CN103227432A - Combined device box for power construction overhead work - Google Patents

Combined device box for power construction overhead work Download PDF

Info

Publication number
CN103227432A
CN103227432A CN2013101528068A CN201310152806A CN103227432A CN 103227432 A CN103227432 A CN 103227432A CN 2013101528068 A CN2013101528068 A CN 2013101528068A CN 201310152806 A CN201310152806 A CN 201310152806A CN 103227432 A CN103227432 A CN 103227432A
Authority
CN
China
Prior art keywords
combined device
power construction
device box
safety
transverse slat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101528068A
Other languages
Chinese (zh)
Inventor
李广辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2013101528068A priority Critical patent/CN103227432A/en
Publication of CN103227432A publication Critical patent/CN103227432A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The invention relates to a combined device box for power construction overhead work, and relates to the technical field of power construction. The combined device box for the power construction overhead work comprises a material box, and a material box hanging and fixing mechanism, and is provided with tool hanging rings or hanging sleeves. With the adoption of the technical scheme, the combined device box has the benefits that the combined device box is fixed by double screws, is firm to mount, and does not drop; the safety of workers is protected completely; in a using process, articles such as drift bolts and wire clamps can be placed in the material box; the placing problem of devices and materials of pole and tower workers is solved; a requirement of a safety technique is met; and the combined device box is simple in working, convenient to fix, and high in safety factor, meets specifications of safety regulations, and eliminates potential safety hazards.

