CN203218793U - Combined tool box for power construction overhead working - Google Patents
Combined tool box for power construction overhead working Download PDFInfo
- Publication number
- CN203218793U CN203218793U CN 201320223934 CN201320223934U CN203218793U CN 203218793 U CN203218793 U CN 203218793U CN 201320223934 CN201320223934 CN 201320223934 CN 201320223934 U CN201320223934 U CN 201320223934U CN 203218793 U CN203218793 U CN 203218793U
- Authority
- CN
- China
- Prior art keywords
- safety
- combined tool
- tool box
- power construction
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 11
- 239000000463 material Substances 0.000 claims abstract description 26
- 239000000725 suspension Substances 0.000 claims abstract description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 230000000694 effects Effects 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract 1
- 239000007787 solid Substances 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 12
- 229910052742 iron Inorganic materials 0.000 description 6
- 238000003466 welding Methods 0.000 description 4
- 241001503987 Clematis vitalba Species 0.000 description 3
- 230000009194 climbing Effects 0.000 description 3
- 238000000151 deposition Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to the technical field of power construction, in particular to a combined tool box for power construction overhead working. The combined tool box comprises a material box, a material box suspension fixing mechanism, and tool hanging rings or hanging sleeves. By adopting the scheme, the combined tool box has the effects that: the combined tool box is fixed by adopting double screws, the installation is solid, the fall off phenomenon does not exist, the safety of operators is fully protected, the material box can be used for placing article such as cotter pins and wire clamps in use, and the placing problem of pole and tower operation tool and material is solved, thereby being in accord with the safety technical requirements. The combined tool box has the advantages of being simple in workmanship, convenient in fixation and high in safety factor, is conform to safety specification regulations, and eliminates the potential safety hazards.
Description
Technical field
The utility model relates to the power construction technical field.
Background technology
At present, in electric power system, when electric power facility is safeguarded, tend to relate to climbing tower bar, need high-rise working, particularly we have to carry instrument and carry out high-rise working, even sometimes need carry a lot of instruments, these instruments do not have the space of depositing in the high-altitude, and easily fall, the careless slightly thing that just has falls and pounds the ground handling personnel, bring threat more seriously also may for work high above the ground personnel's safety, bring inconvenience for our safety management of working site, if directly instrument is placed on the cross-arm of tower bar, do not meet the requirement of trouble free service rules, cause Work tool to come off easily, do not note slightly injuring accident by a crashing object, the staff takes also inconvenient, in order to address this problem, the workmen has designed a kind of power construction work high above the ground two-piece appliance case through careful consideration, has solved the placement problem of operating personnel's Work tool material on the shaft tower, also avoid simultaneously the generation of security incident, improved coefficient of safety and operating efficiency.
The tool storage device that three kinds of electric operating aspects are arranged in the prior art, and these three kinds of devices all to have common characteristics be exactly the work high above the ground that does not all relate to climbing tower bar, it all is tool storage device on the ground or that use during operation on the ground, and its structure difference very big with this novel existence, first kind is that a kind of large-scale Work tool is deposited combined bay, is mainly used in depositing of relatively large Work tools such as " temporarily drawing " " hammer ram ", " digging shovel ", " averruncator ", " crowbar ", " spade ", " folding ladder "; Second kind is a kind of composite type managing security tools and instruments storage box, comprise casing, case lid and folding, casing is connected by folding with case lid, the grid of a plurality of storing toolses is set in the casing, places insulating bar, electrical verification nib, general insulated tension pole head and ground connection the end of a thread in the grid of storing tools respectively.The third is a kind of standardized tool case, belong to the tool box that is used for placing electrician's utensil, comprise casing, case lid, equal liner is useful on and places the sponge die body that electric power overhaul is used Work tool in case lid and the casing, and the sponge die body is provided with the Baltimore groove adaptive with electrician's utensil shape.Therefore above three kinds of prior aries all with novel have very big different.
