CN201751461U - Bracket for constructing high pier capping beam - Google Patents

Bracket for constructing high pier capping beam Download PDF

Info

Publication number
CN201751461U
CN201751461U CN2010202647437U CN201020264743U CN201751461U CN 201751461 U CN201751461 U CN 201751461U CN 2010202647437 U CN2010202647437 U CN 2010202647437U CN 201020264743 U CN201020264743 U CN 201020264743U CN 201751461 U CN201751461 U CN 201751461U
Authority
CN
China
Prior art keywords
truss
trusses
bracket
capping beam
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202647437U
Other languages
Chinese (zh)
Inventor
孙皞
张志良
李义飞
张刚洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Beijing Railway Construction Co of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN2010202647437U priority Critical patent/CN201751461U/en
Application granted granted Critical
Publication of CN201751461U publication Critical patent/CN201751461U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model provides a bracket for constructing a high pier capping beam. The bracket has the key improvement that the bracket comprises two trusses which are symmetrically arranged at the two sides of a pier body, wherein a plurality of tie bars are penetrated between two counter pulling plates which are arranged at the top of the trusses; and the vertical section of each truss is in the shape of right angled triangle, the cross section of each truss is in the shape of rectangle, and one end of a lower chord rod of each truss which corresponds to the pier body is fixedly provided with a corbel. The bracket has the advantages that the corbels which are arranged at the ends of the lower chord rods of the trusses are inserted into a plurality of holes which are remained on the pier body and are specially treated, the tie bars which are penetrated between the two counter pulling plates arranged at the top of the trusses are used for fixing the trusses at the top of the high pier, and the top surfaces of the trusses can be directly erected with a capping beam constructing template and can be cast with capping beam concrete, thereby eliminating the working procedures of treating the foundation and testing the pressure and the like when constructing with a full framing method, and effectively improving the construction efficiency, and a mass of revolving materials does not need to be rented since the full framing constructing method is not used, thereby being capable of reducing the construction cost of the engineering to a certain degree.

