CN206908181U - The portable performance box of electric power high-altitude construction - Google Patents
The portable performance box of electric power high-altitude construction Download PDFInfo
- Publication number
- CN206908181U CN206908181U CN201720536780.0U CN201720536780U CN206908181U CN 206908181 U CN206908181 U CN 206908181U CN 201720536780 U CN201720536780 U CN 201720536780U CN 206908181 U CN206908181 U CN 206908181U
- Authority
- CN
- China
- Prior art keywords
- casing
- track frame
- electric power
- power high
- altitude construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a kind of portable performance box of electric power high-altitude construction, including tool box, the tool box includes hinged casing and case lid, the casing is provided with connector, the connector slidably connects track frame, and the track frame, which is provided with, can be articulated in fixing device on steel tower or cable;The track frame bottom surface is provided with the guide rail of closure, and the connector is slidably connected in the guide rail.The utility model is mainly used in electric power high-altitude construction operation, tool storage is in tool box, mentioned by artificial or hanging device after the part such as precalculated position and cable with working position, tower body is connected in tool box, you can open tool case cover, carry out constructing operation.Without carry-on bearing tool, burden mitigates, and case lid can use after opening as operating platform.During conversion operation station, casing can be pulled, it is moved to convenient position along track frame, it is easy to use, labor intensity and security risk are reduced, improves operating efficiency.
Description
Technical field
The utility model belongs to electric power high-altitude construction equipment technical field, be used for more particularly, to one kind in electric power tower or
When being constructed on person's overhead route, it is easy to the overall performance box for carrying, convey, depositing and taking instrument.
Background technology
In electrical equipment construction, particularly in the installation and maintenance work of high-tension electricity steel tower, elevated line etc., worker
Usually climb on steel tower, and stand operated on the cross-arm of steel tower always.Due to being work high above the ground, it is necessary to the thing carried with
Compare more, in addition to necessary instrument, generally also to there is climbers, lifter plate, safety belt, ladder and pin nail, cat ladder, anti-fall device
Deng body burden weight;Secondly as steel tower height generally all at tens meters, on be not easy next time, meanwhile, by the construction period
Influence, to grab the duration, a class go it is latter as do not get off rest, labor intensity is big.In existing construction, what workmen needed
Instrument is to carry with, and is taken at any time, is put into again in haversack after being finished, that is, instrument is not from body.Workmen bears with oneself
Instrument steel tower up and down, and stands constructed in narrow cross-arm for a long time, not only body burden weight, working strength are big;And
And operation and it is indexable when take action constant, along with people is in high aerial work, many factors such as wind-engaging influence, and inherently stand not
Surely, the instrument of carrying can influence the flexibility of its action, be unfavorable for construction safety.Also the workmen having, with oneself only carry compared with
Few instrument, to reduce labor intensity and security risk, but still exist and take inconvenience and occur that instrument is not complete to ask
Topic.
The content of the invention
The technical problems to be solved in the utility model is to provide one kind and is easy to carry, conveys, accesses construction tool, can mitigate
Worker bears, and reduces security risk, and be easy to the construction operation case of work high above the ground.
In order to solve the above technical problems, the utility model includes tool box, the tool box includes hinged case
Body and case lid, it is structurally characterized in that the casing is provided with connector, and the connector slidably connects track frame, the track
Frame, which is provided with, can be articulated in fixing device on steel tower or cable.
The track frame is tripod, and track frame bottom surface is provided with the guide rail of closure, and the guide rail is grooved rail, the connection
Body is slidably connected in the guide rail.
One of summit of the track frame is provided with bearing pin, by the bearing pin that adjacent frame is hinged, with pin
Another frame of the relative track frame of axle is plugged in together by interface, and lock pin is provided with the interface.
A fixing device is respectively equipped with three frames of the track frame, the fixing device is to mount band, the extension
Tape splicing is provided with the adjustable hook in position.
