CN204369398U - Insulation hoisting bracket - Google Patents

Insulation hoisting bracket Download PDF

Info

Publication number
CN204369398U
CN204369398U CN201420834893.5U CN201420834893U CN204369398U CN 204369398 U CN204369398 U CN 204369398U CN 201420834893 U CN201420834893 U CN 201420834893U CN 204369398 U CN204369398 U CN 204369398U
Authority
CN
China
Prior art keywords
phase
hoisting bracket
insulate
suspension
wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420834893.5U
Other languages
Chinese (zh)
Inventor
李麟凤
潘超
高杨
关自强
卢秋锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
Priority to CN201420834893.5U priority Critical patent/CN204369398U/en
Application granted granted Critical
Publication of CN204369398U publication Critical patent/CN204369398U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本申请涉及一种绝缘吊装支架,包括吊盘,在所述吊盘外圆周上间隔开设有凹口,在凹口内插接有伸缩杆,伸缩杆端部装设有吊环,在所述吊盘上还设置有与吊绳相连的连接结构。由于实施上述技术方案,本申请有效的保证带电作业安全距离,最大限度的对导线相间距离,相、地距离进行控制,提高作业安全和作业强度。通过使用本申请可一次性拆除、安装、起吊三相导线,改变了以往逐相拆除或安装导线的复杂工序,通过减少带电作业程序提高作业安全和作业强度;本申请结构稳固,在吊装过程中保证各相导线依次拆除时,剩余导线不会产生晃动,满足稳定要求,最大限度的保障了带电作业的人身及设备安全。

The application relates to an insulating hoisting bracket, which includes a suspension pan, and notches are spaced apart on the outer circumference of the suspension pan, and a telescopic rod is inserted into the notch, and a suspension ring is installed at the end of the telescopic pole. A connection structure connected with the suspension rope is also provided on the top. Due to the implementation of the above-mentioned technical scheme, the application can effectively ensure the safe distance of live working, control the phase-to-phase distance of the conductors, and the phase-to-ground distance to the greatest extent, and improve the operation safety and operation intensity. By using this application, three-phase wires can be removed, installed, and lifted at one time, which changes the complicated process of removing or installing wires phase by phase in the past, and improves work safety and work intensity by reducing live work procedures; Ensure that when the wires of each phase are removed in sequence, the remaining wires will not shake, which meets the stability requirements and maximizes the safety of people and equipment in live work.

Description

绝缘吊装支架Insulated Pendant Brackets

技术领域 technical field

本申请涉及一种电力线路在高空作业时使用的绝缘吊装支架。 The application relates to an insulating hoisting bracket used for high-altitude operation of power lines.

背景技术 Background technique

配网带电作业的普及使供电可靠性得到了极大的提高,带电更换或新立水泥电杆的工作已成为常规作业项目。随着城市化快速发展需求,架空线路走廊环境条件及对市容市貌的影响,致使对占地面积较大或妨碍交通环境的转角电杆、分支电杆或其他特殊杆型逐渐用新型的铁质窄基塔替代水泥电杆。在带电作业中,圆形水泥电杆有专业的电杆遮蔽罩进行可靠遮蔽,以防止带电作业过程中导线对电杆的碰触,但方形铁质窄基塔目前没有专业的绝缘遮蔽工具,导致在线路带电状态下无法完成更换或组立窄基塔的工作。 The popularization of live work in the distribution network has greatly improved the reliability of power supply, and the work of live replacement or new erection of cement poles has become a routine operation item. With the rapid development of urbanization, the environmental conditions of overhead line corridors and the impact on city appearance have led to the gradual use of new types of iron poles for corner poles, branch poles or other special poles that occupy a large area or hinder the traffic environment. Quality narrow base towers replace cement poles. In the live work, the round cement pole has a professional pole shield for reliable shielding to prevent the wire from touching the pole during the live work, but the square iron narrow base tower currently has no professional insulation and shielding tools. As a result, the work of replacing or assembling narrow base towers cannot be completed when the line is live.

现有技术中,带电起吊辅助装置大多是采用在绝缘板上装设吊环的结构,此种结构受力受绝缘板强度所限,不能起吊较重物体。 In the prior art, most of the live lifting auxiliary devices adopt a structure in which lifting rings are installed on an insulating plate. The force of this structure is limited by the strength of the insulating plate, and heavy objects cannot be lifted.

发明内容 Contents of the invention

本申请的目的在于提出一种受力强度高,可进行重物起吊,减少带电立杆工作流程的绝缘吊装支架。 The purpose of this application is to propose an insulating hoisting bracket with high stress strength, which can lift heavy objects and reduce the work flow of live poles.

