CN206737141U - A kind of bolt connection assembled integral node - Google Patents
A kind of bolt connection assembled integral node Download PDFInfo
- Publication number
- CN206737141U CN206737141U CN201720398432.1U CN201720398432U CN206737141U CN 206737141 U CN206737141 U CN 206737141U CN 201720398432 U CN201720398432 U CN 201720398432U CN 206737141 U CN206737141 U CN 206737141U
- Authority
- CN
- China
- Prior art keywords
- precast concrete
- prefabricated post
- cast
- concrete beam
- node area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model provides a kind of bolt connection assembled integral node, including the first precast concrete beam, the second precast concrete beam, upper prefabricated post, lower prefabricated post, prefabricated board, precast beam overlapping layers, bolt joint, cast-in-place node area, precast concrete beam is located at cast-in-place node area left and right ends, prefabricated post is located at cast-in-place node area upper and lower ends, prefabricated board is located at precast concrete beam upper end, and precast beam overlapping layers is located at prefabricated board upper end;Upper and lower prefabricated post is connected by bolt joint, bolt joint includes base, side plate, longitudinal reinforcement, bent-up bar, connection reinforcing bar, nut, side plate is welded in around base, welded in cast-in-place node area with side plate inside upper part longitudinal reinforcement lower end, bent-up bar is welded in side plate outer lower portion, connection reinforcing bar stretches out from lower prefabricated post upper end, is fixed with base by nut.The utility model construction is convenient, quality controllable, the on-site consolidation time is short, and stress is reliable.
Description
Technical field
It the utility model is related to building structure field, more particularly to a kind of bolt connection assembled integral node.
Background technology
Precast concrete framework has situ wet operation is few, component quality is good, save template and support, environmental pollution is small etc.
Advantage, and the overall performance of Precast Concrete Frame is largely dependent upon the quality of its joint behavior;At present, it is prefabricated
Concrete frame center pillar is indulged muscle and connected frequently with modes such as sleeve grouting connection, slurry anchor overlap joint connection and bolt connections, and sleeve fills
Slurry connection, slurry anchor overlap joint connection construction process requirements are strict, quality is unmanageable and is not easy to detect, existing bolt connection structure letter
It is single, but convenience is general, and joints performance is difficult to reach requirement.
Utility model content
In order to solve the above problems, the utility model provides a kind of to be linked and packed monoblock type section with Novel bolt system
Point.
Technical scheme provided by the utility model is:A kind of bolt connection assembled integral node, including first is prefabricated
Beams of concrete 1, the second precast concrete beam 2, upper prefabricated post 3, lower prefabricated post 4, prefabricated board 5, precast beam overlapping layers 6, bolt section
Point 7, cast-in-place node area 8;First precast concrete beam 1 is located at the left end of cast-in-place node area 8, the second precast concrete beam 2
In the right-hand member of cast-in-place node area 8, upper prefabricated post 3 is located at the upper end of cast-in-place node area 8, and lower prefabricated post 4 is located at the lower end of cast-in-place node area 8,
Prefabricated board 5 is located at the first precast concrete beam 1, the upper end of the second precast concrete beam 2, and precast beam overlapping layers 6 is located on prefabricated board 5
End;Connected between the upper prefabricated post 3 and lower prefabricated post 4 by bolt joint 7.
The bolt joint 7 includes base 9, side plate 10, longitudinal reinforcement 11, bent-up bar 12, connection reinforcing bar 13, nut
14, circular hole is provided among the base 9, for connecting reinforcing bar 13 by the way that the top of connection reinforcing bar 13 is formed with screw thread, the side
Plate 10 is welded in around base 9, the longitudinal reinforcement 11, bent-up bar 12 and the upper integral preform of prefabricated post 3, under longitudinal reinforcement 11
End is stretched out upper prefabricated post 3 and welded in cast-in-place node area 8 with the inside upper part of side plate 10, and bent-up bar 12 is welded in the outside of side plate 10
Bottom, the connection reinforcing bar 13 and the lower integral preform of prefabricated post 4, connection reinforcing bar 13 stretch out cast-in-place node from the lower upper end of prefabricated post 4
Area 8, and 9 middle circular hole of base is passed through, fixed with base 9 by nut 14.
Bar-mat reinforcement is provided with the precast concrete beam 2 of first precast concrete beam 1 and second, stretches out beam bottom in bar-mat reinforcement
Vertical muscle 15 passes through straight screw sleeve connection in cast-in-place node area 8.