Description

A kind of carriage that is used for high pier capping beam construction
Technical field
The utility model has related to the auxiliary equipment in a kind of high pier capping beam construction, particularly a kind of carriage that is used for high pier capping beam construction.
Background technology
In recent years, along with the high speed development of Chinese national economy, high-grade highway construction presents the situation of advancing by leaps and bounds, to mountain area, marine site development.Mountainous area highway passes through the valley, the bridge pier column height, and material, equipment transportation difficulty, seeking technical constructure scheme safe and reliable, with low cost economically is the problem that the mountainous area highway high pier is built.The highway bridge substructure is a lot of to adopt single many cylinder piers to add the bent cap pattern, adopts the construction of full framing method usually, need conscientiously handle the support ground before setting up the bent cap cast-in-place support, prevents that ground from producing excessive settlement influence bent cap concrete quality and linear.But to tall pier and thin wall, adopt the construction of full framing method, the timbering material consumption is big, and it is many to set up the time spent, and deformation allowance is wayward, need adopt other working measures when meeting river embankment, and efficiency of construction is low, and the waste of turnover material is bigger.
The utility model content
The utility model provides a kind of can improve high pier capping beam efficiency of construction, reduces the carriage that is used for high pier capping beam construction of turnover material use amount.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is: a kind of carriage that is used for the construction of high pier capping beam, its key improvements is: comprise the truss that is symmetrically set in the pier shaft both sides, truss top, both sides be provided with to wearing lacing wire between the arm-tie; The longitudinal section of described truss is a right-angled triangle, and the cross section is a rectangle, and an end of the corresponding pier shaft of the lower chord of truss is installed with bracket.
Adopt the beneficial effect that technique scheme produced to be: the bracket that truss lower chord end is provided with inserts in the process hole of reserving on the pier shaft of specially treated, what truss top, both sides was provided with is fixed on the Gao Dun top to the multiply lacing wire is set between the arm-tie with truss, directly can on the truss end face, install the bent cap construction formwork then and build the bent cap concrete, operations such as ground processing when removing the construction of use full framing method from and pressure testing, effectively improve efficiency of construction, more in addition, do not use full framing, just need not lease a large amount of turnover material, so, can reduce the engineering construction cost to a certain extent.
Description of drawings
Fig. 1 is the utility model user mode schematic diagram;
Fig. 2 is single trussed construction schematic diagram;
Fig. 3 is the vertical view of Fig. 2;
Fig. 4 is the right view of Fig. 2;
1, pier shaft; 2, truss; 2-1, upper chord; 2-2, web member; 2-3, to arm-tie; 2-4, vertical support bar; 2-5, lower chord; 2-6, diagonal member; 2-7, bracket; 3, lacing wire.
Further the utility model is described in detail below in conjunction with accompanying drawing.
The specific embodiment
For making above-mentioned purpose of the present utility model, feature and beneficial effect can become apparent more, below in conjunction with the drawings and specific embodiments among the utility model embodiment, the technical scheme among the utility model embodiment are clearly and completely described.
As Fig. 2, Fig. 3, a kind of carriage that is used for high pier capping beam construction shown in Figure 4, it is characterized in that: comprise the truss 2 that is symmetrically set in pier shaft 1 both sides, both sides truss 2 tops be provided with to wearing lacing wire 3 between the arm-tie 2-3; The longitudinal section of described truss 2 is a right-angled triangle, and the cross section is a rectangle, and an end of the corresponding pier shaft of the lower chord of truss 2 is installed with bracket 2-7.
Described truss comprises wind up layer, stern layer and lower edge layer, the described layer that winds up is rectangular frame, the lower edge layer comprises two lower chord 2-5 and the connecting rod that is connected lower chord 2-5, and described stern layer comprises connection upper chord 2-1 and the vertical support bar 2-4 of lower chord 2-5 and the web member 2-2 at diagonal member 2-6 and middle part.Upper chord 2-1 wherein and lower chord 2-5 adopt i iron, vertical support bar 2-4 and diagonal member 2-6 adopt channel-section steel, web member 2-2 and other connecting rods adopt angle steel, bracket 2-7 adopts the channel-section steel make-up to be welded into box, bracket 2-7 is welded on the lower chord end, and the concrete size of rod member can design according to the practice of construction situation, also can unconventional type design, use the reduction engineering cost to realize turnover.
In concrete application process, at first, reserve square hole in predetermined pier shaft position in the time of pier construction, concrete around the square hole adopts steel mesh reinforcement to strengthen, and hole lining steel plate, steel plate can be welded on the pier shaft cage of reinforcement, when treating that the pier shaft concrete strength reaches designing requirement, respectively the both sides truss is lifted the pier shaft correspondence position with crane, bracket penetrates in the preformed hole on the corresponding pier shaft, wear lacing wire simultaneously, on the truss end face, install the bent cap template then, and build the bent cap concrete according to designing requirement, at last, treat that the bent cap concrete strength reaches designing requirement, i.e. collapsible die, the process of form removal is opposite with installation process.The carriage that the related high pier capping beam of the utility model uses in constructing is not only applicable to the construction of the high pier capping beam of geological condition complex area, can be applied in general bent cap construction and the construction of railway operation line yet, can effectively improve efficiency of construction.

Claims (2)

1. carriage that is used for the construction of high pier capping beam is characterized in that: comprise the truss (2) that is symmetrically set in pier shaft (1) both sides, both sides truss (2) top be provided with to wearing lacing wire (3) between the arm-tie (2-3); The longitudinal section of described truss (2) is a right-angled triangle, and the truss cross section is a rectangle, and an end of the corresponding pier shaft of the lower chord of truss (2) is installed with bracket (2-7).
2. a kind of carriage that is applied in the high pier capping beam construction according to claim 1, it is characterized in that: described truss comprises wind up layer, stern layer and lower edge layer, the described layer that winds up is rectangular frame, the lower edge layer comprises two lower chords (2-5) and the connecting rod that is connected lower chord (2-5), and described stern layer comprises connection upper chord (2-1) and the vertical support bar (2-4) of lower chord (2-5) and the web member (2-2) at diagonal member (2-6) and middle part.
CN2010202647437U 2010-07-21 2010-07-21 Bracket for constructing high pier capping beam Expired - Lifetime CN201751461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202647437U CN201751461U (en) 2010-07-21 2010-07-21 Bracket for constructing high pier capping beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202647437U CN201751461U (en) 2010-07-21 2010-07-21 Bracket for constructing high pier capping beam

