CN203284735U - Anti-blocking grouting device for cast-in-place continuous beam vertical prestressing rib metal corrugated pipe - Google Patents
Anti-blocking grouting device for cast-in-place continuous beam vertical prestressing rib metal corrugated pipe Download PDFInfo
- Publication number
- CN203284735U CN203284735U CN2013202889340U CN201320288934U CN203284735U CN 203284735 U CN203284735 U CN 203284735U CN 2013202889340 U CN2013202889340 U CN 2013202889340U CN 201320288934 U CN201320288934 U CN 201320288934U CN 203284735 U CN203284735 U CN 203284735U
- Authority
- CN
- China
- Prior art keywords
- cast
- reinforcing steel
- base plate
- continuous beam
- presstressed reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model relates to an anti-blocking grouting device for a cast-in-place continuous beam vertical prestressing rib metal corrugated pipe. The anti-blocking grouting device comprises a prestressing rib, wherein the prestressing rib penetrates in the corrugated pipe inside concrete to be cast; bolts are arranged at both ends of the prestressing rib; the lower end of the prestressing rib penetrates through an anchoring end base plate and is fixed through a nut, and the upper end of the prestressing rib penetrates through a tensioning end base plate and is fixed through a nut; a grouting hole and an exhaust hole are respectively formed in the tensioning end base plate. As the tensioning end base plate and the anchoring end base plate are arranged, the grouting hole and the exhaust hole are formed in the tensioning end base plate, one hole is used for grouting, the other hole is used for exhausting, and the functions of the two holes can be exchanged. Moreover, the cement grout pouring can be performed without auxiliary grouting by a grout presser, cement grout falls down naturally without external force, the cement grout can fall down from a plurality of holes simultaneously at a time cyclically, and the cyclic cement grout pouring can be completed within six minutes around.
Description
Technical field
The utility model relates to bridge continuous beam vertical prestressing bar construction field, particularly the anti-blocking grouting device of a kind of cast-in-situ continuous beam vertical prestressing bar metal bellows.
Background technology
In the road and bridge engineering technical field of construction, after tension of prestressed tendon is complete, need toward the interior injected water mud of bellows.The useful pneumatic mortar machine press water of traditional grouting process mud, metal bellows are in conjunction with modes such as vacuum injections, the shortcoming that these modes exist is complex process, and generally in bottom, injected hole is set, middle part arranges a plurality of steam vents, it is very high that injected hole stops up incidence, make the workload of doing over again increase, and do over again and need destroy the beam body of continuous beam, can directly have influence on quality and the safety of bridge.
Chinese patent 02156281.4 discloses the two-way slip casting construction method of a kind of vertical tube vacuum preloading and sealing filling system thereof, has namely adopted the mode of vacuum injection, and construction is comparatively complicated.
Summary of the invention
Technical problem to be solved in the utility model is to provide the anti-blocking grouting device of a kind of cast-in-situ continuous beam vertical prestressing bar metal bellows, can realize common pressure grouting, construct more for convenience, easy construction, significantly save equipment, personnel's input, improved work efficiency.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: the anti-blocking grouting device of a kind of cast-in-situ continuous beam vertical prestressing bar metal bellows, comprise presstressed reinforcing steel, described presstressed reinforcing steel penetrates and is positioned at the bellows for the treatment of pouring concrete, two ends at presstressed reinforcing steel are provided with bolt, the anchored end backing plate is passed in the lower end of presstressed reinforcing steel, and by nut, fixes;
The upper end of presstressed reinforcing steel is passed the stretching end backing plate and by nut, is fixed, and is respectively equipped with injected hole and steam vent on the stretching end backing plate.
Form sealing between described anchored end backing plate and bellows.
Described bolt and presstressed reinforcing steel are welded to connect.
The anti-blocking grouting device of a kind of cast-in-situ continuous beam vertical prestressing bar metal bellows that the utility model provides, by stretching end backing plate and the anchored end backing plate that arranges, and injected hole and steam vent be set on the stretching end backing plate, a hole is in order to slip casting, an other hole is in order to exhaust, and the function in two holes can be exchanged.And grout pouring does not need pneumatic mortar machine to assist slip casting, takes artificial to get final product, and cement paste naturally drops and need not by external force, a plurality of holes of cycling simultaneously once, and about 6 minutes, the time just can be completed the grout pouring of a circulation.The utility model has been avoided the obstruction of injected hole, has exempted because injected hole stops up and has caused the phenomenon of doing over again, and has saved the input of mud jacking equipment.The utility model is particularly useful for the construction technology of perfusion of the cement paste of cast-in-situ continuous beam vertical prestressing bar metal bellows.The utlity model has and reduce costs, accelerating construction progress, the remarkable results such as shortening construction period, raising work efficiency, workmanship is also effectively guaranteed.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is integrally-built schematic top plan view of the present utility model.