First precast concrete beam 1, the second precast concrete beam 2, the surface of prefabricated board 5 contact with cast-in-place concrete
Part has carried out wharf's pavement quality.
First precast concrete beam 1, the second precast concrete beam 2, upper prefabricated post 3, the end set of lower prefabricated post 4
Shearing groove.
The beneficial effect that the utility model reaches:The utility model construction is convenient, quality controllable, the on-site consolidation time is short,
And stress is reliable.
Brief description of the drawings
Accompanying drawing described herein is to be further understood for providing to of the present utility model, forms one of the application
Point, but do not form to restriction of the present utility model.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the bolt joint schematic diagram;
Fig. 3 is the bottom plate, top plate, longitudinal reinforcement and bent-up bar connection diagram;
Fig. 4 is the connection reinforcing bar and nut connection diagram.
Wherein, 1 is the first precast concrete beam, and 2 be the second precast concrete beam, and 3 be upper prefabricated post, and 4 be lower prefabricated post,
5 be prefabricated board, and 6 be precast beam overlapping layers, and 7 be bolt joint, and 8 be cast-in-place node area, and 9 be base, and 10 be side plate, and 11 be longitudinal direction
Reinforcing bar, 12 be bent-up bar, and 13 be connection reinforcing bar, and 14 be nut, and 15 be that muscle is indulged at beam bottom.
Embodiment
In order to which the utility model is described in further detail, it is as follows that its embodiment is now disclosed.
According to Fig. 1, Fig. 2, Fig. 3, Fig. 4, in specific implementation, a kind of bolt connection assembled integral node, including first is pre-
Beams of concrete 1 processed, the second precast concrete beam 2, upper prefabricated post 3, lower prefabricated post 4, prefabricated board 5, precast beam overlapping layers 6, bolt
Node 7, cast-in-place node area 8;First precast concrete beam 1 is located at the left end of cast-in-place node area 8, the second precast concrete beam 2
Positioned at the right-hand member of cast-in-place node area 8, upper prefabricated post 3 is located at the upper end of cast-in-place node area 8, and lower prefabricated post 4 is located under cast-in-place node area 8
End, prefabricated board 5 are located at the first precast concrete beam 1, the upper end of the second precast concrete beam 2, and precast beam overlapping layers 6 is located at prefabricated board
5 upper ends;Connected between the upper prefabricated post 3 and lower prefabricated post 4 by bolt joint 7.
The bolt joint 7 includes base 9, side plate 10, longitudinal reinforcement 11, bent-up bar 12, connection reinforcing bar 13, nut
14, circular hole is provided among the base 9, for connecting reinforcing bar 13 by the way that the top of connection reinforcing bar 13 is formed with screw thread, the side
Plate 10 is welded in around base 9, the longitudinal reinforcement 11, bent-up bar 12 and the upper integral preform of prefabricated post 3, under longitudinal reinforcement 11
End is stretched out upper prefabricated post 3 and welded in cast-in-place node area 8 with the inside upper part of side plate 10, and bent-up bar 12 is welded in the outside of side plate 10
Bottom, the connection reinforcing bar 13 and the lower integral preform of prefabricated post 4, connection reinforcing bar 13 stretch out cast-in-place node from the lower upper end of prefabricated post 4
Area 8, and 9 middle circular hole of base is passed through, fixed with base 9 by nut 14.
In specific implementation, bar-mat reinforcement, reinforcing bar are provided with the precast concrete beam 2 of the first precast concrete beam 1 and second
The vertical muscle 15 in beam bottom is stretched out in net and passes through straight screw sleeve connection in cast-in-place node area 8.
In specific implementation, first precast concrete beam 1, the second precast concrete beam 2, the surface of prefabricated board 5 are with showing
Pouring concrete contact portion has carried out wharf's pavement quality.
In specific implementation, first precast concrete beam 1, the second precast concrete beam 2, upper prefabricated post 3, lower prefabricated post
4 end set shearing groove.
In specific implementation, during bolt joint component assembly, upper prefabricated post 3 is first placed in the nut and pad of advance leveling
On, then prefabricated post is tightened together with being embedded in the connection reinforcing bar 13 of understructure by the nut and pad to match,
And high-strength grout is irrigated at the seam and bolt indentation between prefabricated post and bottom member.
In specific implementation, the Novel bolt system be linked and packed monoblock type node construction order be:1. precast beam and prefabricated
Lower prop is in place, and precast beam end-rack sets support, and prefabricated board is shelved on precast beam on request;2. poured after colligation joint cores and
Reinforcing bar after beam slab in pouring concrete;Part concreting is poured after joint cores and beam slab are poured after 3.;4. on hoisting prefabricated
Post, preliminary connection is formed by Novel bolt system;5. to seam and bolt indentation between upper strata prefabricated post and bottom member
It is in the milk at place.