本申请的目的是这样实现的:绝缘吊装支架包括吊盘,在所述吊盘外圆周上间隔开设有凹口,在凹口内插接有伸缩杆,伸缩杆端部装设有吊环,在所述吊盘上还设置有与吊绳相连的连接结构。 The purpose of this application is achieved in the following way: the insulating hoisting bracket includes a suspension pan, a notch is arranged at intervals on the outer circumference of the suspension pan, a telescopic rod is inserted into the notch, and a suspension ring is installed at the end of the telescopic rod. The hanging pan is also provided with a connection structure connected with the suspension rope.

由于实施上述技术方案,本申请有效的保证带电作业安全距离,最大限度的对导线相间距离,相、地距离进行控制,提高作业安全和作业强度。通过使用本申请可一次性拆除、安装、起吊三相导线,改变了以往逐相拆除或安装导线的复杂工序,通过减少带电作业程序提高作业安全和作业强度;本申请结构稳固,在吊装过程中保证各相导线依次拆除时,剩余导线不会产生晃动,满足稳定要求,最大限度的保障了带电作业的人身及设备安全。 Due to the implementation of the above-mentioned technical scheme, the application can effectively ensure the safe distance of live working, control the phase-to-phase distance of the conductors, and the phase-to-ground distance to the greatest extent, and improve the operation safety and operation intensity. By using this application, three-phase wires can be removed, installed, and lifted at one time, which changes the complicated process of removing or installing wires phase by phase in the past, and improves work safety and work intensity by reducing live work procedures; Ensure that when the wires of each phase are removed in sequence, the remaining wires will not shake, which meets the stability requirements and maximizes the safety of people and equipment in live work.

附图说明:本申请的具体结构由以下的附图和实施例给出: Description of drawings: the specific structure of the application is provided by the following drawings and examples:

图1是绝缘吊装支架结构示意图; Figure 1 is a schematic diagram of the structure of the insulating hoisting bracket;

图2是加装有吊臂的绝缘吊装支架结构示意图。 Fig. 2 is a schematic diagram of the structure of the insulating hoisting bracket equipped with a boom.

图例:1、吊装孔,2、连接孔,3、锁具,4、吊环,5、伸缩杆,6、挡板,7、吊盘,8、凹口,9、吊臂。 Legend: 1. Hoisting hole, 2. Connection hole, 3. Lock, 4. Lifting ring, 5. Telescopic rod, 6. Baffle plate, 7. Hanging plate, 8. Notch, 9. Boom arm.

具体实施方式: Detailed ways:

本申请不受下述实施例的限制,可根据本申请的技术方案与实际情况来确定具体的实施方式。 The present application is not limited by the following examples, and specific implementation manners can be determined according to the technical solutions of the present application and actual conditions.

实施例:如图1所示,绝缘吊装支架包括吊盘7,在所述吊盘7外圆周上间隔开设有凹口8,在凹口8内插接有伸缩杆5,伸缩杆5端部装设有吊环4。凹口8敞口处装设有挡板6,在所述吊盘7上还设置有与吊绳相连的连接结构,所述连接结构是指:在所述吊盘7圆面中心开设有连接孔2;或/和在非圆心处等距开设有吊装孔1。 Embodiment: As shown in Figure 1, the insulating hoisting bracket includes a suspension pan 7, and notches 8 are spaced apart on the outer circumference of the suspension pan 7, and a telescopic rod 5 is inserted into the notch 8, and the end of the telescopic rod 5 A suspension ring 4 is installed. A baffle plate 6 is installed at the opening of the notch 8, and a connection structure connected with a suspension rope is also provided on the suspension pan 7. Holes 2; or/and equidistantly provided with hoisting holes 1 at non-circle centers.

所述挡板6和吊盘7圆周壁上装设有配套的锁具3。 Matching locksets 3 are installed on the peripheral walls of the baffle plate 6 and the hanging pan 7 .

所述连接孔2为螺纹口,其内旋接有吊臂9,所述吊臂9上开设有吊孔。 The connecting hole 2 is a threaded opening, and a boom 9 is screwed inside it, and a hanging hole is provided on the boom 9 .

在使用一个单独的吊盘7时,可不加装吊臂9,将吊绳与连接孔2相连,根据待起吊装置的连接点位置,调节伸缩杆5长度,吊环4与待起吊装置相连,即可进行起吊。在使用时,伸缩杆5可能不会伸出凹口,此时需要将挡板6锁闭,防止伸缩杆5受力伸出,影响起吊平衡。 When using a separate suspension pan 7, the suspension arm 9 may not be installed additionally, the suspension rope is connected with the connection hole 2, and the length of the telescopic rod 5 is adjusted according to the connection point position of the device to be lifted, and the suspension ring 4 is connected to the device to be lifted, that is, Lifting is possible. When in use, the telescopic rod 5 may not protrude from the notch. At this time, the baffle plate 6 needs to be locked to prevent the telescopic rod 5 from stretching out under force, which will affect the lifting balance.

