 internal upper part is provided with bypass channel 2, the bottom of bypass channel 2 is provided with delivery port, and this delivery port is connected with an end of bleed off pipe 10, and the other end of bleed off pipe 10 communicates with reservoir, separate between bleed off pipe, separate between the sand storehouse.
Existing vertical sand warehouse tailings slurry directly enters into the sand storehouse from feed pipe, part coarse granule tailings is deposited to the Sha Cang settling zone, fine grained tailings and water are along with the liquid level that increases of inlet constantly rises, and while surpassing the top of bypass channel 2, start to enter in bypass channel 2, flow into bleed off pipe 10 by delivery port, along bleed off pipe 10, flow into reservoir; In the winter time, if when spillway discharge is larger, a large amount of water rapidly flows out by bleed off pipe 10, if spillway discharge is less, the water overflowed is interior slowly mobile at bleed off pipe 10, easily freezes, and causes bleed off pipe 3 frozen blocks, causes vertical sand warehouse not use.Tailing slurry directly enters into warehouse by feed pipe 4 simultaneously, large to the precipitation disturbance of tailings, even settled part tailings can be stirred to overflow, and this kind of situation is particularly serious when sand storehouse material level is higher.
Of the present utility model a kind of vertical precipitation sand storehouse as shown in Figure 2, comprise sand storehouse 1 and on feed pipe 4, sand storehouse 1 internal upper part is provided with bypass channel 2, the charging aperture 5 of feed pipe 4 is horn mouth, and is provided with reflecting plate 6 at the horn mouth place; Be provided with siphon bleed off pipe 3 in bypass channel 2.
Siphon bleed off pipe 3 tops are provided with by-pass valve control 7.It comprises two sand storehouses that are communicated with by communicating pipe 8, and communicating pipe 8 is positioned at the below of bypass channel 2, and communicating pipe 8 is provided with valve 9.
Bypass channel 2 bottoms do not have delivery port, and siphon bleed off pipe 3 enters in sand storehouse 1 and stretches into bypass channel 2 from bypass channel 2 tops, with bypass channel 2 bottom connections, do not touch, and siphon bleed off pipe 3 tops are provided with the work that siphon by-pass valve control 7 can Artificial Control siphon bleed off pipe 3.
During winter, the communicating pipe valve in two sand storehouses 9 is closed, two sand storehouses are separate, siphon by-pass valve control 7 is closed, the tailings slurry enters by feed pipe 4, from horn mouth 5, flow out, obstruction through reflecting plate 6 is uniformly distributed to surrounding, then the whole section along sand storehouse 1 rises, tailings sinks to the Sha Cang settling zone, and overflow water enters in bypass channel 2 when liquid level surpasses bypass channel 2 top, when the water inlet that the liquid in flowing into bypass channel 2 floods siphon bleed off pipe 3 also raises gradually, automatically form siphon, the overflow water in bypass channel 2 is discharged rapidly.During work, the syphon flow is swift and violent, and discharge capacity is large, and the amount of liquid that flows into bypass channel 2 hour, siphon destroys automatically, and cutout fast, has prevented the difficult problem of low discharge overflow water frozen block bleed off pipe, effectively improved the mobility of slurry in the sand storehouse, improved deposition efficiency simultaneously.
During other seasons, the tailings slurry enters by the feed pipe 4 in sand storehouse 1, from horn mouth 5, flow out, obstruction through reflecting plate 6 is uniformly distributed to surrounding, tailings sinks to the Sha Cang settling zone, unnecessary liquid is by entering into another sand storehouse communicating pipe 8, again precipitate, tailings sinks to the Sha Cang settling zone, bypass channel 2 tops that overflow water surpasses another sand storehouse enter in the bypass channel 2 in another sand storehouse, when the water inlet that the liquid in flowing into bypass channel 2 floods siphon bleed off pipe 3 also raises gradually, automatically form siphon, liquid in bypass channel 2 is discharged rapidly, now the by-pass valve control 7 of sand storehouse 1 siphon bleed off pipe 3 is opened (bleed off pipe 3 in sand storehouse 1 can't form siphon), siphon bleed off pipe 3 by-pass valve controls 7 in another sand storehouse are closed (bleed off pipe 3 in another sand storehouse can form siphon), be equivalent to like this two sand storehouse tandem workings, make desilting area increase one times, sedimentation time extends one times, corresponding surface loading has reduced one times, deposition efficiency improves greatly.Otherwise slip also can enter from another sand storehouse, from the siphon bleed off pipe 3 in sand storehouse 1, flow out, now siphon bleed off pipe 3 by-pass valve controls 7 in sand storehouse 1 are closed, siphon bleed off pipe 3 by-pass valve controls 7 in another sand storehouse are opened, therefore another sand storehouse siphon bleed off pipe can't form siphon, sand storehouse 1 siphon bleed off pipe can form the siphon overflow.