So be badly in need of a kind of device of depositing the electric power utensil that can be convenient and safe when climbing the operation of tower bar at present, can the convenient working personnel carry out electric power facility and safeguard and guarantee its safety.
The utility model content
This novel technical problem that will solve provides a kind of two-piece appliance case that can solve the placement problem of operating personnel's Work tool material on the tower bar, the generation of also avoiding security incident simultaneously, raising coefficient of safety and operating efficiency.
For solving the problems of the technologies described above, technical solution adopted in the utility model provides a kind of power construction work high above the ground two-piece appliance case, it is characterized in that: comprise material cartridge, material cartridge hangs fixed mechanism, and is provided with instrument link or hanging sleeve.
Furthermore described suspension fixed mechanism comprises transverse slat, U-shaped card, connect transverse slat and material cartridge reinforcing rod, be connected the riser of transverse slat and U-shaped card.Described instrument link or hanging sleeve are 4 to 10, are welded on the transverse slat side by side.Wherein the framework of material cartridge is made up of reinforcing bar, sidewall and bottom surface use iron plate to be combined into, material cartridge is by reinforcing bar and transverse slat welding, instrument link or hanging sleeve are welded on the transverse slat side by side, horizontal version is by perpendicular version and U-shaped card welding, the screw hole that two groups of correspondences are arranged between the top plate of U-shaped card and the lower plywood, the cross-arm that is used for wearing screw and tower bar is fixed.
The effect that adopts technique scheme to obtain: this device adopts two screws to fix; install firmly; there is not obscission; protected operating personnel's safety fully; material cartridge can be placed article such as drift bolt, wire clamp during use, can insert climbers in instrument link or hanging sleeve, Work tool such as cut greatly, conveniently takes and deposits; solve the placement problem of shaft tower operation Work tool material, met the safety specifications of " bigger instrument should be fixed on the firm member ".This device is done manual work simple, convenient fixing, and the coefficient of safety height meets the safety regulations regulation, has eliminated potential safety hazard.
Description of drawings
The structural representation of an embodiment of Fig. 1 the utility model;
Among the figure: 1, material cartridge 2, link or hanging sleeve 3, transverse slat 4, U-shaped card 5, screw 6, riser.
Embodiment
For solving the problems of the technologies described above, we describe according to figure, and this power construction work high above the ground two-piece appliance case comprises material cartridge 1 as shown in Figure 1, material cartridge 1 hangs fixed mechanism, and be provided with instrument link or hanging sleeve 2, and wherein material cartridge 1 is positioned at the foot of whole combined bay, and each limit of material cartridge 1 is that the reinforcing bar by diameter 0.5cm is welded, wherein grow limit 30cm, broadside 20cm is 10cm highly, and outer box wall welds with iron plate.
Described suspension fixed mechanism comprises transverse slat 3, U-shaped card 4, connect the reinforcing rod of transverse slat 3 and material cartridge 1, be connected the riser 6 of transverse slat 3 and U-shaped card 4.The welding of the two ends, long limit on a top of described suspension fixed mechanism bottom and material cartridge 1, the middle part that hangs fixed mechanism is made of instrument link or hanging sleeve 2 and transverse slat 3.Described instrument link or hanging sleeve 2 are the iron pipe of 1.5 cun of 4 to 10 long 5cm diameters, be welded on side by side on the transverse slat 3, this transverse slat 3 generally also adopts band iron, and the top of described suspension fixed mechanism is by riser 6 and U-shaped card 4 welding, and transverse slat 3 also welds together with riser 6.Two groups of corresponding holes of upper-lower position are arranged above the described U-shaped card 4, be used for wearing up and down screw 5 and fix with the cross-arm of tower bar.Can fix with cross-arm by the screw 5 by on the U-shaped card 4 when carrying out tower bar high-rise working, material cartridge 1 can be placed article such as drift bolt, wire clamp during use, can insert climbers and Work tool such as cut greatly and conveniently take and deposit in iron pipe.