Description

Power construction work high above the ground two-piece appliance case
Technical field
The present invention relates to the power construction technical field.
Background technology
At present, in electric power system, when electric power facility is safeguarded, tend to relate to climbing tower bar, need high-rise working, particularly we have to carry instrument and carry out high-rise working, even sometimes need carry a lot of instruments, these instruments do not have the space of depositing in the high-altitude, and easily fall, the careless slightly thing that just has falls and pounds the ground handling personnel, bring threat more seriously also may for work high above the ground personnel's safety, bring inconvenience for our safety management of working site, if directly instrument is placed on the cross-arm of tower bar, do not meet the requirement of trouble free service rules, cause Work tool to come off easily, do not note slightly injuring accident by a crashing object, the staff takes also inconvenient, in order to address this problem, the workmen has designed a kind of power construction work high above the ground two-piece appliance case through careful consideration, has solved the placement problem of operating personnel's Work tool material on the shaft tower, also avoid simultaneously the generation of security incident, improved coefficient of safety and operating efficiency.
The tool storage device that three kinds of electric operating aspects are arranged in the prior art, and these three kinds of devices all to have common characteristics be exactly the work high above the ground that does not all relate to climbing tower bar, it all is tool storage device on the ground or that use during operation on the ground, and its structure and the very big difference of the present invention's existence, first kind is that a kind of large-scale Work tool is deposited combined bay, is mainly used in depositing of relatively large Work tools such as " temporarily drawing " " hammer ram ", " digging shovel ", " averruncator ", " crowbar ", " spade ", " folding ladder "; Second kind is a kind of composite type managing security tools and instruments storage box, comprise casing, case lid and folding, casing is connected by folding with case lid, the grid of a plurality of storing toolses is set in the casing, places insulating bar, electrical verification nib, general insulated tension pole head and ground connection the end of a thread in the grid of storing tools respectively.The third is a kind of standardized tool case, belong to the tool box that is used to place electrician's utensil, comprise casing, case lid, equal liner is useful on and places the sponge die body of electric power overhaul with Work tool in case lid and the casing, and the sponge die body is provided with and the adaptive Baltimore groove of electrician's utensil shape.Therefore above three kinds of prior aries all have very big different with the present invention.
So be badly in need of a kind of device of depositing the electric power utensil that can be convenient and safe when climbing the operation of tower bar at present, can the convenient working personnel carry out electric power facility and safeguard and guarantee its safety.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of two-piece appliance case that can solve the placement problem of operating personnel's Work tool material on the tower bar, the generation of also avoiding security incident simultaneously, raising coefficient of safety and operating efficiency.
For solving the problems of the technologies described above, the technical solution used in the present invention provides a kind of power construction work high above the ground two-piece appliance case, it is characterized in that: comprise material cartridge, material cartridge hangs fixed mechanism, and is provided with instrument link or hanging sleeve.
Furthermore described suspension fixed mechanism comprises transverse slat, U type card, connect transverse slat and material cartridge reinforcing rod, be connected the riser of transverse slat and U type card.Described instrument link or hanging sleeve are 4 to 10, are welded on the transverse slat side by side.Wherein the framework of material cartridge is made up of reinforcing bar, sidewall and bottom surface use iron plate to be combined into, material cartridge is by reinforcing bar and transverse slat welding, instrument link or hanging sleeve are welded on the transverse slat side by side, horizontal version is by perpendicular version and the welding of U type card, the screw hole that two groups of correspondences are arranged between the top plate of U type card and the lower plywood, the cross-arm that is used for wearing screw and tower bar is fixed.
The effect that adopts technique scheme to obtain: this device adopts two screws to fix; install firmly; there is not obscission; protected operating personnel's safety fully; material cartridge can be placed article such as drift bolt, wire clamp during use, can insert climbers in instrument link or hanging sleeve, Work tool such as cut greatly, conveniently takes and deposits; solve the placement problem of shaft tower operation Work tool material, met the safety specifications of " bigger instrument should be fixed on the firm member ".This device is done manual work simple, convenient fixing, and the coefficient of safety height meets the safety regulations regulation, has eliminated potential safety hazard.
Description of drawings
The structural representation of Fig. 1 one embodiment of the invention;
Among the figure: 1, material cartridge 2, link or hanging sleeve 3, transverse slat 4, U type card 5, screw 6, riser.
Embodiment
For solving the problems of the technologies described above, we describe according to figure, and this power construction work high above the ground two-piece appliance case comprises material cartridge 1 as shown in Figure 1, material cartridge 1 hangs fixed mechanism, and be provided with instrument link or hanging sleeve 2, and wherein material cartridge 1 is positioned at the foot of whole combined bay, and each limit of material cartridge 1 is that the reinforcing bar by diameter 0.5cm is welded, wherein long limit 30cm, broadside 20cm is 10cm highly, and outer box wall welds with iron plate.
Described suspension fixed mechanism comprises transverse slat 3, U type card 4, connect the reinforcing rod of transverse slat 3 and material cartridge 1, be connected the riser 6 of transverse slat 3 and U type card 4.The welding of the two ends, long limit on a top of described suspension fixed mechanism bottom and material cartridge 1, the middle part that hangs fixed mechanism is made of instrument link or hanging sleeve 2 and transverse slat 3.Described instrument link or hanging sleeve 2 are the iron pipe of 1.5 cun of 4 to 10 long 5cm diameters, be welded on side by side on the transverse slat 3, this transverse slat 3 generally also adopts band iron, and the top of described suspension fixed mechanism is by riser 6 and 4 welding of U type card, and transverse slat 3 also welds together with riser 6.The corresponding two groups of holes of upper-lower position are arranged above the described U type card 4, be used for wearing up and down screw 5 and fix with the cross-arm of tower bar.Can fix by screw on the U type card 45 and cross-arm when carrying out tower bar high-rise working, material cartridge 1 can be placed article such as drift bolt, wire clamp during use, can insert climbers and Work tool such as cut greatly and conveniently take and deposit in iron pipe.
The effect that adopts technique scheme to obtain: this device adopts two screws to fix; install firmly; there is not obscission; protected operating personnel's safety fully; material cartridge can be placed article such as drift bolt, wire clamp during use, can insert climbers in iron pipe, Work tool such as cut greatly, conveniently takes and deposits; solve the placement problem of shaft tower operation Work tool material, met the safety specifications of " bigger instrument should be fixed on the firm member ".This device is done manual work simple, convenient fixing, and the coefficient of safety height meets the safety regulations regulation, has eliminated potential safety hazard.