The casing is provided with hanging joint, and the hanging joint is provided with hanging hole, fixing band is serially connected with hanging hole.
The connector includes chassis, connecting strand and dop, and connecting rod is provided between chassis and dop, and dop slides with guide rail to be connected
Connect, chassis is connected with rod slide, and connecting strand upper/lower terminal is connected with chassis and hanging joint or casing respectively.
The casing is provided with pull rope.
The box back surface is provided with the neck for being used for depositing track frame, and track frame fixing band is provided between two relative necks.
The case lid and casing are hinged, and folding rod is provided between case lid and casing, and the cabinet wall is provided with instrument deck.
After said structure, because the utility model includes tool box and track frame, tool box passes through connector and rail
Road frame is slidably connected.In use, track frame and instrument can be stored in tool box in advance, and will by artificial or hanging device
After it mentions precalculated position, tool box is opened, track frame is connected by parts such as the cable of its fixing device and working position, tower bodies
Connect, then connect the guide rail on the connector and track frame in tool box.During construction, tool case cover is opened, you can take at any time
With instrument, placed into after being finished in case.Worker mitigates without carry-on bearing tool, burden;Case lid can be used as operation after opening
Platform uses, and instrument picks and places conveniently.During worker's conversion operation station, by pulling casing, it is set to be moved to along track frame predetermined
Position, it is easy to use.Flexible and convenient operation, reduce labor intensity and security risk.Can disposably it be carried in casing
Instrument it is more, be advantageous to improve operating efficiency;Meanwhile during construction, other instruments that need not be carried with can also be deposited in the lump
Into case, overall conveying is carried out, can also mitigate the burden of steel tower above and below worker.
Brief description of the drawings
The utility model is further described with reference to the accompanying drawings and examples:
Fig. 1 is the utility model overall schematic;
Fig. 2 is the utility model tool box and track frame split schematic diagram;
Fig. 3 is schematic diagram after the utility model case lid fastens;
Fig. 4 is the utility model tool box schematic rear view;
Fig. 5 is the utility model use state diagram.
Embodiment
Referring to Figures 1 and 2, construction portable performance box in the electric power high-altitude includes a tool box 1 and track frame 4, and tool box 1 wraps
Casing 11 and case lid 12 are included, along being hinged with the bottom of casing 11 by hinge, case lid 12 easily can be opened and fastened at the bottom of case lid 12,
Folding rod 13 is provided between case lid 12 and casing 11, when casing 11 is stood to when placing and opening case lid 12, case lid 12 is horizontal;Water
Flat-shaped case lid can also serve as platform use, both can carry out some simple Job Operations as support again with place tool.
The inwall of casing 11 is provided with the resilient tool deck 3 for fixed operation instrument, and operation instrument is plugged on instrument deck 3.Track
Frame 4 is aluminum alloy tripod, and the bottom surface of track frame 4 is provided with the guide rail 43 of periphery insertion closure, and guide rail 43 is grooved rail.Triangle track
One of summit of frame 4 is provided with bearing pin 42, by the bearing pin 42 rail that adjacent frame is hinged, relative with bearing pin 42
Another frame of road frame 4 is plugged in together by interface 44, and lock pin 45 is provided with its interface 44;Extract the track frame of lock pin 45 out
4 can open at interface 44, and be rotated centered on bearing pin 42, so that the part being connected with track frame 4 can easily enter
Guide rail.A fixing device 41 is respectively equipped with 4 three frames of track frame, the fixing device 41 is mounting band, and mounting, which takes, to be provided with
Hook 411, hook 411 are flexibly connected with mounting band, so as to the position according to the distance of mounting adjustment hook 411.Utilize mounting
Track frame 4 can be articulated in the precalculated position on steel tower by band, and a mounting band is respectively equipped with three frames, carry out triangle and fix,
The stabilization of track frame 4 is not only contributed to, and can easily adjust the position of track frame 4 as needed.The upper end of casing 11 is set
There is connector 5, connector 5 includes chassis 51, connecting strand 52 and dop 53, connecting rod 55, dop are provided between chassis 51 and dop 53
53 be discoid, and disk dop is located in guide rail 43, and slides and connect with guide rail 43;Bearing is provided between chassis 51 and connecting rod 55,
Chassis 51 can flexible rotating, in order to regulating box direction, the upper/lower terminal of connecting strand 52 connects with chassis 51 and casing 11 respectively
Connect.