Claims (4)

1. a vertical precipitation sand storehouse, comprise sand storehouse (1) and on feed pipe (4), sand storehouse (1) internal upper part is provided with bypass channel (2), it is characterized in that: the charging aperture (5) of described feed pipe (4) is horn mouth, and is provided with reflecting plate (6) at the horn mouth place; Be provided with siphon bleed off pipe (3) in described bypass channel (2).
2. vertical precipitation sand as claimed in claim 1 storehouse, it is characterized in that: described siphon bleed off pipe (3) top is provided with by-pass valve control (7).
3. vertical precipitation sand as claimed in claim 1 or 2 storehouse is characterized in that: it comprises two sand storehouses that are communicated with by communicating pipe (8), and communicating pipe (8) is positioned at the below of bypass channel (2).
4. a kind of vertical precipitation sand as claimed in claim 3 storehouse, it is characterized in that: described communicating pipe (8) is provided with valve (9).
CN2013202791060U 2013-05-21 2013-05-21 Vertical sedimentation sand silo Expired - Fee Related CN203321583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202791060U CN203321583U (en) 2013-05-21 2013-05-21 Vertical sedimentation sand silo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202791060U CN203321583U (en) 2013-05-21 2013-05-21 Vertical sedimentation sand silo

Publications (1)

Publication Number Publication Date
CN203321583U true CN203321583U (en) 2013-12-04

Family

ID=49660945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202791060U Expired - Fee Related CN203321583U (en) 2013-05-21 2013-05-21 Vertical sedimentation sand silo

Country Status (1)

Country Link
CN (1) CN203321583U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104975876A (en) * 2015-07-15 2015-10-14 飞翼股份有限公司 Vertical sand silo and application method thereof
CN106119892A (en) * 2016-08-31 2016-11-16 铜陵有色金属集团股份有限公司金冠铜业分公司 The overflow mechanism of electrolyte

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104975876A (en) * 2015-07-15 2015-10-14 飞翼股份有限公司 Vertical sand silo and application method thereof
CN106119892A (en) * 2016-08-31 2016-11-16 铜陵有色金属集团股份有限公司金冠铜业分公司 The overflow mechanism of electrolyte
CN106119892B (en) * 2016-08-31 2018-07-13 铜陵有色金属集团股份有限公司金冠铜业分公司 The overflow mechanism of electrolyte

Similar Documents

Publication Publication Date Title
CN103726570B (en) Spiral-flow type hydraulically controlled rainwater intercepting and abandoning switch well system
CN203256566U (en) Double-layer rain drainage side ditch
CN205116250U (en) Sediment removal device of reservoir among hydraulic engineering
CN201848131U (en) Table-flap type multi-stage mud-discharge settling tank applied to sewage treatment
CN203383854U (en) Buffering system for solving problem of tunnel local sudden water burst
CN203200889U (en) Intercepting rain water hole
CN203755424U (en) Spiral-flow type hydraulic control rainwater intercepting and abandoning switching well system
CN105672466A (en) Integrated rainwater sand basin device
CN201596384U (en) Farmland low-pressure pipeline forebay self-draining sand trap device
CN205804273U (en) River drain cleaning system
CN202416168U (en) Viaduct rainwater collection system
CN203321583U (en) Vertical sedimentation sand silo
CN208617679U (en) The slurry dewatering case apparatus of negative pressure can be formed immediately
CN203878648U (en) Multifunctional rainwater collecting system
CN203383853U (en) Buffering system for solving problem of insufficient drainage ability of tunnel central ditch
CN204590215U (en) The urgent flood discharge of a kind of rain flood
CN207159741U (en) A kind of composite water permeable brick
CN206063873U (en) A kind of settlement of sewage system in shield machine mining process
CN201794149U (en) Siphoning device for discharging clarified water of tailing reservoir
CN104631599A (en) Emergency rainfall flood discharge system
CN210737483U (en) Multichannel water taking and sand collecting and discharging system
CN104895019B (en) Reservoir desilting system
CN100384749C (en) Self-adjusting dry-wet alternated parallel-operation water tank system
CN206562632U (en) A kind of afforestation project water circulation system
CN203065257U (en) Automatic oxygen increasing type underflow constructed wetland

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20160521

CF01 Termination of patent right due to non-payment of annual fee