Fig. 2 is integrally-built schematic cross-section of the present utility model.
Fig. 3 is overall structure schematic diagram of the present utility model.
Fig. 4 is the local enlarged diagram at B place in Fig. 3.
Fig. 5 is the local enlarged diagram at A place in Fig. 3.
In figure: presstressed reinforcing steel 1, bellows 2, stretching end backing plate 3, anchored end backing plate 4, bolt 5, injected hole 6, steam vent 7.
The specific embodiment
In Fig. 1-5, the anti-blocking grouting device of a kind of cast-in-situ continuous beam vertical prestressing bar metal bellows, comprise presstressed reinforcing steel 1, described presstressed reinforcing steel 1 penetrates and is positioned at the bellows 2 for the treatment of pouring concrete, be provided with bolt 5 at the two ends of presstressed reinforcing steel 1, anchored end backing plate 4 is passed in the lower end of presstressed reinforcing steel 1, and by nut, fixes; Presstressed reinforcing steel 1 stretches out the certain size of stretching end backing plate 3, in order to stretch-draw.
The upper end of presstressed reinforcing steel 1 is passed stretching end backing plate 3 and by nut, is fixed, and is respectively equipped with injected hole 6 and steam vent 7 on stretching end backing plate 3.
Form sealing between described anchored end backing plate 4 and bellows 2.
Described bolt 5 is welded to connect with presstressed reinforcing steel 1.The material of described presstressed reinforcing steel is indented bars.The material of described bellows is iron sheet.The material of described stretching end backing plate and anchored end backing plate is steel plate.
Comprise the following steps during use:
At first put into bellows 2 before continuous beam concreting;
Presstressed reinforcing steel 1 passes bellows 2;
Presstressed reinforcing steel 1 and bellows 2 are connected and fixed by bolt 5 with stretching end backing plate 3 and anchored end backing plate 4, and anchored end bolt 5 welds with presstressed reinforcing steel 1;
, in two holes of corresponding brill, stretching end backing plate 3 both sides, be respectively injected hole 6 and steam vent 7.
By the past 2 li grout injections of bellows of injected hole 6;
Realize the construction of vertical prestressing bar metal bellows anti-clogging grouting device by above-mentioned steps.
The utility model is in practice through repeatedly applying and checking, and properties all meets the design standard requirement, and have and reduce costs, accelerating construction progress, the remarkable results such as shortening construction period, raising work efficiency, workmanship is also effectively guaranteed.
Claims (3)
1. anti-blocking grouting device of cast-in-situ continuous beam vertical prestressing bar metal bellows, comprise presstressed reinforcing steel (1), it is characterized in that: described presstressed reinforcing steel (1) penetrates and is positioned at the bellows (2) for the treatment of pouring concrete, be provided with bolt (5) at the two ends of presstressed reinforcing steel (1), anchored end backing plate (4) is passed in the lower end of presstressed reinforcing steel (1), and by nut, fixes;
The upper end of presstressed reinforcing steel (1) is passed stretching end backing plate (3) and by nut, is fixed, and is respectively equipped with injected hole (6) and steam vent (7) on stretching end backing plate (3).
2. the anti-blocking grouting device of a kind of cast-in-situ continuous beam vertical prestressing bar metal bellows according to claim 1, is characterized in that: form sealing between described anchored end backing plate (4) and bellows (2).