Claims (4)
1. a kind of bolt connection assembled integral node, including the first precast concrete beam (1), the second precast concrete beam (2),
Upper prefabricated post (3), lower prefabricated post (4), prefabricated board (5), precast beam overlapping layers (6), cast-in-place node area (8), it is characterised in that:Also
Including bolt joint (7), first precast concrete beam (1) is located at cast-in-place node area (8) left end, the second precast concrete beam
(2) it is located at cast-in-place node area (8) right-hand member, upper prefabricated post (3) is located at cast-in-place node area (8) upper end, and lower prefabricated post (4) is positioned at cast-in-place
Node area (8) lower end, prefabricated board (5) are located at the first precast concrete beam (1), the second precast concrete beam (2) upper end, precast beam
Overlapping layers (6) is located at prefabricated board (5) upper end, between the upper prefabricated post (3) and lower prefabricated post (4) by bolt joint (7) even
Connect;
The bolt joint (7) includes base (9), side plate (10), longitudinal reinforcement (11), bent-up bar (12), connection reinforcing bar
(13), nut (14), the base (9) is middle to be provided with circular hole, and screw thread, the side plate are formed with the top of the connection reinforcing bar (13)
(10) it is welded in around base (9), the longitudinal reinforcement (11), bent-up bar (12) and upper prefabricated post (4) integral preform, longitudinal direction
Reinforcing bar (11) lower end is stretched out upper prefabricated post (4) and welded in cast-in-place node area (8) with side plate (10) inside upper part, bent-up bar
(12) side plate (10) outer lower portion, the connection reinforcing bar (13) and lower prefabricated post (4) integral preform, connection reinforcing bar (13) are welded in
Cast-in-place node area (8) are stretched out from lower prefabricated post (4) upper end, and through circular hole among base (9), pass through nut with base (9)
(14) it is fixed.
2. assembled integral node according to claim 1, it is characterised in that:First precast concrete beam (1) and the
Bar-mat reinforcement is provided with two precast concrete beams (2), the vertical muscle (15) in beam bottom is stretched out in bar-mat reinforcement and passes through steel in cast-in-place node area (8)
Muscle sleeve connection.
3. assembled integral node according to claim 1, it is characterised in that:First precast concrete beam (1), second
Precast concrete beam (2), the surface of prefabricated board (5) and cast-in-place concrete contact portion have carried out wharf's pavement quality.
4. assembled integral node according to claim 1, it is characterised in that:First precast concrete beam (1), second
Precast concrete beam (2), upper prefabricated post (3), the end set of lower prefabricated post (4) shearing groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720398432.1U CN206737141U (en) | 2017-04-14 | 2017-04-14 | A kind of bolt connection assembled integral node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720398432.1U CN206737141U (en) | 2017-04-14 | 2017-04-14 | A kind of bolt connection assembled integral node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206737141U true CN206737141U (en) | 2017-12-12 |
Family
ID=60561024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720398432.1U Expired - Fee Related CN206737141U (en) | 2017-04-14 | 2017-04-14 | A kind of bolt connection assembled integral node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206737141U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222280A (en) * | 2017-12-29 | 2018-06-29 | 中国十七冶集团有限公司 | A kind of assembly concrete component dry connecting device |
CN108265824A (en) * | 2018-01-24 | 2018-07-10 | 西安建筑科技大学 | A kind of high ductility concrete beam and column node of assembled and connection method |
CN109113171A (en) * | 2018-09-06 | 2019-01-01 | 同济大学 | A kind of Novel bolt connection Precast Concrete Frame |
CN109403458A (en) * | 2018-12-18 | 2019-03-01 | 有利华建材(惠州)有限公司 | Novel pre-fabricated one |
CN110195471A (en) * | 2019-05-20 | 2019-09-03 | 扬州大学 | The combination assembled frame joint of modularization steel-concrete |
CN110593486A (en) * | 2019-09-25 | 2019-12-20 | 中国电力工程顾问集团中南电力设计院有限公司 | Assembled concrete column node connection structure |
CN110984474A (en) * | 2019-06-28 | 2020-04-10 | 王海崴 | Straight groove-shaped component connected by assembly type construction steel bars |
CN111608268A (en) * | 2020-06-10 | 2020-09-01 | 武金峰 | Steel construction assembled beam column tie point structure |
