CN107069554A - The portable performance box of electric power high-altitude construction - Google Patents
The portable performance box of electric power high-altitude construction Download PDFInfo
- Publication number
- CN107069554A CN107069554A CN201710341663.3A CN201710341663A CN107069554A CN 107069554 A CN107069554 A CN 107069554A CN 201710341663 A CN201710341663 A CN 201710341663A CN 107069554 A CN107069554 A CN 107069554A
- Authority
- CN
- China
- Prior art keywords
- casing
- track frame
- electric power
- power high
- altitude construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
- Casings For Electric Apparatus (AREA)
Abstract
The invention discloses a kind of portable performance box of electric power high-altitude construction, including tool box, the tool box includes hinged casing and case lid, and the casing is provided with connector, the connector slidably connects track frame, and the track frame, which is provided with, can be articulated in fixing device on steel tower or cable;Guide rail of the track frame bottom surface provided with closure, the connector is slidably connected in the guide rail.Present invention is mainly used for electric power high-altitude construction operation, tool storage is in tool box, and tool box is mentioned after the parts such as precalculated position and cable, tower body with working position are connected by artificial or hanging device, you can is opened tool case cover, is carried out constructing operation.Without carry-on bearing tool, burden mitigates, and case lid can be used after opening as operating platform.During conversion operation station, casing can be pulled, it is moved to convenient position along track frame, it is easy to use, labor intensity and security risk are reduced, operating efficiency is improved.
Description
Technical field
The invention belongs to electric power high-altitude construction equipment technical field, it is used for more particularly, to one kind in electric power tower or height
When being constructed on stringing, it is easy to the overall performance box for carrying, convey, depositing and taking instrument.
Background technology
In electrical equipment construction, particularly in the installation and maintenance work of high-tension electricity steel tower, elevated line etc., workman
Usually climb on steel tower, and the operation on the cross-arm of steel tower of standing always.Due to being work high above the ground, it is necessary to the thing carried with
Compare many, in addition to necessary instrument, generally also to there is climbers, lifter plate, safety belt, ladder and pin nail, cat ladder, anti-fall dress
Put, body burden weight;Secondly as steel tower height generally all at tens meters, on be not easy next time, meanwhile, by construction work
Phase influences, to grab the duration, a class go it is latter as do not get off rest, labor intensity is big.In existing construction, workmen needs
Instrument be to carry with, take, be put into again in haversack after being finished at any time, that is, instrument is not from body.Workmen is with carrying on the body
Bear steel tower above and below instrument, and stand constructed in narrow cross-arm for a long time, not only body burden weight, working strength is big;
And it is constant to be taken action when operation and indexing, along with people is in high aerial work, many factors influence such as wind-engaging is inherently stood not
Surely, the instrument of carrying can influence the flexibility that it is taken action, and be unfavorable for construction safety.Also the workmen having, with oneself only carry compared with
Few instrument, to reduce labor intensity and security risk, but still exists and takes inconvenience and occur that instrument is not complete to ask
Topic.
The content of the invention
It is easy to carry the technical problem to be solved in the present invention is to provide one kind, conveys, accesses construction tool, workman can be mitigated
Burden, reduces security risk, and be easy to the construction operation case of work high above the ground.
In order to solve the above technical problems, the present invention include tool box, the tool box include hinged casing and
Case lid, it is structurally characterized in that the casing is provided with connector, and the connector is slidably connected in track frame, the track frame
Provided with fixing device on steel tower or cable can be articulated in.
The track frame is tripod, and guide rail of the track frame bottom surface provided with closure, the guide rail is grooved rail, the connection
Body is slidably connected in the guide rail.
One of summit of the track frame is provided with bearing pin, by the bearing pin that adjacent frame is hinged, with pin
Another frame of the relative track frame of axle is plugged in together by interface, and lock pin is provided with the interface.
A fixing device is respectively equipped with three frames of the track frame, the fixing device is mounting band, the extension
Tape splicing is provided with the adjustable hook in position.
The casing is provided with hanging joint, and the hanging joint is provided with hanging hole, hanging hole and is serially connected with fixing band.
The connector includes chassis, connecting strand and dop, and connecting rod is provided between chassis and dop, and dop is slided with guide rail to be connected
Connect, chassis and rod slide connection, connecting strand upper/lower terminal are connected with chassis and hanging joint or casing respectively.
