CN101392558B - Steel column free type steel beam joint construction process - Google Patents

Steel column free type steel beam joint construction process Download PDF

Info

Publication number
CN101392558B
CN101392558B CN2008100794180A CN200810079418A CN101392558B CN 101392558 B CN101392558 B CN 101392558B CN 2008100794180 A CN2008100794180 A CN 2008100794180A CN 200810079418 A CN200810079418 A CN 200810079418A CN 101392558 B CN101392558 B CN 101392558B
Authority
CN
China
Prior art keywords
steel beam
section steel
steel
muscle
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100794180A
Other languages
Chinese (zh)
Other versions
CN101392558A (en
Inventor
刘玉
王惠荣
周耀亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taihang Construction Development Co Ltd
Original Assignee
Shanxi Taihang Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taihang Construction Development Co Ltd filed Critical Shanxi Taihang Construction Development Co Ltd
Priority to CN2008100794180A priority Critical patent/CN101392558B/en
Publication of CN101392558A publication Critical patent/CN101392558A/en
Application granted granted Critical
Publication of CN101392558B publication Critical patent/CN101392558B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a building construction method, in particular to a non-steel-column type steel beam connection construction process, which solves the problem of the connection between a steel beam and a concrete structural column during the construction. The process comprises the following steps of: firstly, fabricating the steel beam and placing a template of the steel beam between concrete columns; secondly, hoisting the steel beam, putting the steel beam on the template, installing stirrups around a concrete column tendon above the steel beam, welding the stirrups with the tendon; thirdly, installing waist ribs, installing steel beam stirrups around the steel beam, installing beam penetrating steel bars which pass through the upper and lower web plates of the steel beam and are connected with the steel bars on the middle part of the concrete column through nut sleeves, installing stirrups around the concrete column steel bars on the side of the steel beam; fourthly, applying hooks onto the stirrups; and finally, erecting the template around the steel beam for pouring concrete. The construction process solves the problem of the connection between the reinforced concrete column and the steel beam without a steel column.