3. the anti-blocking grouting device of a kind of cast-in-situ continuous beam vertical prestressing bar metal bellows according to claim 1 is characterized in that: described bolt (5) is welded to connect with presstressed reinforcing steel (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202889340U CN203284735U (en) | 2013-05-24 | 2013-05-24 | Anti-blocking grouting device for cast-in-place continuous beam vertical prestressing rib metal corrugated pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202889340U CN203284735U (en) | 2013-05-24 | 2013-05-24 | Anti-blocking grouting device for cast-in-place continuous beam vertical prestressing rib metal corrugated pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203284735U true CN203284735U (en) | 2013-11-13 |
Family
ID=49541107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202889340U Expired - Fee Related CN203284735U (en) | 2013-05-24 | 2013-05-24 | Anti-blocking grouting device for cast-in-place continuous beam vertical prestressing rib metal corrugated pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203284735U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735485A (en) * | 2014-12-12 | 2016-07-06 | 山东大学 | Anchoring device and method for reinforced concrete wall attachment equipment |
CN106049294A (en) * | 2016-08-03 | 2016-10-26 | 北京中铁建北方路桥工程有限公司 | Segmental assembling beam prestressed duct connector |
CN108360381A (en) * | 2018-02-10 | 2018-08-03 | 北京工业大学 | No. 0 block web mass concrete heat sink of Continuous Concrete Box Girders |
CN111926703A (en) * | 2020-08-25 | 2020-11-13 | 浙锚科技股份有限公司 | High-strength prestressed reinforcement anchoring system and construction method thereof |
CN113309284A (en) * | 2021-04-25 | 2021-08-27 | 广州地铁设计研究院股份有限公司 | High-tolerance multi-combination suspension connecting node and implementation method |
-
2013
- 2013-05-24 CN CN2013202889340U patent/CN203284735U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735485A (en) * | 2014-12-12 | 2016-07-06 | 山东大学 | Anchoring device and method for reinforced concrete wall attachment equipment |
CN106049294A (en) * | 2016-08-03 | 2016-10-26 | 北京中铁建北方路桥工程有限公司 | Segmental assembling beam prestressed duct connector |
CN106049294B (en) * | 2016-08-03 | 2018-02-06 | 中国铁路总公司 | The girder pre-stressed duct connector of section assembling |
CN108360381A (en) * | 2018-02-10 | 2018-08-03 | 北京工业大学 | No. 0 block web mass concrete heat sink of Continuous Concrete Box Girders |
CN111926703A (en) * | 2020-08-25 | 2020-11-13 | 浙锚科技股份有限公司 | High-strength prestressed reinforcement anchoring system and construction method thereof |
CN113309284A (en) * | 2021-04-25 | 2021-08-27 | 广州地铁设计研究院股份有限公司 | High-tolerance multi-combination suspension connecting node and implementation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203284735U (en) | Anti-blocking grouting device for cast-in-place continuous beam vertical prestressing rib metal corrugated pipe | |
CN206737141U (en) | A kind of bolt connection assembled integral node | |
CN203113627U (en) | Nodular cast iron grout sleeve for connecting longitudinal steel bars | |
WO2017211329A2 (en) | Semi-prefabricated concrete-filled steel tubular column having inner high-strength steel, and fabrication method for same | |
CN206941858U (en) | Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework | |
CN105484514A (en) | Method for strengthening circular reinforced concrete pier column | |
CN102234982A (en) | Circular pier capping beam supporting device | |
CN202937005U (en) | Cast-in-situ concrete beam lateral template reinforcement device | |
CN106498847B (en) | A kind of connection structure and connection method of prefabricated bent cap and prefabricated stand column | |
CN206570955U (en) | A kind of prefabricated post single hole provisions for grouting | |
CN212002238U (en) | Unilateral formwork construction equipment of basement outer wall | |
CN207260142U (en) | A kind of prestress anchorage cable is from anchor device | |
CN201751461U (en) | Bracket for constructing high pier capping beam | |
CN220433439U (en) | Splicing device for splicing wide prefabricated T-beam bridge | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN202644531U (en) | Pressure-preloading pile sealing device for static pressure pile of anchor rod | |
CN202850017U (en) | Modified type prestress high-strength concrete hollow square pile | |
CN105569368A (en) | Annular steel plate strengthening device for reinforced concrete column with circular cross section | |
CN203414351U (en) | Prestrain reinforced experimental device | |
CN103243691A (en) | Prefabricated steel formwork for gallery top arch of dam absorption basin | |
CN202881986U (en) | Single-pile vertical static test pile head steel bar connection node | |
CN206800200U (en) | A kind of pier stud capping beam template support meanss | |
CN206418817U (en) | A kind of assembled arch steel machining shed | |
CN210551984U (en) | Building column beam concrete prefabricated formwork | |
CN211228413U (en) | Assembled steel section of jurisdiction template suitable for quick lining cutting of horseshoe tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131113 Termination date: 20190524 |
|
CF01 | Termination of patent right due to non-payment of annual fee |