Reference picture 1 and Fig. 3, the upper end of the utility model casing 11 are respectively arranged on the left side and the right side hanging joint 2, set on hanging joint 2
There is hanging hole 23, fixing band 6 is serially connected with hanging hole 23, the fixing band 6 is buckle-type.When needing artificial carry, fixing band 6 is utilized
It can be convenient for carrying by the butting of casing 11 with operating personnel.Even need not manually it carry, can be by case using the fixing band
Body 11 is connected with tower body, plays a part of quadratic constraints fixation to casing.Hanging joint 2 is provided with snap ring 21, when operation construction position
Put comparison to fix, it is not necessary to when adjusting box location, individually mounting fixation is carried out to casing 11 using the snap ring 21.Fig. 1 institutes
Show embodiment, the lower end of connecting strand 52 is articulated on snap ring 21.Pull rope 14 is additionally provided with casing 11, when boundary of works area is larger,
Casing 11 can be pulled using the pull rope 14, casing is moved along the guide rail of track frame 4, is advantageous to taking for instrument.
With reference to embodiment illustrated in fig. 4, the back side of casing 11 is provided with 2 parallel relative grooved rails 25, and grooved rail 25, which is provided with, to be used for
The neck 22 of track frame 4 is deposited, a track frame fixing band 24 is provided between two necks 22.When in off working state, or it is defeated up and down
When sending tool box, triangle track frame 4 can be inserted between two necks 22, and be fixed with track frame fixing band 24, easy to carry and use.
Shown in reference picture 5, the utility model when in use, three of track frame 4 mounting bands respectively with steel tower cable 7 not
Connected with position, play a part of triangle fixation.A variety of construction tools can be deposited in tool box.After the case lid 12 of casing is opened,
Casing can closely be pulled by case lid 12;When construction location and tool box farther out when, pull casing using pull rope 14, then
Fetching tool, it is easy to use.
Claims (8)
- The portable performance box 1. a kind of electric power high-altitude is constructed, including tool box(1), the tool box(1)Including hinged Casing(11)And case lid(12), it is characterized in that the casing(11)It is provided with connector(5), the connector(5)It is slidably connected There is track frame(4), the track frame(4)Fixing device on steel tower or cable can be articulated in by being provided with(41), the track frame(4) For tripod, track frame(4)Bottom surface is provided with the guide rail of closure(43), the guide rail(43)For grooved rail, the connector(5)It is sliding It is dynamic to be connected to the guide rail(43)In.
- 2. according to the portable performance box of electric power high-altitude construction described in claim 1, it is characterized in that the track frame(4)Wherein one Individual summit is provided with bearing pin(42), by the bearing pin(42)Adjacent frame is hinged, with bearing pin(42)Relative track frame (4)Another frame pass through interface(44)It is plugged in together, the interface(44)Place is provided with lock pin(45).
- 3. according to the portable performance box of electric power high-altitude construction described in claim 2, it is characterized in that the track frame(4)Three sides A fixing device is respectively equipped with frame(41), the fixing device(41)To mount band, the mounting takes adjustable provided with position Hook(411).
- 4. according to the portable performance box of electric power high-altitude construction described in claim 1, it is characterized in that the casing(11)It is provided with and hangs Joint(2), the hanging joint(2)It is provided with hanging hole(23), hanging hole(23)Inside it is serially connected with fixing band(6).