Description

Steel column free type steel beam joint construction process
Technical field
The present invention relates to a kind of construction techniques, be specially a kind of steel column free type steel beam joint construction process.
Background technology
In present high-building construction, the connected mode of existing post and section steel beam is to be connected with the welding of the steel column in the shaped steel beam and column or with high-strength bolt, and it is as a whole that the shaped steel beam and column is connected.But when running into special designing requirement, for example the second layer at main building is designed to conversion coating, and for frame props up structure, some of beams are steel reinforced concrete structure, and its frame-supporting column requires to be reinforced concrete post, design mode steel column not in the post.So just can't still must finish this construction task again, and safety also to reach the effect that is connected with section steel beam with the post that has used shaped steel according to existing technology construction.
Summary of the invention
The present invention is for the problem that is connected that solves section steel beam and concrete structure column under construction and a kind of steel column free type steel beam joint construction process is provided.
The present invention is realized by following technical scheme, a kind of steel column free type steel beam joint construction process, may further comprise the steps: at first make section steel beam, on section steel beam, bore the split bolt hole of reinforcing template, manufacture the straight thread silk head of the reinforcing bar upper end of passing the section steel beam frange plate at concrete column middle part then, between concrete column, install the template of section steel beam, mount type girder steel steel supports ironware on template, muscle at the bottom of the mount type girder steel again, some vertical rods are adopted in the template below, divide two rows to support, the vertical pole ' s span in the row guarantees to be no more than 50 centimeters to satisfy the weight of girder steel.
Secondly, the type lifting girder steel is placed on section steel beam on the template, the end muscle of other section steel beam that other and this section steel beam intersect is installed, wherein 50% end muscle passes section steel beam, other 50% end muscle are welded on the section steel beam, install the beam steel of wearing of the frange plate up and down that passes section steel beam additional in the position of concrete column upper end, the reinforcing bar of wearing beam steel and concrete column middle part is connected by ut socket, concrete column tendon on section steel beam top installs stirrup additional on every side and welds together, the waist muscle of the main muscle on mount type girder steel top and side again, again section steel beam week side top master's muscle and the lower bottom muscle around mount type girder steel stirrup, at last 90 degree on the reinforcing bar of concrete column week side are bent anchor on concrete beam or in the concrete slab, around the concrete column reinforcing bar that is positioned at the section steel beam side, install stirrup additional, add pull hook again on stirrup, the pull hook other end is welded on the section steel beam, forms steel mesh reinforcement on section steel beam, at last at section steel beam peripheral branch template, concreting.
The invention solves under the situation of no steel column the problem of using reinforced concrete post to be connected with section steel beam.Reasonable in design, reliable construction quality can reach the safety requirements of design fully.Adopt two reinforcing bars that belong to concrete column to penetrate section steel beam Ji listrium up and down, the curved method that anchors in the concrete beam, the bonding strength of enhanced type steel and concrete column in the construction.When not contour section steel beam or reinforced concrete beam and section steel beam crossed one another cross-under, the job practices that adopts section steel beam bottom end muscle to connect guaranteed during construction that the end muscle of low beam has 50% to pass section steel beam, and all the other 50% are welded on the web.The post, beam main tendon of wearing section steel beam adopt the mode of straight screw sleeve reinforcing bar jointing, the solution of essence post, the beam main tendon difficult problem that can't put in place.In order to solve the accurate position in the girder with rolled steel section en cased in concrete that section steel beam in the end forms, adopt in the section steel beam bottom steel to be set and to support, accurate to guarantee when the lifting section steel beam shaped steel depth of beam, axial location.The setting of stirrup is encrypted at section steel beam and reinforced concrete post node place, has satisfied the force request of column cap.Structure design (the girder with rolled steel section en cased in concrete layback muscle of structure design is soldered on the girder steel) in that the distributing bar of section steel beam side is established pull hook can closely link together reinforcing bar and section steel beam.
Description of drawings
Fig. 1 finishes the reinforced concrete post after the technology of the present invention and the connecting portion internal junction of section steel beam
The structure schematic diagram
Fig. 2 is the vertical view of Fig. 1
Among the figure: other section steel beam top master's muscle of 1-, 2-section steel beam, 3-stirrup, 4-master's muscle, 5-pull hook, 6-ut socket, 7-stirrup, 8-concrete column week, reinforcing bar, the 9-of side wore the reinforcing bar that muscle at the bottom of muscle at the bottom of beam steel, 10-stirrup, 11-waist muscle, the 12-, the 13-, 14-girder steel steel support muscle at the bottom of ironware, 15-vertical rod, 16-template, the 17-girder steel, 18-concrete column middle part
The specific embodiment
As Fig. 1,2 illustrate, a kind of steel column free type steel beam joint construction process, may further comprise the steps: at first make section steel beam 2, on section steel beam 2, bore the split bolt hole of reinforcing template, manufacture the straight thread silk head of the reinforcing bar that passes the section steel beam frange plate 18 upper ends at concrete column middle part then, between concrete column, install the template 16 of section steel beam 2, mount type girder steel steel supports ironware 14 on template 16, muscle 17 at the bottom of the mount type girder steel again, some vertical rods 15 are adopted in template 16 belows, divide two rows to support, the vertical pole ' s span in the row guarantees to be no more than 50 centimeters to satisfy the weight of section steel beam.(support the ironware place and set up 6 vertical rods establishing section steel beam, divide two rows to support, guarantee the support of section steel beam.)
Secondly, type lifting girder steel 2 is placed on section steel beam on the template 16, the end muscle 12 of other section steel beam that other and this section steel beam 2 intersect is installed, 13, wherein 50% end muscle 12 passes section steel beam, other 50% end muscle 13 are welded on the section steel beam 2, what install the frange plate up and down that passes section steel beam additional in the position of concrete column upper end wears beam steel 9, the reinforcing bar 18 of wearing beam steel 9 and concrete column middle part is connected by ut socket, concrete column tendon on section steel beam 2 tops installs stirrup 7 additional on every side and welds together, the waist muscle 11 of the main muscle 4 on mount type girder steel 2 tops and side again, mount type girder steel stirrup 3 around the top of section steel beam 2 all sides master's muscle and lower bottom muscle again, at last reinforcing bar 8 upper ends 90 degree of all sides of concrete column are bent anchor on concrete beam or in the concrete slab, around the concrete column reinforcing bar that is positioned at the section steel beam side, install stirrup 3 additional, on stirrup 3, add pull hook 5 again, pull hook 5 other ends are welded on the section steel beam 2, on section steel beam, form steel mesh reinforcement, at last at section steel beam peripheral branch template, concreting.Be provided with stirrup 10 outside the reinforcing bar 8 of all sides of the crossover sites of section steel beam 2 and concrete column, described stirrup 10 two ends are welded on the section steel beam 2.

Claims (1)

1. steel column free type steel beam joint construction process, it is characterized in that: may further comprise the steps: at first make section steel beam (2), go up the split bolt hole of boring reinforcing template at section steel beam (2), manufacture the straight thread silk head of the reinforcing bar that passes the section steel beam frange plate (18) upper end at concrete column middle part then, between concrete column, install the template (16) of section steel beam (2), go up mount type girder steel steel in template (16) and support ironware (14), muscle (17) at the bottom of the mount type girder steel again, some vertical rods (15) are adopted in template (16) below, divide two rows to support, vertical pole ' s span in the row guarantees to be no more than 50 centimeters
Secondly, type lifting girder steel (2) is placed on section steel beam on the template (16), the end muscle (12 of other section steel beam that other and this section steel beam (2) intersect is installed, 13), wherein 50% end muscle (12) passes section steel beam, other 50% end muscle (13) are welded on the section steel beam (2), what install the frange plate up and down that passes section steel beam additional in the position of concrete column upper end wears beam steel (9), the reinforcing bar (18) of wearing beam steel (9) and concrete column middle part is connected by ut socket, concrete column tendon on section steel beam (2) top installs stirrup (7) additional on every side and welds together, the waist muscle (11) of the main muscle (4) on mount type girder steel (2) top and side again, mount type girder steel stirrup (3) around top master's muscle of all sides of section steel beam (2) and lower bottom muscle again, at last 90 degree on the reinforcing bar (8) of concrete column week side are bent anchor on concrete beam or in the concrete slab, around the concrete column reinforcing bar that is positioned at the section steel beam side, install stirrup (3) additional, on stirrup (3), add pull hook (5) again, pull hook (5) other end is welded on the section steel beam (2), on section steel beam, form steel mesh reinforcement, at last at section steel beam peripheral branch template, concreting.
CN2008100794180A 2008-09-17 2008-09-17 Steel column free type steel beam joint construction process Expired - Fee Related CN101392558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100794180A CN101392558B (en) 2008-09-17 2008-09-17 Steel column free type steel beam joint construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100794180A CN101392558B (en) 2008-09-17 2008-09-17 Steel column free type steel beam joint construction process