CN113006272A (en) * | 2021-02-01 | 2021-06-22 | 中建科技集团有限公司 | Assembly type prestressed concrete frame system and construction method |
CN117166611A (en) * | 2023-11-03 | 2023-12-05 | 享城科建(北京)科技发展有限公司 | Column bottom connection system and prefabricated column |
-
2017
- 2017-04-14 CN CN201720398432.1U patent/CN206737141U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222280A (en) * | 2017-12-29 | 2018-06-29 | 中国十七冶集团有限公司 | A kind of assembly concrete component dry connecting device |
CN108222280B (en) * | 2017-12-29 | 2020-03-20 | 中国十七冶集团有限公司 | Assembled concrete member dry-type connecting device |
CN108265824A (en) * | 2018-01-24 | 2018-07-10 | 西安建筑科技大学 | A kind of high ductility concrete beam and column node of assembled and connection method |
CN109113171A (en) * | 2018-09-06 | 2019-01-01 | 同济大学 | A kind of Novel bolt connection Precast Concrete Frame |
CN109403458A (en) * | 2018-12-18 | 2019-03-01 | 有利华建材(惠州)有限公司 | Novel pre-fabricated one |
CN110195471A (en) * | 2019-05-20 | 2019-09-03 | 扬州大学 | The combination assembled frame joint of modularization steel-concrete |
CN110984474A (en) * | 2019-06-28 | 2020-04-10 | 王海崴 | Straight groove-shaped component connected by assembly type construction steel bars |
CN110593486A (en) * | 2019-09-25 | 2019-12-20 | 中国电力工程顾问集团中南电力设计院有限公司 | Assembled concrete column node connection structure |
CN111608268A (en) * | 2020-06-10 | 2020-09-01 | 武金峰 | Steel construction assembled beam column tie point structure |
CN113006272A (en) * | 2021-02-01 | 2021-06-22 | 中建科技集团有限公司 | Assembly type prestressed concrete frame system and construction method |
CN117166611A (en) * | 2023-11-03 | 2023-12-05 | 享城科建(北京)科技发展有限公司 | Column bottom connection system and prefabricated column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206737141U (en) | A kind of bolt connection assembled integral node | |
CN107165272A (en) | Prestressing force assembly concrete frame joint attachment structure and its construction method | |
CN207194146U (en) | Prestressing force assembly concrete frame joint attachment structure | |
CN105064511A (en) | Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof | |
CN206941858U (en) | Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework | |
CN105040829A (en) | Prefabricated concrete main beam and secondary beam connecting structure and construction method thereof | |
CN102979221A (en) | Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure | |
CN202990170U (en) | Shear wall structure collocating cross oblique internal prestress | |
CN108265824A (en) | A kind of high ductility concrete beam and column node of assembled and connection method | |
CN104929278A (en) | Assembly type dense column hollow shear wall structure | |
CN105275087B (en) | The attachment structure of prefabricated assembled concrete beam column | |
CN107338864A (en) | A kind of prefabricated reinforced concrete frame structure node | |
CN105649248B (en) | Prefabricated PC concrete core slab and Cast-in-situ Beam integral construction method | |
CN106498847B (en) | A kind of connection structure and connection method of prefabricated bent cap and prefabricated stand column | |
CN205531016U (en) | Precast concrete post component and connected node | |
CN205630974U (en) | Pre -tensioning system precast beam pedestal | |
CN106958319A (en) | Precast concrete post component and connected node | |
CN106759873A (en) | A kind of new prefabricated integral frame structure prefabricated post is constructed with prefabricated beam connecting node | |
CN208121795U (en) | A kind of connection structure of overhead transmission line PHC pipe pile foundation foundation pile and cushion cap | |
CN103938871A (en) | Method for constructing concrete-filled steel tube column and bonded prestressed frame beam structure adopting reinforced concrete ring beam joints | |
CN101392558B (en) | Steel column free type steel beam joint construction process | |
CN107142834B (en) | A kind of Through Steel pipe concrete tie-rod arch bridge abutment steel pipe location structure and its construction method | |
CN206873663U (en) | The low damage slab-wall structure of full prefabricated PC | |
CN105951986B (en) | A kind of the mid-side node connection structure and its method of prefabricated integral frame column beam | |
CN205024584U (en) | Pre -stressed reinforcement's segmentation anchor structure in case roof beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171212 Termination date: 20180414 |
|
CF01 | Termination of patent right due to non-payment of annual fee |