The casing is provided with pull rope.
The box back surface, which is provided between the neck for being used for depositing track frame, two relative necks, is provided with fixing band.
The case lid and casing are hinged, and folding rod is provided between case lid and casing, and the cabinet wall is provided with instrument deck.
After said structure, because the present invention includes tool box and track frame, tool box passes through connector and track frame
It is slidably connected.In use, track frame and instrument can be stored in tool box in advance, and carried by artificial or hanging device
To after precalculated position, tool box is opened, the connection of the part such as cable, the tower body that track frame is passed through into its fixing device and working position,
Then the guide rail on the connector and track frame in tool box is connected.During construction, tool case cover is opened, you can take work at any time
Tool, is placed into case after being finished.Workman mitigates without carry-on bearing tool, burden;Case lid can be used as operating platform after opening
Use, instrument is picked and placeed conveniently.During workman's conversion operation station, by pulling casing, it is set to be moved to predetermined position along track frame
Put, it is easy to use.Flexible and convenient operation, reduces labor intensity and security risk.The work that can be disposably carried in casing
Tool is more, is conducive to improving operating efficiency;Meanwhile, during construction, other instruments that need not be carried with can also be stored in case in the lump
It is interior, overall conveying is carried out, can also mitigate the burden of steel tower above and below workman.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is overall schematic of the present invention;
Fig. 2 is inventive article case and track frame split schematic diagram;
Fig. 3 is schematic diagram after case lid of the present invention is fastened;
Fig. 4 is inventive article case schematic rear view;
Fig. 5 is use state schematic diagram of the present invention.
Embodiment
Referring to Figures 1 and 2, construction portable performance box in the electric power high-altitude includes a tool box 1 and track frame 4, and tool box 1 is wrapped
Casing 11 and case lid 12 are included, the bottom of case lid 12 with the bottom of casing 11 by hinge along being hinged, and case lid 12 easily can be opened and fastened,
Folding rod 13 is provided between case lid 12 and casing 11, when casing 11 is stood to when placing and opening case lid 12, case lid 12 is horizontal;Water
Flat-shaped case lid can also serve as platform and use, and both can carry out some simple Job Operations as support again with place tool.
The inwall of casing 11 is provided with the resilient tool deck 3 for being used for fixing operation instrument, and operation instrument is plugged on instrument deck 3.Track
Frame 4 is aluminum alloy tripod, and the bottom surface of track frame 4 is provided with the guide rail 43 that periphery insertion is closed, and guide rail 43 is grooved rail.Triangle track
One of summit of frame 4 is provided with bearing pin 42, by the bearing pin 42 rail that adjacent frame is hinged, relative with bearing pin 42
Another frame of road frame 4 is plugged in together by interface 44, and lock pin 45 is provided with its interface 44;Extract the track frame of lock pin 45 out
4 can open at interface 44, and be rotated centered on bearing pin 42, so that the part being connected with track frame 4 can easily enter
Guide rail.A fixing device 41 is respectively equipped with 4 three frames of track frame, the fixing device 41 is mounting band, mounting, which takes, to be provided with
Hook 411, hook 411 is flexibly connected with mounting band, to adjust the position of hook 411 according to the distance of mounting.Utilize mounting
Track frame 4 can be articulated on the precalculated position on steel tower, three frames by band is respectively equipped with a mounting band, carries out triangle and fixes,
The stabilization of track frame 4 is not only contributed to, and can easily adjust the position of track frame 4 as needed.The upper end of casing 11 is set
There is connector 5, connector 5 includes chassis 51, connecting strand 52 and dop 53, and connecting rod 55, dop are provided between chassis 51 and dop 53
53 be discoid, and disk dop is located in guide rail 43, and is connected with the slip of guide rail 43;Bearing is provided between chassis 51 and connecting rod 55,
Chassis 51 can flexible rotating, in order to adjust casing direction, the upper/lower terminal of connecting strand 52 connects with chassis 51 and casing 11 respectively
Connect.