Claims (3)

1. power construction work high above the ground two-piece appliance case is characterized in that: comprise material cartridge (1), material cartridge (1) hangs fixed mechanism, and is provided with instrument link or hanging sleeve (2).
2. power construction work high above the ground two-piece appliance case according to claim 1 is characterized in that: described suspension fixed mechanism comprises transverse slat (3), U type card (4), connect transverse slat (3) and material cartridge (1) reinforcing rod, be connected the riser (6) of transverse slat (3) and U type card (4).
3. power construction work high above the ground two-piece appliance case according to claim 1 is characterized in that: described instrument link or hanging sleeve (2) are 4 to 10, are welded in side by side on the transverse slat (3).
CN2013101528068A 2013-04-28 2013-04-28 Combined device box for power construction overhead work Pending CN103227432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101528068A CN103227432A (en) 2013-04-28 2013-04-28 Combined device box for power construction overhead work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101528068A CN103227432A (en) 2013-04-28 2013-04-28 Combined device box for power construction overhead work

Publications (1)

Publication Number Publication Date
CN103227432A true CN103227432A (en) 2013-07-31

Family

ID=48837761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101528068A Pending CN103227432A (en) 2013-04-28 2013-04-28 Combined device box for power construction overhead work

Country Status (1)

Country Link
CN (1) CN103227432A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104269776A (en) * 2014-10-17 2015-01-07 国家电网公司 Electric automatic contraction band
CN105006773A (en) * 2015-07-23 2015-10-28 国网河南省电力公司平顶山供电公司 Operating method for unanchored ground conductor of power transmission line
CN105429047A (en) * 2015-12-17 2016-03-23 合保电气(芜湖)有限公司 Live working suspension apparatus
CN106653423A (en) * 2017-02-16 2017-05-10 国网冀北电力有限公司唐山供电公司 Grounding wire device with isolation switch and application method of grounding wire device
CN107069554A (en) * 2017-05-16 2017-08-18 国网山东省电力公司昌乐县供电公司 The portable performance box of electric power high-altitude construction
CN108580206A (en) * 2018-07-24 2018-09-28 广汽菲亚特克莱斯勒汽车有限公司 Automobile sealant collection device
CN108687736A (en) * 2018-07-26 2018-10-23 国网辽宁省电力有限公司铁岭供电公司 Power construction operation rotary portable tool box
CN110282337A (en) * 2019-07-16 2019-09-27 贵州电网有限责任公司 A kind of Work tool short distance transfer device
CN113746025A (en) * 2021-09-08 2021-12-03 中国南方电网有限责任公司超高压输电公司梧州局 Visual server maintenance auxiliary assembly of transmission of electricity

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202250118U (en) * 2011-10-18 2012-05-30 牛宏伟 Open type front canopy calipers
CN202405698U (en) * 2012-01-18 2012-08-29 重庆市电力公司江北供电局 Suspension type anti-falling tool storing bag for aerial work
CN102960924A (en) * 2012-10-26 2013-03-13 赵西建 Tool bag used for high-altitude operations
CN202874209U (en) * 2012-11-14 2013-04-17 甘粛省电力公司白银供电公司 Tool case special for high-voltage live working
CN203218793U (en) * 2013-04-28 2013-09-25 国家电网公司 Combined tool box for power construction overhead working

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202250118U (en) * 2011-10-18 2012-05-30 牛宏伟 Open type front canopy calipers
CN202405698U (en) * 2012-01-18 2012-08-29 重庆市电力公司江北供电局 Suspension type anti-falling tool storing bag for aerial work
CN102960924A (en) * 2012-10-26 2013-03-13 赵西建 Tool bag used for high-altitude operations
CN202874209U (en) * 2012-11-14 2013-04-17 甘粛省电力公司白银供电公司 Tool case special for high-voltage live working
CN203218793U (en) * 2013-04-28 2013-09-25 国家电网公司 Combined tool box for power construction overhead working