Publications (1)

Publication Number Publication Date
CN201751461U true CN201751461U (en) 2011-02-23

Family

ID=43601868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202647437U Expired - Lifetime CN201751461U (en) 2010-07-21 2010-07-21 Bracket for constructing high pier capping beam

Country Status (1)

Country Link
CN (1) CN201751461U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535339A (en) * 2011-12-07 2012-07-04 中铁十九局集团第七工程有限公司 Bracket for thin-wall hollow high-pier cantilever perfusing continuous beam and constructing method thereof
CN102747687A (en) * 2012-07-09 2012-10-24 江苏省交通工程集团有限公司 Non-floor type bracket bearing shear pin and construction method thereof
CN102877414A (en) * 2012-09-28 2013-01-16 中铁四局集团第一工程有限公司 Universal triangular basket and bracket mounting structure and construction method thereof
CN103290783A (en) * 2013-06-02 2013-09-11 福建省华航建设工程有限公司 Bridge upright supporting bracket
CN107165039A (en) * 2017-05-31 2017-09-15 广西路建工程集团有限公司 Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535339A (en) * 2011-12-07 2012-07-04 中铁十九局集团第七工程有限公司 Bracket for thin-wall hollow high-pier cantilever perfusing continuous beam and constructing method thereof
CN102747687A (en) * 2012-07-09 2012-10-24 江苏省交通工程集团有限公司 Non-floor type bracket bearing shear pin and construction method thereof
CN102747687B (en) * 2012-07-09 2015-02-18 江苏省交通工程集团有限公司 Non-floor type bracket bearing shear pin and construction method thereof
CN102877414A (en) * 2012-09-28 2013-01-16 中铁四局集团第一工程有限公司 Universal triangular basket and bracket mounting structure and construction method thereof
CN102877414B (en) * 2012-09-28 2015-02-18 中铁四局集团第一工程有限公司 Universal triangular basket and bracket mounting structure and construction method thereof
CN103290783A (en) * 2013-06-02 2013-09-11 福建省华航建设工程有限公司 Bridge upright supporting bracket
CN107165039A (en) * 2017-05-31 2017-09-15 广西路建工程集团有限公司 Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method

Similar Documents

Publication Publication Date Title
CN101994293B (en) High pier coping construction method
CN103074941B (en) Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end
CN108049633A (en) A kind of precast concrete concrete frame joint construction method
CN106869321A (en) The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN201751461U (en) Bracket for constructing high pier capping beam
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN102505696A (en) Support system of rear support removing type section steel-concrete double-enclosing-purlin foundation pit and construction method
CN206308801U (en) Steel tube binding type steel regeneration concrete post and reinforced beam end plate connecting node
CN206941858U (en) Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN105133731B (en) A kind of assembled steel performance
CN107419810A (en) A kind of rectangular steel-tube concrete column and beam and slab type superstructure attachment means and its construction technology
CN201756799U (en) Large mold plate for rollover construction of hollow thin-wall high piers
CN201209291Y (en) Steel board reinforced concrete special-shaped pillar
CN206143645U (en) Stride across navigable river ultra -large -span girder steel assembling support
CN110206020B (en) Prefabricated snowflake type concrete steel sheet pile and construction method thereof
CN101761187A (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN206942196U (en) The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework
CN201016157Y (en) Steel-mixing composite box beam
CN206722094U (en) A kind of rectangular steel-tube concrete column and beam and slab type superstructure attachment means
CN205576872U (en) Tower water inlet structure of power station bank convenient to construction
CN202865731U (en) Saddle weight steel box structure of steel truss cable-stayed bridge
CN201695694U (en) Differently-labeled concrete construction separating device in the same vertical structure of reinforced concrete wall
CN205348833U (en) Shear force wall and girder steel combination system of underpining of shearing and bearing
CN203007973U (en) Combined type tower crane foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110223

CX01 Expiry of patent term