Publications (2)

Publication Number Publication Date
CN101392558A CN101392558A (en) 2009-03-25
CN101392558B true CN101392558B (en) 2011-06-22

Family

ID=40493052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100794180A Expired - Fee Related CN101392558B (en) 2008-09-17 2008-09-17 Steel column free type steel beam joint construction process

Country Status (1)

Country Link
CN (1) CN101392558B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638913B (en) * 2009-08-21 2011-01-05 中国建筑第八工程局有限公司 Non-stretching straight-thread connection method of concrete beam reinforcing steel bars between two section steel columns
CN103982039B (en) * 2014-04-28 2014-12-24 温州建设集团有限公司 Girder steel bar steel passing lattice column magnetic seat drill perforating process
CN110924537A (en) * 2019-10-31 2020-03-27 江林 Construction process of H-shaped steel concrete transfer beam-reinforced concrete column joint
CN114482598B (en) * 2022-01-12 2023-09-22 广城建设集团有限公司 Building column strengthening structure and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2777087Y (en) * 2005-01-04 2006-05-03 华南理工大学 Joint structure for combined beam and concrete column
KR20080006342A (en) * 2006-07-12 2008-01-16 유승룡 Bolted Steel Joint of PC Concrete Column and Steel Beam by Rectangular Stress Block
CN101240566A (en) * 2008-03-13 2008-08-13 上海交通大学 Connection structure of square steel tube concrete column and I-beam joint

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2777087Y (en) * 2005-01-04 2006-05-03 华南理工大学 Joint structure for combined beam and concrete column
KR20080006342A (en) * 2006-07-12 2008-01-16 유승룡 Bolted Steel Joint of PC Concrete Column and Steel Beam by Rectangular Stress Block
CN101240566A (en) * 2008-03-13 2008-08-13 上海交通大学 Connection structure of square steel tube concrete column and I-beam joint

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李贤,肖岩,毛炜峰,安德森,周涛.钢筋混凝土柱-钢梁节点的抗震性能研究.《湖南大学学报(自然科学版)》.2007,第34卷(第2期), *
田占岭,杨家才.型钢混凝土结构施工技术.《科技资讯》.2008,(第12期), *
麦志豪.门式钢架轻型房屋钢结构设计及步骤与施工.《科技资讯》.2008,(第5期), *

Also Published As

Publication number Publication date
CN101392558A (en) 2009-03-25

Similar Documents

Publication Publication Date Title
CN203066232U (en) Building structure without form removal
CN206737141U (en) A kind of bolt connection assembled integral node
CN103741881B (en) Assembling frame post and construction method
CN102322101A (en) Construction method for formed steel reinforced concrete beam-column nodes
CN107882328B (en) Construction method of large-span steel truss suspension structure
CN209637112U (en) A steel pipe concrete pouring body with tension bars
CN105863046A (en) Prefabricated assembly type beam column joint connecting process
CN102418387A (en) Post-tensioning external prestressed steel beam and pre-tensioning prestressed superposed beam combined building structure system and construction technology thereof
CN111677299A (en) Lifting device and method for steel bar truss floor support plate
CN101392558B (en) Steel column free type steel beam joint construction process
CN105926925A (en) Joist steel cantilever beam of suspended scaffold and construction method thereof
KR101150369B1 (en) Complex girder for building
CN216196612U (en) Support structure of cantilever scaffold and support system of cantilever scaffold
CN213926774U (en) Prefabricated steel-encased concrete column and concrete beam joint
CN109972512A (en) A cast-in-place construction method for a profiled steel plate-concrete composite bridge deck
CN203716408U (en) Assembly type frame column
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN205804745U (en) A kind of precast concrete shear wall component
CN111236640A (en) A high-altitude formwork support and an outer scaffold share a cantilever structure
CN217292809U (en) Tension counterforce device for manufacturing prestressed beam by pre-tensioning method
CN210767211U (en) Assembled tenon fourth of twelve earthly branches concrete beam column connected node
CN116716812A (en) Construction method for solid section at top of main tower pier of river-facing super bridge
CN214696055U (en) Beam column connected node structure among shaped steel concrete structure
CN203654608U (en) Steel reinforced concrete column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110622

CF01 Termination of patent right due to non-payment of annual fee