在待吊装置有多个连接点时,就需要使用多个吊盘7,此时将各吊盘7的连接孔2相对,并通过螺栓定位,同时加装吊臂9,吊绳与吊臂9上的吊孔相连。再根据待吊装置的连接点位置将伸缩杆5拉至不同长度,吊环4与待起吊装置相连,即可进行起吊。 When the device to be hoisted has multiple connection points, it is necessary to use a plurality of suspension pans 7. At this time, the connection holes 2 of each suspension pan 7 are opposite and positioned by bolts. The hoisting hole on the 9 links to each other. Then the telescopic rod 5 is pulled to different lengths according to the connection point position of the device to be hoisted, and the suspension ring 4 is connected with the device to be hoisted, so that lifting can be carried out.

以上技术特征构成了本申请的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要技术特征,来满足不同情况的需要。 The above technical features constitute the best embodiment of this application, which has strong adaptability and best implementation effect, and non-essential technical features can be added or subtracted according to actual needs to meet the needs of different situations.

Claims (7)

1. insulate a hoisting bracket, and comprise hanging scaffold, it is characterized in that: spaced apartly on described hanging scaffold excircle be provided with recess, in recess, be plugged with expansion link, expansion link end is equiped with suspension ring, and described hanging scaffold is also provided with the connection structure be connected with lifting rope.
2. insulate hoisting bracket as claimed in claim 1, it is characterized in that: described connection structure is for offer connecting bore at described hanging scaffold disc center.
3. insulate hoisting bracket as claimed in claim 1, it is characterized in that: described connection structure is for equidistantly to offer hole for hoist at the non-circle centre position of described hanging scaffold disc.
4. insulate hoisting bracket as claimed in claim 1, it is characterized in that: recess open-mouth is equiped with baffle plate.
5. insulate hoisting bracket as claimed in claim 4, it is characterized in that: described baffle plate and hanging scaffold circle wall are equiped with supporting lockset.
6. insulate hoisting bracket as claimed in claim 2, it is characterized in that: described connecting bore is screw thread mouth, is connected with arm in it.
7. insulate hoisting bracket as claimed in claim 6, it is characterized in that: described arm offers lifting hole(eyelet).
CN201420834893.5U 2014-12-25 2014-12-25 Insulation hoisting bracket Expired - Fee Related CN204369398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420834893.5U CN204369398U (en) 2014-12-25 2014-12-25 Insulation hoisting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420834893.5U CN204369398U (en) 2014-12-25 2014-12-25 Insulation hoisting bracket

Publications (1)

Publication Number Publication Date
CN204369398U true CN204369398U (en) 2015-06-03

Family

ID=53325636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420834893.5U Expired - Fee Related CN204369398U (en) 2014-12-25 2014-12-25 Insulation hoisting bracket

Country Status (1)

Country Link
CN (1) CN204369398U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104555702A (en) * 2014-12-25 2015-04-29 国家电网公司 Insulated hoisting support
CN106144882A (en) * 2016-08-12 2016-11-23 南通市源泉智能仪表产品有限公司 Novel crane traction apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104555702A (en) * 2014-12-25 2015-04-29 国家电网公司 Insulated hoisting support
CN106144882A (en) * 2016-08-12 2016-11-23 南通市源泉智能仪表产品有限公司 Novel crane traction apparatus

Similar Documents

Publication Publication Date Title
CN204230769U (en) Climb type steel cable ladder
CN102882153B (en) Phase replacing insulator string method in charged for replacement circuit many times towers
CN103227432A (en) Combined device box for power construction overhead work
CN108862014B (en) Assembled wall body hoists with steel shoulder pole structure of lifting by crane based on BIM
CN201390592Y (en) Special spreader for circuit breaker
CN204369398U (en) Insulation hoisting bracket
CN204391613U (en) A kind of wire support device of auxiliary replacement porcelain pole arm
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN102611035A (en) Special tool and method for charged replacement of middle-phase tension insulator
CN204927971U (en) A holding pole for live replacement of insulator strings on transmission lines
CN104410009A (en) Climbing type steel wire rope ladder
CN205187730U (en) Electric power angle -steel tower is with supplementary hoisting device
CN203867274U (en) Installing equipment for double cross arms
CN101378153A (en) Diverter for grounding wire
CN106785521A (en) A kind of combined type ground wire group
CN103318745B (en) A portable special spreader and its installation method
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN104836156A (en) Synthetic insulator simple ladder
CN104555702A (en) Insulated hoisting support
CN107558793B (en) A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof
CN207200123U (en) A kind of four line march-past wire lifting devices
CN206014242U (en) A kind of aid for lifting insulator
CN205772947U (en) Disconnecting switch hanging apparatus
CN104143783A (en) 10kV Live Pole Insulation Spreader and Operation Method Using the Spreader
CN203942210U (en) The charged vertical rod insulation spreader of 10kV

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

CF01 Termination of patent right due to non-payment of annual fee