The effect that adopts technique scheme to obtain: this device adopts two screws to fix; install firmly; there is not obscission; protected operating personnel's safety fully; material cartridge can be placed article such as drift bolt, wire clamp during use, can insert climbers in iron pipe, Work tool such as cut greatly, conveniently takes and deposits; solve the placement problem of shaft tower operation Work tool material, met the safety specifications of " bigger instrument should be fixed on the firm member ".This device is done manual work simple, convenient fixing, and the coefficient of safety height meets the safety regulations regulation, has eliminated potential safety hazard.
Claims (3)
1. power construction work high above the ground two-piece appliance case is characterized in that: comprise material cartridge (1), material cartridge (1) hangs fixed mechanism, and is provided with instrument link or hanging sleeve (2).
2. power construction work high above the ground two-piece appliance case according to claim 1 is characterized in that: described suspension fixed mechanism comprises transverse slat (3), U-shaped card (4), connect transverse slat (3) and material cartridge (1) reinforcing rod, be connected the riser (6) of transverse slat (3) and U-shaped card (4).
3. power construction work high above the ground two-piece appliance case according to claim 1, it is characterized in that: described instrument link or hanging sleeve (2) are 4 to 10, are welded in side by side on the transverse slat (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320223934 CN203218793U (en) | 2013-04-28 | 2013-04-28 | Combined tool box for power construction overhead working |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320223934 CN203218793U (en) | 2013-04-28 | 2013-04-28 | Combined tool box for power construction overhead working |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203218793U true CN203218793U (en) | 2013-09-25 |
Family
ID=49208296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320223934 Expired - Fee Related CN203218793U (en) | 2013-04-28 | 2013-04-28 | Combined tool box for power construction overhead working |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203218793U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103227432A (en) * | 2013-04-28 | 2013-07-31 | 国家电网公司 | Combined device box for power construction overhead work |
-
2013
- 2013-04-28 CN CN 201320223934 patent/CN203218793U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103227432A (en) * | 2013-04-28 | 2013-07-31 | 国家电网公司 | Combined device box for power construction overhead work |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103227432A (en) | Combined device box for power construction overhead work | |
CN103683088A (en) | Line bracing tool | |
CN204531457U (en) | The three-dimensional operation protector of a kind of power construction easy for installation | |
CN201374521Y (en) | Equipotential ladder | |
CN102761077B (en) | Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line | |
CN203218793U (en) | Combined tool box for power construction overhead working | |
CN201466574U (en) | Device for isoelectrically replacing insulator and accessory of iron tower of transmission line | |
CN205314654U (en) | Reinforcement iron tower of power transmission sequence | |
CN102704828A (en) | Multifunctional hook ladder | |
CN204144786U (en) | Unmanned plane installing 110kV-500kV line security ground wire device | |
CN201742027U (en) | Special tool for replacing insulators in electriferous state for 110kV single tower double circuit | |
CN104514485A (en) | Overhead-line rod working ladder | |
CN203826844U (en) | Electric power aerial operation platform | |
CN204369398U (en) | Insulation hoisting bracket | |
CN104184071B (en) | Unmanned plane installs 110kV 500kV line security ground wire device | |
CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
CN106602465A (en) | Power transmission line tangent tower first insulator replacement tool | |
CN207765393U (en) | A kind of bushing apparatus for voltage transformer high voltage safety tube | |
CN202564818U (en) | Substation equipment bolt charged fastening device | |
CN202153620U (en) | Equipotential working insulating platform | |
CN204243604U (en) | A kind of instrument with cable address bus shaft tower phase-sequence plate | |
CN205092110U (en) | Safe transformer rack | |
CN206259651U (en) | A kind of rural area fault maintenance activity device | |
CN205484430U (en) | Transformer high -voltage testing support | |
CN205791271U (en) | Fixing sleeve for wire stripper |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130925 Termination date: 20180428 |