- 5. according to the portable performance box of electric power high-altitude construction described in claim 4, it is characterized in that the connector(5)Including chassis (51), connecting strand(52)And dop(53), chassis(51)And dop(53)Between be provided with connecting rod(55), dop(53)With guide rail(43) It is slidably connected, chassis(51)And connecting rod(55)It is slidably connected, connecting strand(52)Upper/lower terminal respectively with chassis(51)And hanging joint (2)Or casing(11)Connection.
- 6. according to the portable performance box of electric power high-altitude construction described in claim 5, it is characterized in that the casing(11)It is provided with and leads Messenger(14).
- 7. according to the portable performance box of electric power high-altitude construction described in any one of claim 1 to 6, it is characterized in that the casing(11) The back side, which is provided with, to be used to deposit track frame(4)Neck(22), relative two necks(22)Between be provided with track frame fixing band(24).
- 8. according to the portable performance box of electric power high-altitude construction described in claim 7, it is characterized in that the case lid(12)And casing (11)It is be hinged, case lid(12)And casing(11)Between be provided with folding rod(13), the casing(11)Inwall is provided with instrument deck (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720536780.0U CN206908181U (en) | 2017-05-16 | 2017-05-16 | The portable performance box of electric power high-altitude construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720536780.0U CN206908181U (en) | 2017-05-16 | 2017-05-16 | The portable performance box of electric power high-altitude construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206908181U true CN206908181U (en) | 2018-01-19 |
Family
ID=61288795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720536780.0U Expired - Fee Related CN206908181U (en) | 2017-05-16 | 2017-05-16 | The portable performance box of electric power high-altitude construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206908181U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108748023A (en) * | 2018-04-28 | 2018-11-06 | 国家电网公司 | Bucket arm vehicle live line tool hanging plate |
-
2017
- 2017-05-16 CN CN201720536780.0U patent/CN206908181U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108748023A (en) * | 2018-04-28 | 2018-11-06 | 国家电网公司 | Bucket arm vehicle live line tool hanging plate |
CN108748023B (en) * | 2018-04-28 | 2020-11-24 | 国家电网公司 | Live working tool hanging plate of bucket arm vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107265329B (en) | Dedicated guide pulley of unmanned aerial vehicle | |
CN204152415U (en) | A kind of power transformation picture control probe ascend operation multifunction insulating ladder | |
US8578604B2 (en) | Method of attaching a repair platform to a wind turbine | |
CN107069554B (en) | The portable performance box of electric power high-altitude construction | |
CN206908181U (en) | The portable performance box of electric power high-altitude construction | |
CN111976858B (en) | Auxiliary climbing robot for electric power emergency | |
CN103950872B (en) | The vertical rod lifting multi-purpose tool of a kind of electric substation high-altitude equipment | |
CN210132487U (en) | Portable toolbox for high-altitude electric power operation | |
CN214543299U (en) | Electrified maintenance device for power transmission line | |
CN210389149U (en) | High-altitude operation device for electric power iron tower | |
CN207890942U (en) | A kind of electric pole suspender | |
CN212453552U (en) | Scaffold for building construction | |
CN213521040U (en) | Auxiliary assembly for power grid operation optimization configuration | |
CN108862050A (en) | More changing device | |
CN209635762U (en) | Lamp box installs vehicle | |
CN108033366A (en) | A kind of electric pole suspender | |
CN211422494U (en) | Transformer substation capital construction closes ladder | |
CN108678650B (en) | Modular protection frame is used in thermal power station construction | |
CN202474682U (en) | Portable and convenient type line hanging cable hook | |
CN206288805U (en) | Anti-skidding cable with guide function is around winding apparatus | |
CN211867760U (en) | Case for special grounding tool for cable route construction | |
CN206346559U (en) | A kind of multifunctional signal pylon | |
CN205512940U (en) | Multifunctional draw -bar box | |
CN206298283U (en) | Cable is around winding apparatus | |
CN211867749U (en) | Distribution network overhead line maintenance tool kit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180119 Termination date: 20200516 |
|
CF01 | Termination of patent right due to non-payment of annual fee |