Reference picture 1 and Fig. 3, the upper end of casing 11 of the present invention are respectively arranged on the left side and the right side hanging joint 2, and hanging joint 2 is provided with extension
Fixing band 6 is serially connected with hole 23, hanging hole 23, the fixing band 6 is buckle-type., can be by using fixing band 6 when needing artificial carry
The butting of casing 11 is convenient for carrying with operating personnel.Even need not manually it carry, can be by casing 11 using the fixing band
It is connected with tower body, plays a part of quadratic constraints fixation to casing.Hanging joint 2 is provided with snap ring 21, when operation construction location ratio
Relatively fix, it is not necessary to when adjusting box location, mounting fixation individually is carried out to casing 11 using the snap ring 21.It is real shown in Fig. 1
Example is applied, the lower end of connecting strand 52 is articulated on snap ring 21.Pull rope 14 is additionally provided with casing 11, when boundary of works area is larger, is utilized
The pull rope 14 can pull casing 11, casing is moved along the guide rail of track frame 4, be conducive to taking for instrument.
With reference to embodiment illustrated in fig. 4, the back side of casing 11 is provided with 2 parallel relative grooved rails 25, and grooved rail 25, which is provided with, to be used for
Deposit and a fixing band 24 is provided between the neck 22 of track frame 4, two necks 22.When in off working state, or means of delivery up and down
During case, triangle track frame 4 can be inserted between two necks 22, and be fixed with fixing band 24, easy to carry and use.
Shown in reference picture 5, in the use of the present invention, three of track frame 4 mount bands positions different from steel tower cable 7 respectively
Connection is put, plays a part of triangle fixation.A variety of construction tools can be deposited in tool box.After the case lid 12 of casing is opened, pass through
Case lid 12 can closely pull casing;When construction location and tool box farther out when, pull casing using pull rope 14, then pick and place
Instrument, it is easy to use.
Claims (9)
- The portable performance box 1. a kind of electric power high-altitude is constructed, including tool box(1), the tool box(1)Including hinged Casing(11)And case lid(12), it is characterized in that the casing(11)It is provided with connector(5), the connector(5)It is slidably connected There is track frame(4), the track frame(4)Fixing device on steel tower or cable can be articulated in by being provided with(41).
- 2. according to the portable performance box of electric power high-altitude construction described in claim 1, it is characterized in that the track frame(4)For triangle Frame, track frame(4)Guide rail of the bottom surface provided with closure(43), the guide rail(43)For grooved rail, the connector(5)It is slidably connected In the guide rail(43)In.
- 3. according to the portable performance box of electric power high-altitude construction described in claim 2, it is characterized in that the track frame(4)Wherein one Individual summit is provided with bearing pin(42), by the bearing pin(42)Adjacent frame is hinged, with bearing pin(42)Relative track frame (4)Another frame pass through interface(44)It is plugged in together, the interface(44)Place is provided with lock pin(45).
- 4. according to the portable performance box of electric power high-altitude construction described in claim 3, it is characterized in that the track frame(4)Three sides A fixing device is respectively equipped with frame(41), the fixing device(41)For mounting band, the mounting takes adjustable provided with position Hook(411).
- 5. according to the portable performance box of electric power high-altitude construction described in claim 2, it is characterized in that the casing(11)Provided with extension Joint(2), the hanging joint(2)It is provided with hanging hole(23), hanging hole(23)Inside it is serially connected with fixing band(6).
- 6. according to the portable performance box of electric power high-altitude construction described in claim 5, it is characterized in that the connector(5)Including chassis (51), connecting strand(52)And dop(53), chassis(51)And dop(53)Between be provided with connecting rod(55), dop(53)With guide rail(43) It is slidably connected, chassis(51)And connecting rod(55)It is slidably connected, connecting strand(52)Upper/lower terminal respectively with chassis(51)And hanging joint (2)Or casing(11)Connection.
- 7. according to the portable performance box of electric power high-altitude construction described in claim 6, it is characterized in that the casing(11)It is provided with and leads Messenger(14).
- 8. according to the portable performance box of electric power high-altitude construction described in any one of claim 1 to 7, it is characterized in that the casing(11) The back side, which is provided with, to be used to deposit track frame(4)Neck(22), relative two necks(22)Between be provided with fixing band(24).