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104269776A (en) * 2014-10-17 2015-01-07 国家电网公司 Electric automatic contraction band
CN105006773A (en) * 2015-07-23 2015-10-28 国网河南省电力公司平顶山供电公司 Operating method for unanchored ground conductor of power transmission line
CN105006773B (en) * 2015-07-23 2017-09-15 国网河南省电力公司平顶山供电公司 A kind of transmission line of electricity non-anchored ground wire operational method
CN105429047A (en) * 2015-12-17 2016-03-23 合保电气(芜湖)有限公司 Live working suspension apparatus
CN106653423A (en) * 2017-02-16 2017-05-10 国网冀北电力有限公司唐山供电公司 Grounding wire device with isolation switch and application method of grounding wire device
CN106653423B (en) * 2017-02-16 2018-01-02 国网冀北电力有限公司唐山供电公司 A kind of grounding wire device and its application method with isolation switch
CN107069554A (en) * 2017-05-16 2017-08-18 国网山东省电力公司昌乐县供电公司 The portable performance box of electric power high-altitude construction
CN108580206A (en) * 2018-07-24 2018-09-28 广汽菲亚特克莱斯勒汽车有限公司 Automobile sealant collection device
CN108687736A (en) * 2018-07-26 2018-10-23 国网辽宁省电力有限公司铁岭供电公司 Power construction operation rotary portable tool box
CN110282337A (en) * 2019-07-16 2019-09-27 贵州电网有限责任公司 A kind of Work tool short distance transfer device
CN113746025A (en) * 2021-09-08 2021-12-03 中国南方电网有限责任公司超高压输电公司梧州局 Visual server maintenance auxiliary assembly of transmission of electricity
CN113746025B (en) * 2021-09-08 2024-06-21 中国南方电网有限责任公司超高压输电公司梧州局 Auxiliary equipment is maintained to transmission of electricity visual server

Similar Documents

Publication Publication Date Title
CN103227432A (en) Combined device box for power construction overhead work
CN204531457U (en) The three-dimensional operation protector of a kind of power construction easy for installation
CN201374521Y (en) Equipotential ladder
CN203218793U (en) Combined tool box for power construction overhead working
CN201466574U (en) Device for isoelectrically replacing insulator and accessory of iron tower of transmission line
CN205314654U (en) Reinforcement iron tower of power transmission sequence
CN204144786U (en) Unmanned plane installing 110kV-500kV line security ground wire device
CN201883761U (en) Indoor standardized guard fence for transformer substation
CN104514485A (en) Overhead-line rod working ladder
CN203722100U (en) Portable insulation platform
CN201742027U (en) Special tool for replacing insulators in electriferous state for 110kV single tower double circuit
CN204369398U (en) Insulation hoisting bracket
CN205170234U (en) Cantilever crane
CN204050726U (en) Fixed connector between framework and safety belt during work high above the ground
CN104184071B (en) Unmanned plane installs 110kV 500kV line security ground wire device
CN203632113U (en) Portable safety string bag for electric pole
CN106602465A (en) Power transmission line tangent tower first insulator replacement tool
CN203435837U (en) Multifunctional electrician stool
CN202153620U (en) Equipotential working insulating platform
CN205092110U (en) Safe transformer rack
CN206259651U (en) A kind of rural area fault maintenance activity device
CN205753040U (en) Wiring casing in a kind of Multifunctional electric cabinet
CN204243604U (en) A kind of instrument with cable address bus shaft tower phase-sequence plate
CN204793628U (en) Insulator spindle support
CN210186268U (en) Transformer overhauls safety belt linkage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130731