- 9. according to the portable performance box of electric power high-altitude construction described in claim 8, it is characterized in that the case lid(12)And casing (11)It is hinged, case lid(12)And casing(11)Between be provided with folding rod(13), the casing(11)Inwall is provided with instrument deck (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341663.3A CN107069554B (en) | 2017-05-16 | 2017-05-16 | The portable performance box of electric power high-altitude construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341663.3A CN107069554B (en) | 2017-05-16 | 2017-05-16 | The portable performance box of electric power high-altitude construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107069554A true CN107069554A (en) | 2017-08-18 |
CN107069554B CN107069554B (en) | 2019-01-29 |
Family
ID=59610072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710341663.3A Active CN107069554B (en) | 2017-05-16 | 2017-05-16 | The portable performance box of electric power high-altitude construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107069554B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107877470A (en) * | 2017-12-22 | 2018-04-06 | 国家电网公司 | Multifunction insulating cat ladder tool box |
CN108687736A (en) * | 2018-07-26 | 2018-10-23 | 国网辽宁省电力有限公司铁岭供电公司 | Power construction operation rotary portable tool box |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103227432A (en) * | 2013-04-28 | 2013-07-31 | 国家电网公司 | Combined device box for power construction overhead work |
CN103414122A (en) * | 2013-07-26 | 2013-11-27 | 河南省电力公司信阳供电公司 | Hanging type tool box |
JP2016019290A (en) * | 2014-07-04 | 2016-02-01 | 中国電力株式会社 | Gauge fall prevention tool |
CN205543972U (en) * | 2016-04-12 | 2016-08-31 | 国网江西省电力公司南昌供电分公司 | Circuit examines and repair instrument case |
-
2017
- 2017-05-16 CN CN201710341663.3A patent/CN107069554B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103227432A (en) * | 2013-04-28 | 2013-07-31 | 国家电网公司 | Combined device box for power construction overhead work |
CN103414122A (en) * | 2013-07-26 | 2013-11-27 | 河南省电力公司信阳供电公司 | Hanging type tool box |
JP2016019290A (en) * | 2014-07-04 | 2016-02-01 | 中国電力株式会社 | Gauge fall prevention tool |
CN205543972U (en) * | 2016-04-12 | 2016-08-31 | 国网江西省电力公司南昌供电分公司 | Circuit examines and repair instrument case |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107877470A (en) * | 2017-12-22 | 2018-04-06 | 国家电网公司 | Multifunction insulating cat ladder tool box |
CN108687736A (en) * | 2018-07-26 | 2018-10-23 | 国网辽宁省电力有限公司铁岭供电公司 | Power construction operation rotary portable tool box |
Also Published As
Publication number | Publication date |
---|---|
CN107069554B (en) | 2019-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107265329B (en) | Dedicated guide pulley of unmanned aerial vehicle | |
CN106143199A (en) | The charging system that in vehicle, the power supply intergrant in space is combined with outer charging suspension | |
US8578604B2 (en) | Method of attaching a repair platform to a wind turbine | |
CN107069554A (en) | The portable performance box of electric power high-altitude construction | |
CN209554495U (en) | A kind of power ampere puts line apparatus | |
CN206908181U (en) | The portable performance box of electric power high-altitude construction | |
CN206290197U (en) | A kind of portable mobile tool box with extension ladder function | |
CN111976858B (en) | Auxiliary climbing robot for electric power emergency | |
CN105083350A (en) | Special vehicle for power maintenance | |
CN205791406U (en) | A kind of overhead transmission line shaking device | |
CN209896574U (en) | High-altitude line sliding operation platform | |
CN104113009A (en) | Cable lifting device | |
CN108862050B (en) | More changing device | |
CN207221144U (en) | A kind of safety belt backup protection rope fixing device for cement pole operation | |
CN110416918A (en) | It is a kind of to cross over bracket | |
CN105971489B (en) | Electric operating ladder | |
CN214828634U (en) | Portable lifting device for electric power engineering operation | |
CN210132487U (en) | Portable toolbox for high-altitude electric power operation | |
CN106786146B (en) | Tri- identical tower window list back transmission line compact linear towers of 500kV enter equipotential operational method | |
CN205772946U (en) | Power maintenance tool transport vehicle | |
CN209635762U (en) | Lamp box installs vehicle | |
CN211422494U (en) | Transformer substation capital construction closes ladder | |
CN207890942U (en) | A kind of electric pole suspender | |
CN209014615U (en) | A kind of alternating current-direct current matches electric detection means | |
CN218230019U (en) | Electric power overhauls auxiliary device and transport mechanism and portable mechanism thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |